I have some disputes with my poolbuilder which I would like some opinions on....
The pool has been built but there is still a small list of items that still need to be completed. The problem is that the remaining uncompleted items are those that are not explicitly listed on the original contract but something that she agreed to do during the construction of the pool. Do I still need to pay the remaining due on the pool before all of the work is done? Can she pull out now and say that since it was not listed in the original contract, the things that she said she was going to do (via email) are not binding?
Also, is there anything can be determined to be implicitly covered (like installation of an pool alarm which is required to pass an inspection or electrical subpanel work that was charged after the construction was started)? These items were not covered in the original contract (as I did not know that they were needed) but I would have assumed a poolbuilder would have known about it.
How do we handle things if it ends up going to court? Any suggestions, opinions or information would be greatly appreciated.
Cheers...
gorilla_x
gorilla_x
Related Professionals
Pocatello Landscape Architects & Landscape Designers · Logan Landscape Architects & Landscape Designers · Sedalia Landscape Contractors · Rocky Mount Landscape Contractors · Tulsa Landscape Contractors · Davenport Landscape Contractors · Worcester Landscape Contractors · Albert Lea Landscape Contractors · Erie Landscape Contractors · Morgan City General Contractors · Concord General Contractors · Waterloo General Contractors · Plattsburgh General Contractors · Garden City General Contractors · Seattle General Contractorswrkinman
supper64Original Author
gorilla_x
concretehole
gorilla_x