tccsp11

I need framing advice ASAP!

10 years ago

We are building in the winter - obviously not our first choice, but we are doing it. We had hoped to get the basement concrete floor poured before this cold weather came in, but due to delays in getting the plumbing done, we couldn't. Now we have all of our pea gravel down and are ready to pour, but the ground is freezing and we can't pass inspection with frozen ground. Plus, I don't really want to pour when it is this cold. Our builder is putting on the roof and only has 3 2x4s supporting the house (other than the steel beams/posts). The basement stairs and framing down the center of the house need to go in but can't until the basement is poured according to the builder. I don't know what to do - I don't want the floor sagging. The builder says we could frame it in and then pour around it, but that the wood would rot in the concrete. Does anyone have any advice or experience? I want some other opinions please!

Comments (38)

  • 10 years ago

    Could you provide a picture?

  • 10 years ago

    It's true you shouldn't pour concrete when it's freezing, but it's also true you have to support the house while building it. It might be possible for the builder to use temporary supports in the basement. If I had to do that, I'd look into using house jacks, or a beam support system, or something along those lines, as used by the guys who do foundation repair. I would also make sure the code officer was cool with any solution.

    Here are some pictures that will give you a general idea:

    https://www.google.com/search?q=house+jacks+foundation+repair&source=lnms&tbm=isch&sa=X&ved=0ahUKEwiD0u2dvrbKAhVIyT4KHccTBXIQ_AUICigE&biw=1280&bih=614

  • 10 years ago

    These are the supports we currently have - steel beam and posts down the center of the house (single story). We do not have the stairs in. It is a walkout basement with 3 walls poured concrete.

    Now my husband assures me that it is structurally fine to wait to pour the basement, but I am worried


  • 10 years ago

    O.k., so the steel beam and concrete footings are already in place? If that's so, why doesn't the builder just go ahead and put in metal lally columns?

  • 10 years ago

    That's my question, too. With the footings in, the columns can go on, the beam can go in, and framing can continue. Around here, it's simply not at all uncommon to do most of the house before pouring the floor.

  • 10 years ago

    The steel posts are also in. Should that be enough support?

  • 10 years ago

    If your footers and steel posts are in, you're fine. But if you're that worried, maybe ask your builder for some sort of guarantee that when framing the basement starts, you won't be on the hook for any costs associated with sagging floors. Like mentioned above, you could request temporary support in place of framing until you're able to pour/frame.

  • 10 years ago

    If the footings, steel beam, and "steel posts" (lally columns?) are all installed, and if that's the system as designed, then you should be good to go. The floor pour will not give you a lot of extra support, that's the job of the footings. But the comment about wooden 2 x 4 supports is confusing. Your spans are not huge, so I'm not sure why anything extra would be necessary. Can you post a picture?

  • 10 years ago

    I don't think I've ever seen the basement floor poured before the house is fully framed and closed in. What's the problem?

  • 10 years ago

    and only has 3 2x4s supporting the house

    What exactly is that supporting? Are you sure they're doing anything?

    Sounds like the steel support posts are in, so I don't think you need to worry about it. What has given you the impression that it needs more support? The wall down the center of your basement (around the posts) will just be cosmetic. The posts are the things that are supporting the beam.

  • 10 years ago

    I don't have a picture of it unfortunately, as I am not at the house. Is there any way to put in a stairway if we wait to pour the basement? Any subcontractors have to walk around the house to change levels. Also, is it normal to pour the basement after all of the walkout windows are installed? Thanks!

  • 10 years ago
    last modified: 10 years ago

    You don't need a stairway, a ladder in the stairway opening will be fine, that's the usual thing. The basement floor pour after the windows are installed is also fine. There will be a lot of moisture in the pour, but that's perfectly normal.

    I would not leave the pour until the very end of the job, because you want the house to be reasonably dry for painting and laying hardwood floors. But pouring the basement floor isn't that mission critical overall, just do it before the HVAC and plumbing guys are scheduled, so they can set the furnace, water heater, etc. Heck, here in New England, many older homes have dirt basements. :)

    I just took another look at your plan, and I see it shows truss joists over the larger span. Maybe that's what is bothering you? If so, know that these trusses are engineered for this type of application. As long as the engineer's design is correct, and the trusses are installed correctly, you're fine.

  • 10 years ago

    Any subcontractors have to walk around the house to change levels.

    Not to sound cruel, but why is this your concern? Has a subcontractor complained to you? If so, that's very unprofessional. Subcontractors should talk to the builder if they have a problem.

    If your builder isn't concerned, you shouldn't be. Let him do his job.


  • 10 years ago

    If your builder isn't concerned, you shouldn't be. Let him do his job


    I was with you up until this statement. I agree that you should let the builder do his job, but as the person paying for the build and living in the house long past it's warranty date, it's hard to not be concerned about issues that MAY come up. If I hadn't worried about things and been on site every single day, there are a few things that would have been missed or done differently than I've wanted. Further, our builder certainly didn't mind the reminders or questions. I suspect the OP simply came here for peace of mind.

  • 10 years ago

    I meant on this issue. I'm not saying to totally step back and close your eyes to everything. I'm just saying that this 'problem' doesn't seem like a problem at all and the OP should stop worrying about it. There are enough other things to worry about. :)

  • PRO
    10 years ago

    If the holes to outside can be plugged, the basement can be heated and concrete poured; where there's a will and all that.

    Casey

  • 10 years ago

    JDS - it was around 13 degrees here today. The ground in the basement is covered in pea gravel (no vapor barrier yet). It is definitely freezing and won't pass inspection if it is frozen.

  • PRO
    10 years ago

    One option would be to trust your builder.

  • 10 years ago

    I trust our builder. Our builder is the one that is asking us to hurry up and get the basement poured. It sounds like he might not be correct...

  • 10 years ago

    Unfortunately, I don't have a photo. I am about 3 hours from the build site. I could bother the builder for one, but god knows how long that would take. We cannot pour the basement with the ground frozen because it will not pass inspection (needs an inspection before the basement is poured). The whole house is completely framed and the roof is going on. House has all steel supports. Not sure of the reason for the 2x4's. We have plastic sheeting on all of the walkout basements walls and doors, but the pea gravel and ground is still freezing. We have 3 heaters in the basement, but cannot run them 24 hours a day due to safety and them being stolen. They are only run when builders are at the house.

  • 10 years ago

    Our builder is the one that is asking us to hurry up and get the basement poured

    Well that totally changes my view of this situation! I had no idea that he wanted to do it. Everything you said previous to that statement sounded like you wanted it poured for some reason and he was saying to hold off.

    So what is his recommendation on how to do this? If it can't be poured until the ground thaws, but he wants to pour it, then how does he propose to thaw the ground?

    Is he asking you how to accomplish this?!? This seems like his problem, not yours.

    This situation is as clear as mud. :)

  • 10 years ago

    Sorry, I should have clarified that the concrete contractor is a family friend so we arranged his work. The concrete sub prefers not to pour when it is this cold and, if we do pour, wants the heaters running 24/7 for at least a week. That is why the builder is putting it on us.

  • 10 years ago

    This is why most builders don't allow the owners to sub out their own work to family/friends. I think you may have screwed yourself here.

  • 10 years ago

    We have 3 heaters in the basement, but cannot run them 24 hours a day due to safety and them being stolen.

    if we do pour, wants the heaters running 24/7 for at least a week

    Given these two statements, I guess the only solution if it NEEDS to be poured, would be to hire someone to hang out in the house during the off-times so that the heaters can remain running.

  • 10 years ago

    I'm completely confused. ;)

  • PRO
    10 years ago

    You should have hurried up and poured the floor. Pouring concrete in cold weather is more complex due to chemical additives and heating needs, and risky of the concrete not curing properly.

  • 10 years ago

    We were not able to pour the floor before the cold because the plumber was not able to rough it in. Could've, would've, should've but unfortunate stuff happens and things get delayed.

  • 10 years ago

    Personally, I wouldn't risk it. I'd get some temporary jacks and finish the roof. Unfortunately, that may mean a standstill with other progress until the weather relents, but it's better than crazing! If waiting simply isn't an option, there are ways to pour in winter (curing blanket, chemical additives, additional cement mix, etc) , but I'd seek out an experienced sub, who guarantees his work, who has done it before.

  • 10 years ago

    According to my builder there are no load bearing walls on the basement slab. All of the loads are being supported by steal beams and lallys placed in the footing. It is a custom build and not a large housing development. After the footings were poured, they were covered in straw as the weather was getting cold. I will see if we can find any insulation blankets. Apparently there was miscommunication and the concern was over not having a stairway for subs and that the concrete should cure 60-90 days before installing flooring over it (basement is being finished before occupancy, as we need the extra space).

  • 10 years ago
    last modified: 10 years ago

    Hmmm, I do see what you are talking about now. It definitely looks like there are load bearing walls on the footings. Back to talk to the builder...smh...

    Our builder never said anything about his being a "bad" thing, but you say it is?

  • 10 years ago

    Apparently he didn't. I just re-read an email and it says "The basement stair hole is supported by load bearing walls which are not in and I have it supported temporarily for now." So, I guess this is a time when we should not have trusted our builder... :(

  • 10 years ago

    The OP is changing things on the fly, and is really the one causing the issues and delays here. They are technically acting as the GC and just directing the ''builder'' without the necessary knowledge to integrate all of the moving parts. There is no ''independent oversight'' at all here, and here is no background knowledge informing the on the fly changes that are impacting the design and construction.

  • 10 years ago

    Sophie Wheeler - Wow, it seems like you know everything about my situation. Please, tell me more...

  • 10 years ago

    I really don't think changing the location of the kitchen and dining room (which required NO wall changes or anything) really affected this situation. But, you have to pass judgement where you can don't you, Sophie Wheeler. Do you even work? I see you listed as a "Pro" but all that can be found on you is a couple of pictures of cabinet doors and picture of a hideous kitchen.

  • 10 years ago

    Dreamhouse26, don't let it get to you. I had the same reaction to the same know it all in regards to my first post here as well. Now that we're half way thru our build, I can say that it turns out they didn't actually know it all, especially considering they gave their opinions as if they were fact. I will say your description of this situation has been a bit confusing, but I've been guilty of that here too, so I sympathize with you and how you're probably feeling about the seemingly harsh responses here.. Try to step back and reevaluate your situation with the basement floor once you know all the facts. Get a list of all options and sit down with your builder to discuss how you move forward. Good luck!

  • 10 years ago

    Thank you htwo82. I understand that my question was confusing, but sometimes you don't get the same story from everyone on-site. No change in plans were discussed regarding the load bearing walls on the stairs and I wasn't given the right answer the first time I asked (and reported to you). I am not well versed in building (my husband handles that part of things), so sometimes I am not as clear as I want to be. However, I should not be treated like an idiot or a fool for it. I come to this forum to get advice and other opinions, not to be judged and ridiculed. There are a few "pros" on this board that don't seem to be working a lot (since they are constantly posting) and I have suspicions as to why. However, there are also some amazing, generous professionals (and I use the word "professionals" purposefully) that give great advice without judgement and ridicule.

  • 10 years ago

    As stated before, it was not my intention to pose things as a "riddle." I didn't realize that "experienced design professionals" also meant perfect human beings.