Hi everyone, we're getting our kitchen remodeled after a flooding and hoping you can help with some advice. I chose a contractor who has been in business for 10+yrs with not many reviews, but all positive. He gave us a quote to remodel the kitchen which seems reasonable, but now that it's time to sign the contract, his contract/proposal is still pretty vague as to what he's promising to do. For example, the contract he wants me to sign says something like "install white shaker cabinets in the kitchen." No brand mentioned, no linear footage, nothing about the measurements of the cabinets. We told his assistant who handles the e-mails/appointment communication that we needed the specifics before we signed anything, but she came back with very little additional detail (added "approx 530 sq ft kitchen" wording). While the contractor sent over a drawing with the initial proposal, we never received one with the finalized details discussed during our second appointment. Do I continue to work with this company until I get the specifics I've asked for or should I just move on? Thanks for any advice!
This is normal, nobody else gives specifics either
Continue asking for the specific information before you sign the contract
This guy sounds shady, just move on

Comments (11)

  • 8 years ago
    last modified: 8 years ago

    The problem is that you are expecting him to do the design and specifications for you. That’s NOT what contractors do. That is what Designers do.

    If you don’t have your own design and materials specifications to present to contractors, you will never ever be able to evaluate bids. The quotes will be all over the map, and unusable. Which is what you have now.

    You need to hire a Designer first.

  • 8 years ago
    last modified: 8 years ago

    My KD had a ton of specific drawings and measurements and lists. Like, a lot. Not just the cabinets, but all details down to how the electric receptacles would be installed. They were provided to my designer's contractor that he always uses. Kitchen was installed with no glitches. Backsplash though was removed from the scope of work cause I wanted to do that at a later date after the kitchen was installed. That was specified as well.

  • 8 years ago
    last modified: 8 years ago

    I agree with others.

    I am in the process of doing a gut remodel and my designer had all plans drawn up and sent to the GC for their bid.

    Some of the items like cabinets I am supplying - really I am supplying all materials relating to optional cost and design - i.e. cabinets, appliances, type of flooring, tiles, counter materials etc. and that is reflected in their bids.

    Other items like the shower glass are being supplied by the contractor but the specs for those were in the design plans provided by my designer and are incorporated in the contract.

    You need to do a significant amount of research in terms of what YOU want - I don't think contractors supply kitchen cabinets generally but do the installation of what the client has selected. Similarly with other items since there is a world of difference between the lowest cost formica and the counter material you might want. Similarly so with cabinets as you can have basic poor quality Shaker style white cabinets which offer minimal functionality or you can have custom or semi-custom Shake style white cabinets that provide the best use of your space and are of high quality.

  • 8 years ago
    last modified: 8 years ago

    What you have not mentioned is anything about a design or layout or plan for your remodel. There must be plans, drawings. Right? Where will the sink go? The fridge? Will cabinets go to the ceiling? Have you given the contractor the plan for these things?

    This contractor might be quite good, but if there is no plan, you've not given him anything to work with. Without a plan, you can't blame him for being vague.

    The red flag here is that your post was fairly lengthy and detailed, but said nothing about a kitchen design.

  • 8 years ago
    last modified: 8 years ago

    "You need to do a significant amount of research in terms of what YOU want"

    While I agree with that for my kitchen, there is also another approach that some people take which is to hire a KD and hand over the reins. There are some people who don't have the time to do that research, or simply don't want to. My mother hired a KD that a friend of hers used, and she liked her friend's kitchen. She told the KD she wanted white cabinets, granite countertops, and showed him all her dishes that she needed storage for. The budget was agreed to. That was all the input she gave. Didn't give any more input on anything else, and left him to it for pretty much everything. Her kitchen came out beautiful. But you have to know your KD is good before you go that route. Also, the KD used contractors he used for years, but those contractors worked solely with the KD and had no interaction with my mother. The OP of this post appears to be working with the contractor with no designer I think might be a problem.

  • 8 years ago

    Is his quote including installing cabinets or purchasing cabinets. If purchasing, he needs to specify what he's buying for your kitchen. If installing, then his measurements may be used in selecting sizes, etc and then installing them, but his bid would only include installation so you would need to add the purchase of the cabinets as a separate line item when comparing bids.

    We've had both scenarios with contractor bids before, and I'm generally more trusting of contracts that read "installation of cabinets to be supplied by homeowner", something very concrete. But I have also found that some contractors, at least in my area, aren't good at contracts nor anything in the professional paperwork arena. But they do good work. That said, a GC needs to be decent at a contract or you won't have any legal legs to stand on, especially since he doesn't have much of a record.

    I will tell you 4 other things I do.

    1. I look to see whether he's state licensed and the amount on his licensure.

    2. I confirm he has some kind of worker's comp insurance if there is a reasonable risk of injury with what the contractor is doing for me. When hiring outdoor painters, it was a requirement. With a trim guy, I was less concerned. You would think a saw would be more of a risk than heights, but I saw it as the trim guy used the saw every day while the painter's sense of balance could vary with a cold or allergies.

    3. I look up court records under his name for criminal or civil suits. I had one person that I never called for a bid because someone with his name (that wasn't common) had a history of assault, theft, and other crimes. But I've also been cautious with someone with small claims where he was having to seek payment from several homeowners. Why has more than one not paid him?

    4. I ask for references and call them. It's painful, and I don't like it. But each time I do it, I have at least one contractor who I was considering that has either all of their references extremely short-answered (not exactly raving about his skills) or one who had a significant flaw. For example, when we were looking to have the outside of our home painted, one of the references said that the painters seemed good enough, but she was uncomfortable that they tried to convince her to upgrade the paint she had chosen to another product. The original bid had specified the paint, but she felts that they were pushing for more money, especially since they were a lower bid originally.

  • 8 years ago

    I had a similar situation with one of my remodels where the contractor and I discussed the job verbally and he gave a lower quote. I was afraid that he would find place to add cost conveniently "forgetting" that we spoke about certain items so I ended up writing out all of the details myself. It was 2 pages long but I wanted to make sure we were on the same page. When I asked him to review and add it to our contract all of a sudden the price when up X 3. To make a long story short, yes I agree that there should be a plan, but once you know the plan and the work needed, do not fear having every single detail in writing. If they won't do it, add it in yourself.

  • 8 years ago

    M Miller - I didn't mean to imply that one should necessarily design their own kitchen - I am using a designer with my remodel but mine is a collaboration as I provided the inspiration photos in terms of style as well as having a lot of input into how I wanted the kitchen to function best for my needs and she laid out the plans and is helpful with carrying out my "vision" as well as knowing how things will work together and the all important Code. I never dreamed there was so much Code involved in terms of passing inspections LOL - My kitchen sink had to have a UPC or UL approved rating. My chandeliers which I took down only because my remodel required EVERYTHING to be vacant can't pass Code so I can't reinstall them until the apartment is officially mine again. I am thinking about aging in place so I wanted a few of the wall sockets raised a bit - even though I am having extensive electrical work done by a licensed electrician if I move a single socket, then I would be forced to do some very expensive additional electrical work.

  • 8 years ago
    Thanks for the replies! To clarify, the contractor and I discussed design details down to each cabinet size, where each goes, style, color, countertop granite, where appliances go, measurements, etc., at this point the only thing left is for all that to be put in writing and signed. Since the contractor supplied the initial proposal with drawings, I was thinking that it was only reasonable to expect that he'd update and re-send the drawings and the contract with the details we discussed. It just doesn't quite feel right to sign a contract without any specific information we spent several hours discussing.
  • 8 years ago

    If you have the specific plan with the exact specifications, then all you need to do is have the contract state that the plans are incorporated by reference and then attach them.

    My actual contract with my GC isn't the lengthiest but incorporates the detailed plans which were drawn up by my GC and also adds the important language regarding mechanics liens, insurance, progress payment. English isn't his first language but he had done work in my building and my designer vouched for him so I walked a thin line between making sure that I was protected for the important stuff while not alienating him by being overly lawyerly which, as a lawyer, I can be. Since I am not a construction lawyer but do have a lot of contract experience, I did rely on my experienced designer to advise as to what was customary in the business in terms of what some words of art meant.

    In my experience, a lot of GC's don't have lengthy contracts so it is up to the client/homeowner to supply the language and clauses that are necessary for basic contractual issues. Redraft the contract with language referencing exactly what the scope of the project is and exactly what materials are being supplied and all of the details. As Samuel Goldwyn famously said - an oral contract isn't worth the paper it's printed on :-)