Punch list or pre-punch list work?

9 years ago

My GC really bungled a bathroom tile job via a sub-par contractor who chipped and cracked tiles in the bathroom. Would fixing and/or replacing these tiles count as punch list work -- or should this be done before the punch list? It's about 10-15 tiles at least. They really show up because they're light tiles and darker grout.

Also, there was a leak from bathroom plumbing work then dripped down into a bedroom, so we had to remove and replace part of the old tin ceiling there...they replaced with new tin, but now it looks like an obvious patch job even with same color paint on it to match rest of ceiling. Should we expect them to address this somehow? (we're already overlooking the discolored original parquet wood flooring from water stains from their tile saws for which they didn't properly protect flooring.) thx