missymar_gw

14 Working Days Left, Is It Possible.........

19 years ago

That we'll be done by @ least the 30th???????? Things are getting nerve wrecking for us again! We absoluetely do not want to pay any more rent here in this apt. that will be due on 9-1st. The builder has said all along that we'd be done & closed by 8-31st. What's left to be done?:

- Hardwoods to Kitchen, KR, FR & study

- Carpet to all bedrooms

- More interior coats of paint

- Drywall touch-ups, Garage needs to be drywalled

- 3 cabinets need to be installed (for the Bathroom &

Laundry room) ordered around 8-3rd

- Paint deck, screen porch, columns, put up shutters, stain

front porch & screen porch ceiling wainscoting

- Granite counter tops

- Central Vac. Hook-up

- Install Hot Water heaters

- Plumber needs to go under the house to reach our master

tub to drill another hole for the pull-out handheld shower

(the tub has already been tiled)

- Plumbing fixtures put in

- Install remaining light fixtures

- Pour concrete walkway, driveway & patio

- Sod laid, trees & bushes planted

- Appliances put in

Reassure me, can it be done??? We are so ready to move!

Comments (11)

  • 19 years ago

    You need to express your concerns with your builder.
    Sounds like he may offer to pay an extra months rent for you.

    - or close before actual completion & put up with the comings and goings of construction guys while living there.

  • 19 years ago

    It sounds like it may be possible but would have to be scheduled very tightly by your builder. The hardwoods could take up to a week to get down if they are unfinished; you didn't indicate finished or unfinished. The plumber doing water heaters, fixtures and the tub work would take at least half a day maybe more. Obviously, the outside work could take place simultaneously with the interior work or could wait until you move in if not required for your CO. Talk with your builder and see what you can work out.

  • 19 years ago

    I was shocked at how much happened the last two weeks. I had a list a mile long too of things that needed to be done. Somehow, someway it did happen. The main problem I see for you is that you still need hardwood and concrete. Those are two items (especially hardwood) that requires people to stay away for days.

    We were banned from our house while the hardwood was going on. Our builder didn't even want the door opened and had keep out signs on every single door. I think it was 5-6 days that the house was in lock down.

  • 19 years ago

    I would be doubtful that it would be accomplished in 14 days. There are so many different trades represented by the list above that I think it would be a true scheduling snafu. Have you spoken with your builder, or in your case-your builder's agent, this week? It doesn't matter what they've said all along...it only matters what they say now. What are you willing to not have finished before you move in to make that deadline? If I were operating under a timecrunch, I'd give up the driveway and landscaping (if you can get a CO) and have that completed after move-in.
    Good luck...I'm sure it is very stressful!

  • 19 years ago

    Thanks all!

  • 19 years ago

    Hopefully, your builder is more organized and speedy than mine, but my builder told me yesterday that we will close the third week in September and we have the following tasks remaining (which seem fewer than yours):
    - Interior paint;
    - tile one shower and kitchen and laundry backsplashes;
    - install countertops;
    - finish hardwoods;
    - install carpet in two bedrooms;
    - install lighting fixtures;
    - install plumbing fixtures;
    - install appliances;
    - landscaping.

    All of our exterior painting, concrete work, and HVAC is completed (which remain on your list). My builder expects our remaining tasks to take another 6 weeks to complete. But, our builder moves very slowly.

    I certainly hope your's moves as quickly as you desire.

  • 19 years ago

    It is possible, but quite unlikely.

    It would be wise to have contingency plans in place.

  • 19 years ago

    I'm figuring about two weeks before my house can meet my lender's requirement for converting my construction loan into a perm. Finals will be done by next week, and all that's left right now is the photo voltaic system (the wiring is in, it's the panel installation), touch up painting, and the last light fixtures are going in today. Oh, and the reefer needs to go in, but it isn't getting here until early next week, but all the other appliances are in.

    I agree with the others who suggest you have a chat with your contractor. But I'd also be careful about moving in before everything is done, there are too many postings about contractors who never come back.

    Good luck! I understand completely how stressful it is!!
    Summer

  • 19 years ago

    Wait a minute...

    I just went back and read the Original Post. The only thing bad that happens if you're not finished by then is you have to pay another month's rent????

    I can understand that money is tight, but that hardly sounds like a disaster in the making.

  • 19 years ago

    I'm in the same situation. But as a builder. Clients are moving into 3,100+sf. next Thursday. Since the beginning of the month we will have: painted, installed hardwood, electrical finish (plugs, receptacles, pots and lights), tile, 1/3rd of finish trim, driveway, sod, plumbing finish, granite counters, oak railings and pickets, security finish. Only major thing missing will be the garage door--as the company contracted with in April didn't make the door.

    OTOH, I don't know your builder.

  • 19 years ago

    Well, our builder told us yesterday that we'll definitely be done & closed by the end of the month...... :) I'll let you know! We did get one more thing done - the countertops went in yest.!