Software
Houzz Logo Print
hzdeleted_19779803

Tuesday Eve

9 years ago

Doing the dirty job this week and next.I forgot to take a picture of the before. This is the second phase of the redecorate. This is below a window. That was replaced a couple of years ago. This is solid so maybe leave it or Bondo. Rubber back/foam back carpet. Everywhere. This room is much worse than the 1st room. I'll scrape some off but since it's going to be covered with plywood I won't go nuts on it.

And then we have the stairs. Sigh. But they weren't as bad as I expected. Just as much residue left but they had tile that peeled right off. I'm sure it was probably the asbestos stuff but since it lifted right up and was pliable I didn't worry about it. And the wind tunnel through the house that day probably sent everything outside. I'm planning 2 days to take out staples. I'm going to face these with 1/4 plywood. My house was built in 1880. It has survived lots of updates. Rubber back carpet was the last one. It was here when I moved in and no doubt was old then. It still looked pretty good but so hard to clean I decided to get rid of it. I'll scrape off the thin backing that's stuck to the risers. The yellow foam is gone along with the tile it was stuck to.

Getting started.

Comment (1)

Sponsored