Software
Houzz Logo Print
bacin0

DIYers- would you do it again?

15 years ago

Getting nervously close to starting our kitchen remodel. My husband, who has recently retired, is planning on doing most of the work himself- both to save money and because he is pretty picky about things being done right. My fear of course is getting in over our heads so...would love to hear from some others who have tackled this huge job on their own.

What jobs did you do and which ones did you leave for the experts?

If you had to do it again, which jobs would you have had done professionally?

Any tips/advice for a DIY?

Comments (22)

  • 15 years ago
    last modified: 11 years ago

    Being that we will be starting a second major kitchen remodel, we are taking the following wisdom and applying it to this new kitchen.

    My husband can do it all but some things are just not worth it because the cost of hiring is minimal in comparison.

    My husband will do the plumbing and the electrical the "high ticket" items. He's not as fast as a professional but he has the knowledge and expertise to do it, which is most of what you are paying for.

    It seemed to take my husband forever to do the framing, drywall, sanding, etc....things that are fairly inexpensive to pay out for. We'll hire this out.

    If your project allows for it, try and do it in pieces w/o tearing the whole kitchen apart. For example we had a working kitchen all but 2 days. If this can't be done or you'll have more days of the kitchen out of commission, what alternatives can you utilize in the interim....having no kitchen can wear on a person

    For various reasons have everything decided BEFORE you start...cabinets, lighting, appliances, flooring, electrical changes, plumbing changes, etc. It's not only about a plan for the end result but how exactly it will be executed. Good luck.

  • 15 years ago
    last modified: 11 years ago

    I am a big fan of DIY, whenever possible. I have a few "war stories" myself, but everything was a learning experience. I just have to remember to acknowledge when something is beyond my expertise and may require professional knowledge.

    I guess a general rule I use is, if it involves special tools that cost more than hiring help (and you wouldn't use the tools again on a subsequent project), hire out. Or, if it involves something dangerously heavy or unwieldy.

    Also, maybe you are planning to already, but don't be afraid to roll up your sleeves and help him. It can make a huge difference to have an extra pair of hands! I sometimes wish I could grow a third hand for home projects...

  • 15 years ago
    last modified: 11 years ago

    We are currently nearing the end of a 2 month long kitchen DIY. We did everything ourselves except of course for the granite installation. Hubby even put in the dishwasher and all that entails. He is I.T. by profession but grew up building and renovating homes with his Father, luckily for us! He also builds furniture and is a complete perfectionist which is another reason he prefers the DIY method.

    We built both our homes from scratch, with the exception of the foundation on the first house and the foundation/framing on this house (17 yrs old). Over the last 3 years we have updated/upgraded almost every room in the house, leaving the kitchen to the end because it would be the most work and the most expensive.

    Having built new twice and now renovated a kitchen while living in the house I can safely say I would rather just build new again! LOL For a person who likes everything neat and tidy it was quite an ordeal.

    Both of us working full time and then coming home every night to work on the kitchen has been getting old lately!
    Prepare to be tired and give up your social life for a while if you want to get things done in a timely manner.

    I have repeatedly said throughout this that "it looks like my kitchen threw up and the contents landed in every room of the house"....and it nearly drove me crazy!

    All good advice you have rec'd so far....have a plan, know what you are buying and how much it will cost, expect it to take longer than you planned, expect gliches,,,,,cook a bunch of frozen meals ahead of time for the many nights that you won't have time/feel like/or have a stove to cook on!!

  • 15 years ago
    last modified: 11 years ago

    There are a number of threads about the hazards of DIY projects.

    The only way we could do our megaproject is DIY. I do wish that we'd hired knowledgeable carpenters for certain crucial moments, but am glad for donated labor, phone support, etc. from some carpenters who had volunteered to consult. We hired out of work friends for some of the labor--a good thing in some ways, but you can guess that sometimes it was less helpful.

    In a post (last spring perhaps?) I described an idea I wish I'd had--that we keep a diary/journal/notebook of decisions and plans. I would require that both spouses sign off on all items before they were acted upon. I would also require that when hiring a designer, etc. that that person also be required to sign off on everything. This would have prevented a number of hurtful things that haunted the early part of the work, such as two guys deciding something, building it, and then telling me about it afterward.

    It's easy to say that X is a "no sweat" item. Yet it's all hard, in some ways, no matter how good these hubbies think they are. Who would have thought that a new doorbell would have been such an object of strife recently, because it is too late to rewire the beloved electric one that has a mistake, so here, have this electronic piece of crap instead.

    The issue of time is very troubling in DIY--it's so blinkin' easy to take time off, get bogged down, overestimate, etc. etc etc. Professionals work more methodically and reliably. And, you don't have to face them across the dinner table or sleep with them when you hit a rough patch.

    Be sure to cultivate knowledgeable cohort of consultants, workers, experts, and counselors or confidants. Many of us use the GW as our place to vent.

  • 15 years ago
    last modified: 11 years ago

    yes.. absolutely.. it was tough, no doubt about it but my husband's weaknesses were my strengths (I'm great with mudding, sanding, painting, and design - DH is not)

    My husband is a mechanical engineer by trade so the permits/drawings were so simple for him and the plumbing/electrical was just about second nature. The only thing that's taking us a long time is the trim work.

    we did hire out the flashing on the roof for the vent pipe and range hood vent, our pitch is 12/2 as we have a cape cod and the cost of an emergency room visit exceeded how much it cost to have someone come in and do it LOL (something else to consider besides specialized tools is how much a trip to the emergency room may cost you).

  • 15 years ago
    last modified: 11 years ago

    We are just like you: DH just retired, we bought a 1980's house. Original plan was for him to everything himself. Like your husband, he is very good and very particular. But, I said he can move on to the basement and his "man cave" sooner If he would hire help on the kitchen. It worked! So, we hired a crew to demo and install windows, doors, skylights and frame new walls. Lots of physical labor. DH put up all the drywall and finished it. He did all the crown molding and baseboard, installed inside doors. We hired an electrician to work with him to reroute wires. This was also a good move- the attic has quite a mumble jumble of wires! But he did all the placement of light and receptacles and the installation. He wanted to install the hardwood floors himself, but, again I insisted NO. As he watched the guys install the 1650 sq ft in 8 hours, he agreed it was a good move. Also, they told us you can not rent a sander like they use. Now we are on to cabinets. When 73 boxes arrived, we decided to get help. Our KD asked her cab installers if DH could work with them, and they agreed to use only 2 installers instead of 3. So, cut costs a lot. The job is going very well. He now says he could've done it alone- but I think it would have been very stressful! Cabinets are expensive, and you don't want to mess up. He did all the plumbing and will install appliances. But we will hire a plumber run the gas line.
    Our project is a pretty big one. The existing kitchen was gutted and we moved inside walls to enlarge it. the family room was also gutted and got new doors and windows. We started Oct 6 and will have granite installed Dec 21. Then there will still be some finishing work to do.
    I'm sure it depends on the size of your project, but as others have said, it is good to hire some things out..
    Good Luck!

  • 15 years ago
    last modified: 11 years ago

    Me ... yes, in a heartbeat. We are still not done and over 3 years in planning and working. We are lucky in that this was our rental so not our main residence, we didn't have to "live" in it. I loved the research, scouting out and finding great materials (I had the luxury of time), planning, getting samples, dreaming, and making progress.

    DH, NO. He did most of the physical work and felt "owned" by the project. He missed(es) his "free" time (he's retired) to go pursue his many hobbies. It, at times, was a source of resentment and at other times a source of great pride and accomplishment for him.

    We should finish this within the next couple months and then plan on just enjoying our home, playing, relaxing, and traveling.

  • 15 years ago
    last modified: 11 years ago

    We are only partial DIYers---we hired out major things like electrical, plaster work, and some plumbing, so that only left us with smaller projects---but I'd definitely do it again. We are spending about half of what our lowest GC quote was, and learning a lot about the house in the process.

    However, we SERIOUSLY underestimated how long the DIY tasks would take us. I was all worried about keeping the contractors on schedule---they were great and finished right on time. Then it took us several weeks to trudge through our jobs, since we were squishing them in between work and other commitments. I would either take a chunk of time off of work to do it or be more realistic about the schedule. We are planning to tackle our bathroom in a few years, and it does have me seriously re-assessing that, since we only have one bathroom and can't afford for it to be out of commission as long as the kitchen has been. (Granted, we have not been out of the kitchen *that* long, but we're now in Week 6, and had hoped to finish by the end of November!)

  • 15 years ago
    last modified: 11 years ago

    Yes! I did most of the labor so far myself with the help of our house guy. It's saved me a TON of money that can go toward nicer fixtures, appliances, etc. instead of being sucked into labor costs.

    I've knocked down a load bearing wall, taken out a chimney, and ripped out hardwood floors and put in brand new ones. All that work, plus labor and supplies only cost me $1800.

    If I didn't do half the work myself I don't even want to think about what it would have cost.

    The work still left to be done is new counters, sink, dishwasher, backsplash and pantry and I'll help wherever I can. The more I participate the less it's costing me, so I'm all over it.

    If the budget matters, DIYing it will make the process easier on the checkbook.

    Plus, there is pride in being able to say you've done the work yourself, or at least participated in the process.

  • 15 years ago
    last modified: 11 years ago

    Yes. There is no way we would have redone our current kitchen if we hadn't DIY'd the bulk of it. In fact, the existence of IKEA cabinets is what got me started on redoing the kitchen. Absent that cost savings, it wouldn't have happened.

    You can do it. But you have to be totally realistic about the scope of the project, your timeline for completion, and your skill level. Don't scrimp on tools. Buy, borrow or rent what you need (wet saw, hammer drill, sander, table saw, etc.) Also, if working with a spouse or partner, you need to be in agreement about what constitutes something being "done". You might be a perfectionist and have in mind a certain finished product, but he is the muscle on that particular piece of the project and just wants to get it done.

    My DH is a hard worker and isn't afraid to try something. I'm not prissy and don't mind getting dusty and lifting heavy things. DH is much quicker to say "it'll do" than I am, and that caused some issues along the way. We also have a knack for always seeing the two diametrically opposed ways to go about completing any task -- so that has to be sorted out and somebody has to "win" so we can get going.
    _________________

    Our first kitchen redo was a semi-gut job of a 1950s kitchen in a 1926 house. When we started, we had been married exactly two months. Thankfully, we weren't yet living in the space. It cost about $12,000 in 2003.

    What we did DIY:
    - demo of cabinets, ceiling (plaster & lath) and hauling to the dump
    - removal and marking of trim (to be reused later)
    - cabinet layout
    - built a dummy wall against the exterior wall (house was hollow clay tile construction -- needed the depth of a 2x4 to run wires and hang cabinets)
    - new circuit for dishwasher, additional backsplash wiring, line for phone and cable
    - planned, installed and wired recessed lighting and wall-mount fixtures
    - paint
    - finished out a pantry area with beadboard-style paneling
    - installed backsplash (3 x 6 subway, rented saw)
    - finished floor (sand and poly on new heart pine)

    What we hired out -
    - cabinet install (Thomasville cabinets from Home Depot)
    - drywall (we started trying to do this ourselves and quickly gave up -- too big of a job with ceilings and all walls)
    - countertop (granite)
    - plumbing hookups
    - install of heart pine floor
    - new finish trim (deeper window trim, etc.)
    ____________________

    The current house was much more DIY. It also helped that we kept the existing flooring and didn;t move gas or plumbing. What was DIY:
    - kitchen plan
    - demo old cabinets and some drywall and haul to dump
    - build new wall, hang and finish drywall
    - build cabinets (IKEA), drill for and install hardware
    - install cabinets (including spacers and trim)
    - install recessed lighting
    - update wiring (was in the countertop, ca. 1978), new outlet in pantry for MW
    - install backsplash
    - install range hood
    - paint

    Paid pros to:
    - install quartz countertop
    - plumber to hook up sink, faucet, disposal, DW

  • 15 years ago
    last modified: 11 years ago

    Just make sure he has the right tools. the 23 gauge pinners (Grex or Cadex) are a must have.... Seriously - It will be important to have good help on some of the installations and proper tools.

  • 15 years ago
    last modified: 11 years ago

    Yes, I'd do it again. DH would need some convincing. We DIYed everything.

    -Demo'ed down to the studs and pulled up 7(!) layers of flooring. That was DH, myself, friend, and 14yo(12 at the time.)
    -Garden Window & French door install - DH, myself, and friend.
    -Cabinet install(Kraftmaid) - DH and myself.
    -Glue-down Cork tile floor install - myself.
    -Appliance & Sink install - DH, myself, and friend(he's a plumber/HVAC guy by trade)
    -Electrical - DH.
    -Soapstone counter install - DH and myself with help from 6 burly gym going friends to move the monster sized peninsula piece.
    -Tile Backsplash - myself
    -Wine & Liquor Hutch - I designed it, DH built it, I painted it.
    -Trimwork - DH

    I think jakabedy's statement was spot on and bears repeating:
    My DH is a hard worker and isn't afraid to try something. I'm not prissy and don't mind getting dusty and lifting heavy things. DH is much quicker to say "it'll do" than I am, and that caused some issues along the way. We also have a knack for always seeing the two diametrically opposed ways to go about completing any task -- so that has to be sorted out and somebody has to "win" so we can get going.

  • 15 years ago
    last modified: 11 years ago

    DH and I are another couple that has done major DIY projects together. My main advice is spend the money to get the right tool - or pay someone else who has the right tools to do the work for you.

    We had to hire the power company to take down our overhead service and install it underground, and we hired a excavation company to put in the new septic system, trench in new water lines and dig the whole for the basement.

    The biggest thing with DIY is it will take a lot of time, but you don't have to pay for change orders (I'm a queen with them) and if you something looks off, you can stop right there and figure it out.

    As to doing it again, I'm be for it but my husband has said he would not be so I'd need a new husband first. But he's talking about doing something like we're just getting done with, an eight year complete gut and fix of an old farmhouse that was about ready to fall down.

    you also have to know your strengths. I'm a great planner. I do the layout and design and give cut sheets to DH. If I can provide plans, he can build it.

    You also have to make sure you work within codes. DH and I are very particular about that one, though we do the work ourselves we have no interest in taking short-cuts.

    We did our first DIY project about 25 years ago, so we've had lots of time to learn how to work together, and we work amazingly well as a team. I have a few siblings that soon realized they could not do any big DIY project without jeopardizing their marriage. That's a real important thing to know. Major DIY can be very stressful to a relationship.

    Take lots of pictures. They can come in handy if you don't remember exactly where the wires are - but more so when you get discouraged that you haven't got much done, you can go back and look and see just how far you have come.

    Cathy

  • 15 years ago
    last modified: 11 years ago

    I have noted in other threads that one thing we did not budget for is rental equipment. We spent probably $2000 to $3000 in rental--DH believes it's much less, but I don't. You think you need the wetsaw for a day, it turns into a 3 day weekend; you set up the scaffolding and the crew doesn't show up, you start with a piece of equipment and then you return it but later you rethink that part of the wall and then you have to re-rent the gizmo, etc etc etc.

    Also, a non-contract work crew has its own problems. We killed precious daylight fetching and bringing home two guys who needed a ride. Or, sometimes, workers said yes, they'd come and then they'd phone saying something came up. AARGH!
    _______________

    DIY will show you just how independent or non-independent you really are. Don't let DH watch that show on PBS they play once in a while that shows a guy in Alaska in the 1940s who lives entirely alone and builds a cabin and lives on the land--he'll think he's the star of a similar drama.

    DH's pride as builder and worker is his polestar with the big addition/remodel/energy update but mine is not. I'm not the Lone Ranger, he is. My pride is more involved with did I get what I asked for, which makes some of the compromises and unfulfilled plans hard to take. "Get over it" had to be a mantra to memorize; I can be a sore loser. Letting go of things after dreaming them up is harder than you think.

    Hope you have a good marriage. Probably the hardest thing was the realization that DH needed time away, on HIS terms, not on OUR terms. He's had a number of vacations; I haven't. I keep saying, just get on with it, then we can party, but 9 months into things, he heard the call of the salmon, then the X, then the Y, etc. I can't blame him--it's hard to live in your own muddle and be a drudge with no end in sight. We're gonna put the project on hold more often now, I think, and do some stuff together. But that makes the house more like those projects without an end that other people have and I hate that. I do want it done very soon. Meaning June?

  • 15 years ago
    last modified: 11 years ago

    If you would have asked me on the day that husband decided to finish the drywall (badly) when that was my job I would have said "NO" I would not do it again. However, as far as working together on a project goes that was our biggest disagreement so after reflecting I would say, most certainly Yes Yes I would do it again. Someone above mentioned something about knowing each others strengths and weaknesses and I cant stress enough how important that is. And, you do need a strong marriage. Ours survived me having husband take upper cabinets off the wall after install because they were not perfect and reinstalling them. We also survived me having husband take some tiles off the wall and redoing because they were not perfect. If I did something that was less than perfect I redid it and this sometimes bothered husband because he thought it fine. We have done endless projects together and husband does good work but he is also man enough to know when he gets tired he makes mistakes that I will not live with. Do not work exhausted! During DIY's you will come to areas that need brainstorming from both of you and where there is no room for big egos if you want a good solution. I think this is one of our strengths but could be the downfall of others who may not be used to doing diy together.

    It may also be helpful to know a little about how the emotional rollercoaster works during a kitchen remodel to help you through each stage. There are times when it is all so overwhelming that you do not even want to start at the beginning of a day. Know that this passes with each little achievement. You will have stretches where there is much excitement only to fall back into days of getting stuck on something. Then it starts all over again. If you really want to enjoy coming to the finish line towards the end try to do a lot of those little things and touchups as you go. You will still have a list of small annoying things to do at the end but not so much that it ruins the happy ending.
    For us it was a happy ending. I should also note that we have a stage two coming up this summer where we will be doing a wall near kitchen with matching cupboards and a sort of wet bar buffet side board extra storage thingy. So, it's all good.

  • 15 years ago
    last modified: 11 years ago

    We started the demo on our DIY kitchen renovation on November 6th. The existing ktichen was removed the following weekend, so I've been kitchen-less for a month and the cabinets aren't going to be ready until the week after new years.

    We foolishly thought is we started before Thanksgiving we'd be done by Christmas - that was our biggest mistake.

    But really, that's the only one I can think of so far.

    We removed a load bearing wall and a 5' wide sunporch and completly rebuilt it (with a header in place of the wall), new windows, new doors, new floor. We had a crew of 5-6 friends over the course of a weekend for that part. Everything else we've done ourselves so far except my cousin had to help DH hold up the drywall for the ceiling in the back room area b/c I'm too short.

    This weekend DH is working on replacing the water heater and installing a new oil burner/tank so we can get rid of the chimney, then we can remove the old subfloor and level the floor before installing the radiant heat.

    Because we're DIY-ing everything (except the installation of the cabinets and granite) it's definitely taking longer but we're able to do some moderate upgrades that we otherwise wouldn't have been able to afford.

    But in all honesty, not diy-ing wasn't really an option for us. we're both in our early 30s and have no kids and no major commitments other than our jobs. House projects are DH's hobby and he can do just about everything, from framing to wiring to plumbing to flooring to drywall, etc...and if he has questions or runs into an issue he has a boatload of friends who have the knowledge to help us out. I trust him and I trust our friends to help us out and make the right decisions and so far I have not been disappointed.

    I'm good at picking out the details and thinking of things he hasn't thought of to make the prcoess go a bit smoother, but we're a good team. We had one minor spat so far about what to eat for dinner since going out to eat gets old really fast. But we got over it quick, came up with an agreement and moved on. I'm a good helper/assistant. I'm not the strongest woman on the planet but I can help with most things and I know what tools are what and I can usually anticipate what he needs so he doesn't often get too aggrevated with me. I don't compalin, I don't nag and I don't ask 1 million questions when he's in the middle of trying to contort his body to get that last nail in.
    We've done plenty of small projects over the course of the 3 years we've been in the house but this is definitely the biggest/most time intensive project yet. But I knew based on the other projects we could handle this and it would be so worth it.

    Even though the project isn't over I know we'd do it again ourselves as long as we had the time and the energy.

    Good luck!

  • 15 years ago
    last modified: 11 years ago

    No. I took on a mammoth project, estimating it would take about a year. It will have been two years in April, but should hopefully be finished before then. My architect estimated that if I had contracted my addition out, it would be in the $200-250k range. All told I think I will have spent less than $50k. I will have ended up getting pretty much exactly what I wanted, but had to forfeit so much to get it. I can only estimate, but I'm sure I've got well over 2000 hours invested in the addition. The only things I contracted out were the masonry and the TPO roof membrane. Things I diy'ed:

    -Dug and poured footers
    -Slab
    -Framing
    -Structural steel fabrication
    -Windows and doors (steel, from scratch)
    -Plumbing
    -New electrical, plus whole house upgrade to 400A service
    -Gas lines
    -New first floor HVAC
    -Drywall
    -Lighting fabrication

    For me, DIY is a simple equation. For example, I wanted steel frame windows and doors. Had I gotten Hope's, it would have been over $50k _without_ the glass. I made them myself for about $3k in steel, and $2k in tools. It just took about 200+ hours of work. Now I've got one of a kind windows and doors, and have become a pretty good welder.

    These are not tradeoffs I ever want to have to make again. However, when I'm finished, I'll either have a house that I can die in, or one that's worth enough that if I were to ever move, I'll be able to actually pay other people to do what I want.

  • 15 years ago
    last modified: 11 years ago

    Great thread! Fun to read posts from others who are in a similar situation.

    We are retired and live in a 1927 tudor revival house. We had come very close to the "white kitchen" -- even put a deposit on cabinets. But then finances and guilt about tearing out the original gumwood prevailed upon us to rethink the plan. That was summer of 2009.

    We started our DIY last May-- DH started making the insides of the new cabs in the garage. Did the tearout in June. Conserved all the old gumwood and we are re-using it and adding to it. New layout but the intent of the kitchen will be to look as though it was never redone, as much as possible.

    We have several more months of work. My DH works on the kitchen nearly every day, but not all day. There are too many other things that need to be done (like going to the gym and walking the dogs). If we did not keep some kind of balance we would burn out and go crazy - and make mistakes.

    One of the things that has made this very long process bearable is having a working kitchen in the basement laundry room. My DH hooked up the gas cooktop down there and we have a Breville convection oven and two dorm-size refrigerators. I like to cook and eat at home and having this kitchen has been essential during the remodel. We have even been able to have people to dinner, by using a Big Green Egg to cook our salmon.

    My DH is doing everything but the tile work himself : demolition, electrical, plumbing, taking out an old door and making an arch, making all the cabinets and the island work table. He wants to do things himself and he felt strongly about preserving the original gumwood.

    We like doing projects together -- my DH has build several things that I designed and drew and it has always been a source of satisfaction to plan these projects and see them realized. The kitchen is by far the most ambitious undertaking. We feel good about keeping the gumwood, so it has been worthwhile, though actually more challenging than it would have been if we had been using new wood. The objective of keeping the original wood has virtually necessitated that we DIY -- I'm not sure it would have been the right way to go for us if we did not have this particular objective.

  • 15 years ago
    last modified: 11 years ago

    Thanks so much for taking the time to respond to my question. I enjoyed reading all the pros and cons and feel like I have learned how to approach this project better. I was amazed at some of the jobs that you took on as a DIY. Very Impressive! I'm very excited about getting started on this project but it is also scary. Glad to know that others not only survived but excelled. Thanks again!

  • 15 years ago
    last modified: 11 years ago

    Me: Yeah, it would be fun!
    He: *stink-eye*

    We DIYed everything, but the granite, had custom door and drawer fronts made, and the routered edge and sinkhole cut in our butcherblock. We paid others to do those things.

    We removed a wall, replaced our windows and doors, added a peninsula with prep sink, and switched from an electric range with NO venting whatsoever, to a gas cooktop with hood and separate wall oven.

    We went with IKEA cabinets and custom doors. I did the assembling of all the cabs and drawers and Blum hardware, and DH installed them. We named ourselves "committees". I am the Design, Planning, Assembly, and Painting Committee, and He is Production, Engineering, Planning, and Finance. We make a good team and haven't killed each other. Yet. ;^)

    I should tell you that the original demo of the kitchen occurred in 2007; however I was never without a working kitchen. While we demo'd the kitchen part, Hubs moved parts of the kitchen into the dining room. I even had a working dishwasher the entire reno.

    We are not quite done. This week it is floors. Sometime in the next few weeks, I hope to have toe kicks. This is a big hope, as Christmas and my parents coming in will take us off course--though I wouldn't trade their visit for toe kicks! (Well, ask me again after they have been here a few days-LOL-kidding)

    The Hubster can do (and does) just about anything and with a perfectionist bend. He insists that if you are going to do something, do it once, and do it well. I love that! I never have to worry about him cutting corners or shoddy workmanship. He is very precise. He is an HVAC technician and electrician by trade and also does plumbing--which has saved us untold thousands of dollars. What is most amazing about working with him, is if I tell him what I want, and do the research on how to accomplish it, he will do it for me. I have the vision; he makes it happen.


    And I must say, he looks really cute when he's working, which is really a bonus--for me!;^)

  • 15 years ago
    last modified: 11 years ago

    Good thread indeed! My DP and I would definitely do the DIY thing again. We demoed the kitchen the first weekend in October and only have about 5% more to go. Just a few trim pieces are all that's left. We don't particularly work well together, but we knew that going into this project, so I would delegate specific things to him and give him a deadline. It worked well. We did the following:

    -Gutted old kitchen (kept similar layout)
    -Took the backsplash area down to the studs and put up cement board
    -Removed ceramic floor & installed polished porcelain tiles
    -Installed Ikea cabinets
    -Installed all the new appliances
    -Paint & trim, of course
    -Hooked up all the new plumbing and switched out electrical outlets.
    -Tiled the new backsplash

    Basically, we left the granite/sink install to the professionals and did the rest ourselves. We came in under $10k, and have a shiny, new kitchen that is exactly what we want. So, yeah, I do it again. Good luck! It sure is a trip!

    Here is a link that might be useful: My kitchn DIY blog

  • 15 years ago
    last modified: 11 years ago

    We are 10 rooms in to a 13 room renovation of a 1912 colonial. It was previously remodeled in the 1970's and all the plaster was gone/destroyed, so we have basically stripped every wall to the studs and tried to restore it to the original look/function. Along the way, we had a baby girl, so the project has slowed incredibly.

    If we ever had to do this again, we would have to DIY it for the cost savings.

    However, something I plan to never do again is drywall. My wife and I did the first 7 rooms before we decided we hated it enough to get some quotes "just to see." Wow! Drywall is cheap! And fast! Once you factored in material costs and truck rental to pick it up, I was earning the equivalent of about $3/hr on my labor.

Sponsored
High Point Cabinets
Average rating: 5 out of 5 stars21 Reviews
Columbus' Experienced Custom Cabinet Builder | 4x Best of Houzz Winner