6 months lurking on this site, everyone very helpful! so finally started my dig

16X35 Free form Gunite

OK Multi Brown Coping

Spill over spa (just changed design)

Boulder Coping on one side w/ waterfall

Swim Up bar

Large Baja Shelf - runs from spa to bar

All Pentair equip (intellitouch, brite)

WetEdge Matrix (Caribbean Shore)

anything i'm forgetting?

here goes pic attempt: finished day 2 of dig and tractors are outta there!

Comments (10)

  • 17 years ago

    more pics - had a shutdown from city for messing with some trees, back online last week, gunite in a couple days...neighbors trying to slow down the process unfortunately...

    everything look ok plumbing wise?

  • 17 years ago

    We were at Leslie's pool supply yesterday and the guy was trying to sell us one of those covers with the straps for a free form pool - seems like a better alternative to the fence around it -- but seems like a big pain to take on and off -- anyone use these? We don't have freezing issues and were planning on no cover, but if i can kill two birds it makes sense? What are the pros and cons of this type of cover? had just ruled out cover since we're doing free form...

  • 17 years ago

    Gunite flying this morning - feels real now!

  • 17 years ago

    some final gunite photos...

    stone work starts this week!

  • 17 years ago

    concrete poured for patio - stonework going slooowww but everything coming together slowly but surely - another week of stone work (bar, waterfeature, patio) and we should really see things clearly...

  • 17 years ago

    Looks great.
    Is this owner builder?

  • 17 years ago

    thanks! it is sort of O/B - I did the drawing and layout, then contracted a local PB to do the dig, the rebar and the gunite, equipment and plaster. - all one price for him with that included. Was really the right call as we ended up having a ton of problems with the city and the inspectors, and the local builder knew all the folks down there and worked on my behalf. I found my own stone/patio guy, my own electrician, and have two of my own laborers who do a bit of everything on the job every day to help. Was a decent selling point to the subs that here are two guys to do all the heavy lifting, move dirt, lift things, etc.

    I tried pricing out some of the pool specific jobs, but quickly realized I had no leverage or frame of reference to price it. The PB knows these guys and all of that was seamless, so not sure how much I WOULD have saved but feel good the way it's coming out. The PB has acted as GC for me somewhat, making sure all the subs work is to his liking, has pointed out a few things they did less than perfect and that was helpful.

    While I know I could have saved more had I subbed out the dig and rebar and gunite, it is not enough to offset the help we received from a strong local builder who's been around for 30 yrs.

  • 17 years ago

    bar constructed, flag patio completed -- pebble (wet edge carribean shore) goes in on monday -- synthetic grass goes in tuesday and we should be swimmin soon...patio guys took forever but happy with everything so far!

  • 17 years ago

    pebble day yesterday - we chose Caribbean shore from wetedge -- water trucks are lined up in front of the house (we are in drought in marin county, ca) so could not use hose...

  • 17 years ago

    finally we have water - trucks came (we used 5 of them) and had it filled in just under 2 hours - was awesome to watch her fill up! We are very happy with the wetedge costa del caribe -- we were prepared to have the water look bad then change but we are thrilled with the water color and the application...fire the pool up today, finish the landscaping in the next couple days and we are ready to use the yard again...