Software
Houzz Logo Print
reneeharris1

Our DIY kitchen is finally being installed!!!!

18 years ago

I am beyond thrilled to finally have the end of this remodel in sight!! We gutted this kitchen back in September and have been slowing working through the stages of getting the area prepped.

We tore down two walls, completely re-wired the kitchen, moved a gas line, plumbed for a prep sink and bar sink and did a whole new ceiling and floor. We have been slaving over the four arches that branch off from this space and finally have them almost done.

My cabinets were delivered yesterday, the appliances come today and we begin installing tomorrow and Sunday with the help of a local handyman. We have been our own GC and done as much of the work ourselves as we could. We left the plumbing and gas lines to professionals!! :-)

Here's our 'blank canvas' and I'll post more pictures over the weekend as we begin installation. The cabinets are Kemper for the island in Amaretto Cream and the stained perimeter is a Rustic Beech.

Comments (5)