Is This a Normal Clause in Contract?

10 years ago

Hi - Ugh, I thought I had done enough homework and due diligence that I would not be another "bad situation with a contractor" story. Hopefully, I can still come to a resolution - waiting on contractor response due tomorrow.

Is the following a normal clause in a kitchen remodel contract? If so, what kinds of situations lead to invoking the clause? My issues are things like some pulls not installed level, base cabinets installed about 1/2" too low, extra 3/4" gap in dishwasher opening, some sloppy trim work, relatively minor damage to new cabinets, etc. These mistakes are piling up and as we are now in Week 8 of a four week contract period, I've called off work until owner reviews the situation.

"Should Contractor default in any of its obligations under this contract, then the Owner shall give written notice thereof and Contractor shall have seven days after receipt of such written notice to cure any such default and/or deficiency. Should Contractor not cure such default or provide written documentation as to why such default cannot be cured within said time, the cost thereof may be deducted from any payment then due or later due or, at Owner's option, Owner may terminate the contract and take possession of the premises and may complete the work by whatever means or method Owner may deem appropriate and if the unpaid balance of the contract sum exceeds the expense of finishing the work, such excess shall be paid to the Contractor within 15 days of completion of such work but if such expense exceeds such unpaid balance for the same work outlined, the Contractor shall pay the difference to the Owner within 15 days of receipt of notice to Contractor. In the event expense exceeds unpaid balance, Owner shall provide complete supporting documentation to Contractor and Owner shall allow ample time for Contractor to review expenses and determine, by whatever means necessary, the legitimacy and accurateness of the cost being billed to Contractor."

The question I don't want to face is, "Do I have problems such that the remedy is to rip it all out and start over?"

Comments (7)

  • PRO
    10 years ago

    m_gabriel:


    Make your contractor an offer. Here's x amount of money to just go away or call it even, whatever you think puts you ahead. He may be just as willing to get rid of you as you are to be rid of him and willing to take a small beating to make it so. It can't hurt to ask.


    There are many ways to fix the problems you mentioned. If you're not too fussy, they can probably be fixed inexpensively.

    m_gabriel thanked Joseph Corlett, LLC
  • 10 years ago

    You need to understand how the mechanics lien laws work in your state.

    m_gabriel thanked practigal
  • 10 years ago

    It is more than that you may want lien releases on all progress payments from all of the subs too. You really need to know how it works in your state.

    m_gabriel thanked practigal
  • 10 years ago

    Am I reading that clause correctly to say that I can give written notice of 7 days to finish/fix everything or else hire someone else to do it and use the remaining payment to pay for it? Seems like a good provision to have in a contract. Kitchen is very close to done, work was well-intentioned, I think, but sloppy in parts and owner/contractor did not have enough on-site involvement to adequately supervise. I don't think there is any disagreement that mistakes were made. We have bigger fish to fry now with structural issues, unfortunately.

  • 10 years ago

    Once you have given him notice, he has 7 days to fix it. If he doesn't, you can deduct whatever it costs from the remaining payment to get it fixed. Or you can cancel the contract. However, if the repair costs less than what you still owe the contractor, you still have to pay him the difference.

    (And if the repairs are more than what you've paid him so far, he has to pay you --- not sure how to enforce that, though).


    How much do you think will it cost to fix the stuff?

    m_gabriel thanked nosoccermom
  • 10 years ago

    Nosoccermom - that's the way I read it, too. I made a mental note about it before I signed the contract and hoped I would not need to use it. I owe them about $1,000. That's more than enough to recut some trim pieces, caulk the sink, 2nd coat of paint, finish a few door pulls, recut toekick and replace doors where pulls were installed crooked, etc. We have to hire a new contractor anyway for extensive structural work so I imagine they would be "happy" to do these things as part of the bigger $$ project or else it's mostly at a handyman level at this point. That's IF, as Joseph Corlett points out, we decide to not be fussy and move on without having the whole thing ripped out and counter heights fixed to standard (they will end up 35.5" or a little lower depending on whether the subfloor is replaced as part of structural repairs) and live with water damage at the bottom of a pantry cabinet that will be covered by a drawer and live with 3/4" filler for mis-measured dishwasher opening and the resultant loss of that depth in our counter overhang. If we had all that done, cost would be around $5,000 if fabricator is right that countertop will likely break if removed along peninsula area. Of course, if refrigerator does not fit due to mismeasuring (it's going to be tight!), that whole side is going to have to be redone regardless. There was too much rushing and too little project manager/owner involvement - I guess they assumed it was going to be straightforward due to the detailed plans but then you'd have to actually follow the plans...It's just a miss all the way around.