This is a *very* preliminary question:

I'm planning on purchasing a three bedroom/two bath apartment in NYC and taking down the walls of the third bedroom to convert it to a two bedroom/2 bath--the third bedroom is adjacent to the living room which would open it up to a loft-like space. It appears (from the floorplan) that the walls of the third bedroom aren't load-bearing and I'm fine keeping columns up if they're load-bearing.

I realize I need an architect for that. But do I need an architect for the rest of the renovation which doesn't involve any other gut remodeling--just putting in an Ikea kitchen, new flooring throughout, painting, some electrical re-wiring (to hang a chandelier in the dining area and a few overhead lights in the kitchen and living room), re-tiling both bathrooms and adding new fixtures and putting wood panelling in the 2nd bedroom to use as a den.

I'm hoping to just use the architect to convert it to a 2 bedroom, then use a general contractor for the rest. I already know how I'd like my kitchen done and which tiles/fixtures/wood I'd like.


I'm a first time renovator (I'm sure you more experienced ones can tell!) and any and all advice is appreciated.

Thanks.

Comments (13)

  • 10 years ago

    Thanks. Question: Why might the building require me to update all the plumbing if I open up the walls? (I understand wiring.)

  • 10 years ago

    Old galvanized plumbing leaks eventually. Even copper plumbing can develop pinhole leaks. Cast iron drains rust. Nothing is forever.

    Opening up walls is the time to replace anything inside those walls, including insulation. It all needs to be brought up to modern standards even if the local AHJ doesn't actually require it. Nothing worse than to have an issue behind your walls when you just finished putting cabinets in place. Then you have to rip everything apart to get to it.

  • 10 years ago

    Thanks. So even if the plumbing isn't near the wall I'm opening up it still might need to be replaced? The building I'm planning on buying in was built in the mid-1960's.

  • 10 years ago
    last modified: 10 years ago

    No, they won't require you to update non-adjacent plumbing. But in the kitchen they likely will.

    writergirl5000 thanked freeoscar
  • 10 years ago

    Thanks.

  • PRO
    10 years ago

    I used to get heart palpitations when I watched television in the evening. My doctor told me to give up caffeine. I did and they eventually went away.


    I did not go to a cardiologist first. Too often, this is what remodelers mistakenly do. They go to a "cardiologist"/architect, when they should start with a general contractor. If the GC thinks you need an architect or engineer, he'll recommend one.

    writergirl5000 thanked Joseph Corlett, LLC
  • 10 years ago

    Great suggestion. Thanks!


  • 10 years ago

    Talk to a real rstate agent on the front end before ever purchasing a home. Taking a 3 bedroom to a 2 bedroom would not be adding value to the home. It will also be SIGNIFICANTLY more than expensive to do a project of this nature than either realtors or TV shows indicate.

  • 10 years ago

    Thanks.


  • 10 years ago

    Can you post or link the floor plan? Are you sure you want to completely remove the 3rd bedroom? Maybe just make it a smaller 3rd bedroom so you don't lose value.

    We just went through the city approval process to remodel our NYC apartment. The process with the Board took longer than anticipated. We had to complete an alteration agreement and pay for the building engineer to review and approve architectural plans. We found our GC first and as the scope changed, we hired an architect since we removed multiple walls and added new plumbing to expand the bathroom.

    The architectural plans will have to include all rooms, even if you are not making changes to those rooms. The DOB doesn't care about your fixtures or finishes but the Board approval will likely require your fixtures to be listed (appliances, faucets).

  • 10 years ago
    last modified: 10 years ago

    If you are reconfiguring spaces in an apartment in a multi-family building, state law will require an architect or engineer's s stamp so you might as well go directly to an architect and find out what is required. There is no parallel between voluntary medical treatment and mandatory building design.

    As for separate drawing sets, the building department is not likely to issue two permits for the same project unless you finish one before applying for the other or you ask to amend the original permit after work starts. If the other work doesn't need much documentation, you might as well have the architect include it on the original drawings. The building board or management is likely to require one proposal and an architect's stamp as well.

    I've been through the plan review and permitting process in Manhattan and it's not something you want to repeat unless absolutely necessary.

  • 10 years ago

    Thanks all. I'm not concerned about the resale value--planning on staying many, many years--so not interested in keeping the 3rd bedroom at all. When the time comes, I'll start with the Board, find out what's necessary, go with GC and architect. Thanks for all the suggestions.