What a tease!

16 years ago

Friday evening the counter tops were supposed to be installed. Saturday was to be a three ring circus - A plumber under the sink, a tile guy building the backsplash, a refrigerator being delivered and installed, and contractor installing a new window.

Friday night the counter top crew arrived. They began to measure and cut the hole for the sink in the roughtop. The the fabricator went outside, and stood in the middle of the street to make a private cell phone call.

After the call he came back to me with the bad news, they had fabricated the countertop using the wrong sink template!

Hopefully someone will have a Silestone slab in stock Monday morning. If so then he thinks he'll be able to install the counter top on Tuesday. Hopefully the plumber can work on Wednesday, and if no more mistakes are made I can cook on Christmas.

The refrigerator did get installed, but there was no water supply to test the ice maker.

I'm not mad, just a bit dissapointed. If I ever had a week where I didn't make any mistakes, then maybe I'd be tempted to be mad. I feel bad for the fabricator, that must have really eaten into their profit for the job.

Today I had hoped to post some pictures of a nearly finished kitchen. Maybe Wednessday I'll be able to post something.