Contractor Retainage

18 years ago

How common is it to hold a retainage from each contractor draw? Should it be 10% or 5% if any? My banker told me it was my call if I wanted him to hold a retainage from each draw. Please help asap, I have a meeting with contractor Monday 3-23-08.

Comments (10)

  • 18 years ago

    Ours is 10% at the end. But I'm just one person. I would definitely ask for it. You want some leverage.

  • 18 years ago

    If the retainage was not negotiated in the beginning it may not be your call at this point. If you need "leverage" with your GC, you should stop right now and find someone else that you trust. We have never experienced a client who wanted to withhold an amount from our agreed upon contract and called it "retainage". If it was asked, the job would not start.

  • 18 years ago

    For larger commercial projects retainage is a standard contract provision. It is usually equal to the profit part of the contractor's fee and is gradually reduced to zero in the final payments.

    Most residential contractors are not used to using professionally written contracts so you might have trouble getting them to agree to such a provision.

    There is no reason to consider it leverage or a breach of trust but for a small project it might not be necessary.

  • 18 years ago

    I see "retainage" as an amount with-held until all punch list items are completed. Doesn't make sense to me that a contractor would expect to be fully paid before all the work was done. If your contractor doesn't like the term retainage b/c he sees it as "leverage" or "lack of trust" tell him that you will not agree to close or approve his final draw until all punch list items are fully complete. Chances are good he'll change his mind about retainage.

    I must have talked to a hundred people in checking builder references before we settled on a builder and one of the most common complaints I heard - even from people who were otherwise quite happy with their builders - was that they never got around to finishing all the punch list items! Why should the builder bother if he has already been fully paid? His mind is already on his next build and your punch list is a knat without any sting whatsoever.

    Retainage is about making sure you don't pay for work that is not done. Sorry Bellamay, but if a GC INSISTED on being fully paid before the work is fully completed, I would tend to wonder if he was trustworthy.

  • 18 years ago

    Thanks to all for responding. bevangel, I agree with you. I'll hold the final draw until all punch items are completed. Nothing personal, just business. By the way we are happy with our choice of builder. There is no lack of trust with this builder. Interviewed several builders and got references before deciding on this builder. Also bevangel I agree with your comment to bellamay.

  • 18 years ago

    hello,
    i found a Blog for shopping,the items are very good,if you are free,please visit it.
    www.ant-shopping.com

    Here is a link that might be useful: http://ths.gardenweb.com

  • 18 years ago

    I would say 100% to hold the final draw until the punch items are completed. We closed over a month ago and there are still items we need addressed. We had to cancel a party because our builder did not come and pick up all the construction stuff. DH finally took it all out of the garage and just piled it up outside. Trying to get the builder back out is a HUGE issue. We did get a rebate back on our appliances and worked it out with the builder that he could have it since we went over a few hundred dollars on them. I have the rebate and he is not getting it until my darn microwave and tile gets done! LOL!

    Hope everything worked out at your meeting!

  • 18 years ago

    We didn't withhold enough from the final draw - we THOUGHT we did, but didn't. We held back 10K which is what I calculated it would cost us out of pocket to cover the known punch list and then I paid 5K of that when half the list was completed. The key word is "known". The "retainage" was based on the known punch list items. We could not ever have anticipated that just a couple of months after completion we would be dealing with a leaking pool and beautiful acid stained concrete floors that peeled because the flooring sub used a new product and "didn't know" he needed a bonder. These two issues alone will probably cost upwards of 100K, maybe more.

  • 18 years ago

    WOW!

  • 18 years ago

    Retainage of GC compensation is not intended to pay for contractor errors, only normal work and punch list items. It should be reduced gradually according to a prearranged schedule during the last phase of the project.