Two more weeks to go...

15 years ago

Our general contractor said that everything will be finished by the 18th. The cabs, crown molding, wood floor, tiled floor, second floor laundry, refrigerator, and french doors are done.

Next the microwave will be plugged in (it's in the right place but needs an outlet to be installed). The french doors need to be tweaked because they aren't perfect yet. And a mudroom storage/coat shelf thing needs to be constructed...

The counters will be installed on the 12th, then the sinks will be set properly, the backsplash will be tiled, and the UCL, double oven, and cooktop will be wired.

Almost done... The conversion of the master bedroom closet to a closet/laundry room took a lot of effort and time by the team that has been working here. I think it would be appropriate to say that I COMPLETELY AND FULLY recommend Quality Lumber and Building Supply and Catlin Construction. Both are in Michigan. You'll see from pictures in a couple weeks... these gentlemen do impeccable work.