angelo_guevara

Wooded land lot

8 years ago

I expect to purchase a 5-acre wooded lot in the near future. As such, I would like to get advice as to land clearing, well water, building structures, etc. I live in orlando, florida. The lot is rectangular and faces north.


(1) Land Clearing: The lot is wooded which means I need to clear some of it. As of now, I am thinking 1-2 acres needing to be cleared. There are some large trees, but most of them are not that big ... there are some palm and pine trees. It is dry. Any recommendations as to the land clearing companies?

(2)Water: There is no city water thus need to put a well; I am in Florida and am told that should not be that big of an issue nor costly. I have been researching solar wells water pumps. Any recommendations?

(3) Electrical: there is electrical on the road; I will need to have the electrical company bring power to the location where I'll be building. Anything I should be on the lookout for?

(4) Entrance: there is a water ditch that runs across the front of the property. A friend had the same situation on his 3 acres lot; he placed a "pipe" across the spot where he wanted to come into the property and then poured rocks on the top of it to keep in place and then some soil (patted down). Is that a sound plan?

(5) Building an initial structure: I am not planning to build a house there for now, but would like to build something that I can spend the day (like a picnic pavilion) .... perhaps have a garden and move my beehive there eventually. I was thinking of building a storage unit to keep my tools in, but have been told that perhaps I can purchase a pre-fabricated unit.

(5) Fence: fencing the 5 acres will take significant time and money. My friend tells me to just get a survey done so they can identify the 4 corners of the lot; he advises against fencing it in as it would cost quite a bit.

(6) Site plan: my friend recommended having a site plan so I would know where and what to clear, build, etc. He built the plan himself, but am wondering how expensive that would be if I have someone do it. I am an engineer and very experienced with software tools so just trying to compare.


I could go on for a while longer, but those items are on my immediate short list. I am thinking of doing solar as much as I can as I live in Florida and we get plenty of sun all year around.


Please chime in with anything else I may have left out.


Thanks in advance!

AG

Comments (9)

  • 8 years ago

    What are your short term and long term goals? Do you have budgets in mind already?

    Angelo Guevara thanked apple_pie_order
  • 8 years ago
    last modified: 8 years ago

    Short term: clear some of the land to put a "pavilion" where I can spend the day & a Storage unit in which to place my tools (table saw, tractor, etc.). Ideally, The storage unit could have a bit of space where we can spend the night (2-4 people). My friend has advised me to build a "garage" which would serve as storage and "sleeping quarters".

    Long term: Build a 3-4 room country house with a garage. I love log homes, but that's a no-no, in my opinion, in my neck of the woods. If I build a garage initially, the house would be an "add-on" next to it.

    Budget: I don't have a number in mind, but oof the cuff I would not want to spend more than $20,000 initially on clearing, preparing entry way, well water, etc. Not sure if that's a realistic number, but am planning on getting bids on everything and thus have a better idea.

    Thanks.

  • 8 years ago
    last modified: 8 years ago

    It’s going to take s heck of a lot more than 4x your budget to get undeveloped land ready to build. It also requires permits and inspections. You can’t camp on residential land. And you would need proper zoning to have two habitable structures on the land. No habitable barn then house. House then barn.

    You are not really ready to think about this. Keep saving for a few years.

    Angelo Guevara thanked User
  • 8 years ago
    last modified: 8 years ago

    I presume you also need septic and power (unless you plan on running off a generator) Our recent rural build cost over $100,000 for the infrastructure (well, septic, power, drainage, clearing a portion, surveys, permits). That was in Canada, and I am sure there are huge differences depending on location.

    Angelo Guevara thanked Marigold
  • 8 years ago

    Thanks to everyone for your inputs thus far. Here are my thoughts to some of your comments. (1) It will take $1,000 or so to run the electric based on what it cost my friend; he's in a location close by. That will, of course, depend on how far in they need to run it in. (2) I will need septic; I neglected to put it on my previous list (3) The drainage would not be changed, as in direction or flow, it is just filling in the ditch at the entry way in order to drive into the property. (4) I will be looking into getting a well so I can have water.

  • 8 years ago

    I would suggest that the first thing you do is develop your site plan. There are building codes for how far away septic and well have to be from each other (usually 100 feet). I'm in SW Florida and the new well we just put in at our place of business cost $10,000 for a 30 foot well. Expect the septic to cost about the same. You'll also need electric run to the well to operate the well pump. The well water will not be potable so you'll need to consider what kind of filtration system you want. If I had well water in Florida, I wouldn't consider anything less than a whole house r/o (reverse osmosis) system. Your city will be able to tell you what you'll need for your culvert pipe. In New York, where I worked for a company that built new construction, site work was an average of $60-80K for driveway, well, septic, electric, clearing, etc. Consider burying the electric from the street. There may be electric on the road, but if there is not a pole close by, you may have to pay to have one put in. If you're going to set the structures back more than the electric company allowance, you're going to have to pay for a second pole on your property as well. The pole has to run to a meter, so you'll have to look into the cost of the meter and whether you're allowed to attach it to a separate post or if it has to be attached to a structure. Lots to consider!

    Angelo Guevara thanked katinparadise
  • 8 years ago
    last modified: 8 years ago

    Angelo, you can't "fill in the ditch at the entryway to the lot". You have to have a culvert as mentioned by oliviag55 upthread. There are very specific regulations to installing a culvert so that you don't block the drainage for your lot and the surrounding lots. Even rural areas here in Florida have lot development (and building) codes you have to follow as pointed out by katinparadise. Before you buy the lot, please do your homework with the city and/or county building and zoning so you aren't caught by surprise.

    $20k for lot prep including electric, well water and septic is not possible for the lot and area you describe.

    Angelo Guevara thanked Denita
  • 8 years ago
    last modified: 8 years ago

    This sounds like an enormous undertaking. We recently built a small house in a tall pine forest on a mountain. Fortunately, we worked with a general contractor who has been building there for many years. He knew all the inspectors, subcontractors, and permitting officials, and was able to quote prices for each component of our build. We were apprised of all costs well in advance and experienced no surprises. Hopefully, you can consult with someone in your area who is knowledgeable of the process, as well as the realistic budget for your vision, prior to even considering purchase. Good luck, and keep us posted.

    Angelo Guevara thanked flopsycat1