Software
Houzz Logo Print
jnh004_gw

Quote for Electrical work for Kitchen Remodel

15 years ago

So we are mid kitchen remodel in Savannah, GA. Demo is complete and new walls have been built. Now time for the Electrical work. We had an electrician come out and quote for the job. He will be removing our 220 for the old stove and putting a 110 because our new one is gas. He is moving plugs, 4 light switches, disposal switch, wiring for otr microwave, wiring for dishwasher, install of 3 pendant lights, and 6 recessed lights (its a one story house with an attic over the kitchen). I think I covered every thing the job includes. He quoted us $1350. And we have to purchase the pendants and recessed lights. So my question is, is this reasonable?

I know in a kitchen remodel I was supposed to be prepared for unexpected costs, but in my mind I just expected the electrical work would be a little less and I hate paying this much and pushing the budget!! Any help is appreciated. My contractor scheduled the electrician to be here at 9am tomorrow!! I am just feeling unsure about the whole thing!

Comments (10)

  • 15 years ago

    In my area (urban Northeast) that would be on the low side so I am assuming in GA it could be in the ballpark.

  • 15 years ago

    That sounds reasonable to me. I am from CT. I am remodeling my kitchen, doing all you have there plus installing under-cabinet lighting and installing outlets to code (old kitchen), wiring for a refridge, and wiring for a tv and I am paying $3800! My quote includes 8 recessed lights (4 in), but I have to buy the pendants. I quoted 3 other contractors and they were all in the same ballpark. At a minimum, you should get 2 more quotes. I was shocked by the electrical pricing.

  • 15 years ago

    Sounds very reasonable to me (in CA).
    It's very labor intensive work.
    I would say that's at least 3K here, probably 4.

  • 15 years ago

    I think its a good price, but I guess that's by NY costs.

  • 15 years ago

    I would have been thrilled with that quote and would have been checking to make sure he was licensed! Sounds good by me (Vancouver). Can I say one thing without sounding like I'm being critical - I would have gotten all those quotes plumbing, electrical, estimates for lighting etc before I started tearing down walls.

  • 15 years ago

    I'm another in a possibly more expensive area (North San Francisco Bay Area), and I also would be thrilled by that number.

    And I would never get just one bid or quote, but always at least three. And check their references, check with the BBB, and check with the state licensing board (if GA has one).

  • 15 years ago

    blfenton, you are right. This is the first time we have done a remodel and I was following the lead of my contractor. You live and learn. I just want to be sure I am not getting ripped off. My husband is in the afghanistan so I have to make these decisions without his help in it all. sooooooo... its not that we can't pay for it, its just more than I thought I was going to have to pay. Thanks for the input.

  • 15 years ago

    That sounds very reasonable to me too, especially if he is also suppling all the materials except for the lights. The price of copper has really increased.

    And please thank your husband for us!! I'll be praying for his safe return!

  • 15 years ago

    It's within reason - I paid about that much for my full gut job electrical work on a 10x15 kitchen with all new electrical done.

  • 15 years ago

    with electrical work over six or seven hundred bucks you should get a second quote.

    And why on earth would you remove the 220? There are more and more 220 volt over the range micro/connection/hood combos. Or you r some future owner for some reason may wish to put back a electric stove. there is no reason to remove it. rerunning anything after the walls are finished can cost massive amounts of money.

Sponsored
Haus Studio
Average rating: 4.8 out of 5 stars28 Reviews
Franklin County's Preferred Custom Cabinetry & Design Studio