Help! Need ideas on how to fix!

10 years ago
My contractor gutted my bathroom to the studs and didn't check to see that the wall that the vanity is on was square before installing.

The center back of the vanity is flush to the wall. There is a 1/2" gap between the wall and one corner and 1/3" between the other. There is a wave in the wall.

The contractor glued the marble top to the sink and vanity, the backsplash to the top and to the wall where it touches.

He is suggesting putting a ton of drywall mud on the low area and feathering it out. Do you have any other solutions? I am afraid that much mud would crack.

Comments (22)

  • PRO
    10 years ago
    Wow, that's really out. It sounds like everything is set and plumbed so that makes it hard.
    The cheat would have been to cut the sheetrock where it contacts the vanity/top so it can push back farther(high spot). The cut sheetrock is hidden by the vanity top. This is fairly common in older existing houses.
  • 10 years ago
    Yeah. It was a guy to the studs so I would have expected him to shim or plane things to get to a good surface but he apparently didn't check to see if it was square before installing the vanity. Then he glued it anyway. Should I insist he pull it out and redo? And if the marble breaks he replaces it?
  • 10 years ago
    Gut to the studs...
  • PRO
    10 years ago
    No I don't think you need to pull the studs, that's to big of a job. I do think it's fair to ask him to come back and improve on it though.
  • 10 years ago
    He gutted the bathroom to the studs then rebuilt a bowed wall.

    Once the top is glued on what can be done? He suggested applying 1/4" of drywall mud and then caulking the rest of the gap. I am nervous about that. Should I be?

    Alice
  • PRO
    10 years ago

    If the studs stayed which would be a gut to the studs the wall was bowed before so IMO whatever was there before had been manipulated to work but he just assumed the wall was square maybe see what he can do to make it better than it is but ask nicely

  • 10 years ago
    All he says he will do is pile on the mud. He has left a lot of stuff poorly done so I am wondering what *can* be done. That will help me know what to ask for and, if he won't do it, if I should move on to another contractor to fix this and finish the job.
  • 10 years ago

    Of course move on, if he won't do it. Follow Sophie's advice...Good Luck.

  • 10 years ago
    I would say cut your losses with this contractor and withhold a portion of final payment if your contract allows. Don't let someone who obviously does not do good work mess with your bath any more. Sophie had great advice. Good luck!
  • 10 years ago

    This is really not a hard fix. I would deduct the cost of correcting this from his payment. Sophie's advice is spot on.

  • 10 years ago

    If the wall has that much of a bow, wouldn't the "reveal" on the top of backsplash look uneven? 1/4" in the middle and 1/2" on the ends? It does need a fix though, can't leave it like that.

  • 10 years ago
    He doesn't want to do it and he doesn't want to allow me enough of a holdback to deal with a broken piece of marble if something bad happens when we fix it. (He put glue all over the place)

    Basically the top is $1265 and I am asking for $2500 holdback to hire a contractor to deal with all of the finish issues he doesn't want to address (yes there is more) and the $1200 he says he is paying the tile guy to fix some work.

    He is pushing to simply replace the trap and get the city in for final inspection. I am refusing to allow final inspection until both the aesthetics and safety elements are in place. We seem to be at an empasse

    Any thoughts?
  • 10 years ago
    Amazingly the guy refused to fix this. Don't use SKI Construction if you live in the Bay Area.
  • 10 years ago

    Why is the toilet tank so far from the wall?

  • 10 years ago

    What about the gap under the counter top between the wall? Why is the back of the top sticking out past the vanity?

  • 10 years ago
    Vanity- Because the guy doesn't produce quality work for some reason. Have no idea why.
  • 10 years ago
    He did finally agree to enough of a holdback and not to bill me before the last piece of work is complete.

    He did also use a stain different than the one I selected on some floor patches. Turns out he mislabeled his swatches. Luckily it turns out my painter did floors for 10 years, sanded it down, took a rag and three colors of stain and got an almost perfect match to 65 year old floors with original finish. Amazing to see an artist at work.

    Pic is of SKI's work.


    Alice
  • 10 years ago
    And the photo...
  • 10 years ago

    Well at least you have a great painter!

  • 10 years ago

    We had same problem. It is not studs, they put drywall and it is bowl. Luckily we did mosaic back splash, so you can't see it. Maybe you can fix it that way too.

  • 10 years ago
    Nice idea. I already bought a marble backsplash though. I have a contractor who thinks they can hide it.

    Btw, I did check and the top is flush with the back of the vanity. Looks like it isn't because of the angle.
Sponsored
Buckeye Basements, Inc.
Average rating: 5 out of 5 stars40 Reviews
Central Ohio's Basement Finishing ExpertsBest Of Houzz '13-'21