Software
Houzz Logo Print
dcsrao

Lennox Central Air Conditioning

19 years ago

Hi, I live in Connecticut and my current "carrier" air conditioning needs replacement. I got a quote from a dealer for Lennox XC15 air conditioner with all parts, labor for installation along with the blower. The quote is for USD 9892.00. The dealer is willing to give me a 5% discount since I am also considering changing my oil tank and the burner and water heater....

My question is about the price. I think the dealer is reasonably well known and in business for a while. From what I have seen on other postings, this seems on the higher side. Any help in educating on what is a good price for something like this will be appreciated. Typically, what is the labor rate for the workers installing the air conditioners?

Comments (5)

  • 19 years ago

    How large of a system, and what work is to be done?

  • 19 years ago

    It is the Lennox XC15 a 3 tonner. work involves replacing the condensing unit outside, doing the duct work from the unit to the blower inside the attic. Installation of the blower itself and a slight modification to the existins duct work where the new blower is to be placed.

  • 19 years ago

    Only way to judge a bid is have another local contractor give you a price on comparable equipment.
    I know you northeasters have some pretty high juice bills but also have a short cooling season, I wonder if you'll ever recover the high premium for the 15 SEER over a 13 SEER.

  • 19 years ago

    Well, I could do 3 Goodman units for that price in Dallas. I can do 3 Payne units for that price also. (Carrier brand)
    If I charge full price, I can still do 2 units with a couple of thousand less in price. You may have a higher labor factor, but not that much. I expect to do a replacement system in a maximum of 2 days. I have done a complete replacement including repiping the gas, running new ducts, Bringing the ventilation to code, new exhaust vent thru roof, in 2 days. I am fat, old, and not as fast as I was when I started. It ain't rocket science.

  • 19 years ago

    Thanks guys. The guy who gave me the quote told me that 2 people will be working on it and could finish it all in one day. He assumed a 9 hour work day. So that makes it 18 hours of labor. And even at a high rate of 100 per hour, that is 1800 dollars on labor. So that makes it about 8000 for all the equipment and materials. I thought that to be rather steep. Has any one installed this system elsewhere? How can I get the cost of the equipment?