Software
Houzz Logo Print
cbalint

Need help with my Family Room

9 years ago

We are remodeling our lower level (walk out basement) and getting a brand new mono stringer(metal) staircase. At the same time we would like to install a new floating floor(engineered wood, 0.5" thick). The old floor is concrete. Which should be installed first, the metal stringer or the floating floor ?


Comments (3)

Sponsored
Kuhns Contracting, Inc.
Average rating: 5 out of 5 stars26 Reviews
Central Ohio's Trusted Home Remodeler Specializing in Kitchens & Baths