hgluckman_gw

Week 3 - Progress - Pics

16 years ago

Week 3 of our remodel project got off to a rousing start. The cabinet maker arrived with the few new cabinets that are being added.

Here's the new cabinet for the microwave (on the left) and the new Sub Zero enclosure - that's the old Sub Zero, the new one is being installed this morning:

From Kitchen Remodel

He also built a new cabinet for our new double ovens:

From Kitchen Remodel

For the island, we took off the old riser, which was a plaster and tile surface, and replaced it with three drawers that will go below the granite

From Kitchen Remodel

There was lots of activity besides the cabinet work. One thing that is still a bit of a problem is the supports for the granite top for the island. The GC had some supports made, but they were the wrong size. They also have set where they intend the supports to go without asking us how we wanted to look. I've got detailed drawings that would have told him how big to make the supports, and that show where we would have liked to have them. Now, the position of the supports will be driven by the opinion of the fabricator (and they can change where they'll go if they can), but I'm unhappy with his lack of willingness to look at the drawings I have before he starts making decisions.

Finally, one of our Bengals, Cassidy, had a dim view of all the noise yesterday

From Kitchen Remodel

Comments (10)

  • 16 years ago

    Is that an oak kitchen? Nice!

    I wish you a great Week 4 too. May you and the installers find common ground. :-)

  • 16 years ago

    Wow, you are zipping along! It's looking great, and it will be nice to have it finished so quickly! (We're in week 6 averaging about 2 days per week of work for the last 4 weeks while waiting for the next thing to come in -- windows, now cabinets). I hope you will enjoy the fruit of your efforts!

    Frustrating about the island supports -- we trust our GC completely but he sometimes makes unilateral decisions too. We've called him back on enough things that I think he is finally getting the picture to double check first.

    Great cats!

  • 16 years ago

    florantha: Yep, it's an oak kitchen. The cabinets were custom made for us when we built the house 19 years ago, and really everything is in good shape, but the fronts all neeeded refinishing. The cabinet guy is taking the fronts off as I type this. We're in some fear about what our cats (2 bengals) will do to us while the fronts are off. Anything breakable is going to be put somewhere else.

    jsweenc: yes, it is moving along well now. Last week was slow - only drywall work was done. Lots happening the last two days. It took a while, but we reached an understanding on the granite support for the island. I think it will turn out fine. The frustration is that it could have been figured out weeks ago. Water under the bridge, now.

    More pics later - appliances are in!

  • 16 years ago

    A very busy day today (It's about 4 pm MST, and they're still working). The appliances got delivered, the granite supports got set (templating tomorrow!), and the cabinet maker took all of the old doors/drawer fronts off for refinishing.

    Here's a few pictures. The whole project is available at the link below the pics.

    Our new Sub Zero BI36R all refigerator is in and working!

    From Kitchen Remodel

    Our new Kitchen Aid double oven is in, but not hooked up yet (maybe tomorrow for that):

    From Kitchen Remodel

    The granite support (with my Sketchup drawing being used for measurements (finally!):

    From Kitchen Remodel

    All the fronts are off the cabinets. We had to move the breakables to keep them safe from the Bengal Boys

    From Kitchen Remodel

    Also, a new tiled floor section is going in the family room leading to the deck. I built the cabinets behind the installer a few years ago

    From Kitchen Remodel

  • 16 years ago

    I have a feeling your kitchen is going to be another nice one!

  • 16 years ago

    Some other work is going on, but the big event today was templating for the granite countertops. Here's a couple of pictures:

    From Kitchen Remodel

    That's the raised island top with the drawers below it extended. Here's the main countertop. I'm virtually certain that it will be seamed at the sink.

    From Kitchen Remodel

    On Friday, we'll be going to the fabricator to see the templates put on our slabs. The fabricator forgot to take the new sink - a Blanco Silgranit 1-3/4 double bowl - with him. I guess we'll take it on Friday.

  • 16 years ago

    The big news now is that we actually have a working oven! Maybe we won't have to go out to eat tonight. Here it is:

    From Kitchen Remodel

    Also, the tiling of the hearth is complete (except for grout).

    From Kitchen Remodel

    Note the "buckles" between the tiles. We bought these to possibly be in our backsplash deco, but realized that they were meant to be used like this - they go on top with no cuts - and the hearth was the best place. Here's a closeup of the buckles:
    From Kitchen Remodel

  • 16 years ago

    The progress looks splendid!!

    But I'm so confused...is that an upside down cat or an upside down picture?

    The kitchen part makes much more sense and looks great.

  • 16 years ago

    pllog: It's mostly an upside down cat. During the days of the renovation, I'm sharing my upstairs office and another bedroom with our Bengal Boys. In the picture, Cassidy is on the hide-a-bed sofa, and I'm looking down at him. He's actually wedged in between a pillow and the back of the sofa. He's in a similar position right now. Since all of our cats have multiple names, he's also known as Slinky-Bee or just Slinkster. I hope I cleared up your confusion...

    I'm glad you like the kitchen. We're happy with the progress.

  • 16 years ago

    Thursday was mostly a painting prep day. The painter is turning out to be as aggravating as the other contractors. On Wednesday, I gave the painter the paint colors over the phone. One of them - the main wall color is staying as it is, but that color has to matched from the chip - it's not in the current catalog, so over the phone wasn't doing him a lot of good. I told him that DW would not be home between 8-10 in the morning, so he came at 9, looked around, and left his assistant to do the prep. In the middle of the afternoon, the assistant interrupted DW on a business call to ask where the color info was. She got him all of the colors, then he left it behind when he was done for the day. Arrrggghhh.

    Also, we moved out of the family room adjoining the kitchen at the start of the project, and it has been used to store things as we accumulate boxes, etc. The painters needed it moved - understandable. However, they just moved stuff anywhere not thinking about the mess they were making. Arrrrgggghhhh!

    There was a little construction progress. The external blower for the downdraft has been installed - on a snowy day, and the tile backer for the island backsplash is in place.

    From Kitchen Remodel

    This is the end of the island where the granite will overhang on the supports. The left side end will get a finished plywood panel to cover every thing up. At the exposed end we'll have a small slice of our 6x6 glass tile, and each corner will have a coppery corner-round tile. We get that tile today, so we can see what it actually will look like.

    Later this morning we go to see the templates applied to our slabs. I'll probably start a new thread for that.