Four out of five walls are now framed for the new closets. We tried to hang drywall over the existing ceiling, in hopes of having a finally flat ceiling, but that may have been worse than taking down the crap that was already there. And it was very frustrating. You should see the number of holes he and I both put in it! I picked out the wire shelving system (this one has several possible configurations) and some canvas baskets (mine are 2 dark brown with a blue strip on the top and 2 that are light brown, dark brown, and the same blue as the strip on the other baskets, except these are striped) to go in the master bedroom closet. I already have the paint, but flooring was questionable so I didn't get that. I think we decided on a somewhat reasonable, somewhat cheap ($0.81 per square foot) rug that has the colors of the paint and baskets. And I cleaned. I'm so tired of drywall dirt and dust everywhere. The thermostat is driving me crazy. Ed lost the cover and broke the little knob on the hot cold part. Worse, it's being persnickety now. If you don't know, mercury switches don't like being touched... ever. This one has been knocked around, dropped on the ground, things dropped on it, covered in insulation, drywall, and dust... it's not happy. I also did laundry, went to the grocery store, and had dinner/movie with my mom. We saw Madagascar2. Predictable, but good oneliners, just like the original.
For the master bedroom, I need is for my bubba to come put in the wiring for the light. Right now, I could finish screwing in the drywall, mud it, sand it, and paint it (that's a day's worth of work--done in one evening, first screwing it down then mudding it. Next it dries overnight. The other half day is spent sanding and painting). Then hang the wire shelving and fill the closet with clothes, shoes, shirts, bags... Not too bad. Might even do the first half day of drywall tonight. The washer/dryer closet has quite a bit left. It needs massive wiring and vent work. But once it's done, another of those day drywall half day/half day things, put up wallpaper that is already adhesive and put down vinyl tiles. The wallpaper is not directional, therefore, it'll only take a couple of hours, and the floor, maybe a half hour. It's 2 tiles X 4 tiles=8 tiles. So not too bad.
One project that has taken more than a year and the next is a month-month and half. Once it's done, the master bedroom can expand and get flooring. It is coming along. I'm ready to finish odds and ends, so I can just sit back a bit. I'm on the downhill side. And I'm on the downhill side of school. Only 6 months left (I HOPE they don't tell me to take any more classes! I'm still waiting). And the diet is on the downhill side; I've lost 22 pounds. I bought my new smaller jeans to celebrate; yea no more baggy jeans! I have little goals within the big goal. The big goal is my medically ideal weight, that which I weighed in college. I just passed the more than 20 pounds lost mark, and I'm smaller than I have been in the past 5 years. I have 4 pounds left to be more than halfway through, and the smallest I will have been in ten years (that is just after pregnancy). Next, I will have to lose 17 more to lose to be prepregnancy size. That will have to be when all my "small" clothes come out of storage. I'm actually looking most forward to this of anything! Then I will have to lose 7 more pounds to be the size I was in college, and at my ideal weight (117-131, and actually, I've been 112. It's too small. 128 is about right). I haven't decided what that reward will be. Whew! I just rechecked if I was small or medium frame. I'm medium. I was just sweating that I might want to head to the lower end or if I was just being anxious about doing what needed to be done. I'm good.
LF and Ed went to the boy/cub scout rocket launch this weekend. Nobody wanted to camp in 40 degree weather. Smart thinking! Other than that, they're just being a couple of guys. We had burgers and dogs for dinner last night. It was a nice change from the prepackaged crap I've been eating. Maybe a chocolate cake is in my future, not a whole one, I guess.
jazmynsmom
rob333 (zone 7b)Original Author
Related Professionals
Vicksburg Landscape Architects & Landscape Designers · Muskogee Landscape Architects & Landscape Designers · Amherst Landscape Architects & Landscape Designers · Vancouver Landscape Architects & Landscape Designers · Georgetown Landscape Contractors · Lewiston Landscape Contractors · Flint Landscape Contractors · Wenatchee Landscape Contractors · Plymouth Basement Remodeling · Marquette Basement Remodeling · Bennington Basement Remodeling · Liberal Basement Remodeling · Carlsbad Basement Remodeling · Las Vegas Basement Remodeling · Longview Basement Remodeling