Sequencing: plumbing, electric, drywall

17 years ago

Which comes first? I feel so stupid!

I've removed drywall behind the formerly leaking toilet, because I was worried that the leak meant a mold nightmare (luckily, no). I've also removed some drywall under the sink.

I need to have the plumber use a taller riser (is that the right term?) and replace the ugly black plastic pipe draining the sink with a pretty chrome or polished nickel colored one. The vanity is an open vanity, so the pipes show.

Meantime, I also want to move some electric boxes (which I know means drywall work), install new lights, and replace the fan. I know that logically I should have the electrician do rough electrical work now and finish work later, but I'm trying to save money, which means limiting the number of times people show up to do work.

Is it hard to install a light fixture? Can I DIY this? I used to hook up my stereo speakers in college by just twisting some wires together but since then I've gotten electricity-phobic.

So: plumber first, then electric, then drywall? Tile floor and beadboard wall last, I know (thank you, Bill V and others who answered my last question and saved me from disaster).

I am so confused by this. I gave up and called a general contractor. His bid (which includes the labor on the tile floor, but might not include plumbing) will be about $3500. I don't have $3500! I think I can pay a plumber $300-500, an electrician $200-300, a drywaller ???, and a tile person $500-1000? This bathroom is tiny! 5' x 6' with a 4' x 3' hallway section. (there's a shower too but that's Phase II of the project in my next lifetime)

Comments (2)

  • 17 years ago

    If you only need the plumber to do the little bit of work you mentioned in your post then it won't matter whether the electrical or plumbing is done first. If you were moving a lot of plumbing around in the room, then I'd probably do plumbing first.

    And it's easy to install a light fixture if the box and wiring is in place. All light fixtures come with instructions on how to do it.

    I've got no idea how much the various trades charge, as I DIY everything.

    Good luck.

  • 17 years ago

    blue,

    You're in the correct order. Typically the "big bulky" and "non-flexible" things get installed in the bays first; HVAC ducting, plumbing, etc. Then the "flexible ones" like wiring.

    If you need help wiring up light fixtures, no worries, I'll help you out when the time comes.

    Regarding your "taller riser" that you want to replace...the sink "tailpiece" is the thing that comes directly out of the bottom of the sink, it travels straight down and eventually connects to a "P-trap". Easy to replace.

    Some tailpieces have a little flange on the end like this:

    Some are threaded like this:

    {{gwi:1390890}}

    The top end with the flange goes up against the sink drain and it held up there with a nut, or if it's threaded, it threads in place. The other smooth end slides inside the trap assembly. Tailpieces are available in many lengths, if required you can get one a little long and cut it down with a hacksaw.

    Swapping out a plastic tailpiece and p-trap with metal ones is fairly simple and straightforward.

    The P-trap assembly looks like this:

    In the above photo, the vertical tailpiece coming out of the sink drain connects to the left side of the trap. the horizontal pipe running off to the right connects to your wall. Again, the horizontal pipe is also available in differing lengths. You can also buy a long one and cut it down to size.

    Since these are drain pipes and not subject to water pressure like the copper plumbing fittings on your supply side plumbing, these drain pieces are usually sleeved fittings (one pipe slides inside the other), and the nuts are simply hand tightened.

    Best, Mongo