Software
Houzz Logo Print
babypostal

Botched shower floor

8 years ago

My contractor messed up my shower floor. I pointed out the mistakes to him, and he agreed. He marked all the bad spots, truthfully the more I look the more I find and now I think the whole floor needs to come up and be replaced.


What concerns me now as you can see (picture 1) six tiles that he pulled and redid they don't look any better, now you're losing the spacing between the tiles and the tiles themself look crooked.


He did a great job on the other floor, I'm just worried he is not capable of fixing the shower floor. I have concerns moving forward. Do I give him the chance to correct what he did or do I stop the job and replace him? If I replace him what do I pay him for the two weeks of work he's already done? That's the other thing, he said 2 weeks, we are starting week 3 and he is not even 1/2 way done.


As I started to clean the floors (he didn't clean up after job) I did notice a few tiles that are sticking up more, no grout yet so this should be an easy fix right? Also the quick set that is between the tiles, how will he clean that? I would imagine you can't just throw grout over that...?








Comments (17)

  • 8 years ago

    That shower floor - rip it all out. Looks like TWI - tiling while intoxicated.

  • 8 years ago

    When you hire the next person, ask a bunch of questions about waterproofing. There are systems of waterproofing products, and codes, etc. That is really more important, ultimately, than the appearance.... but when a contractor can't tile a simple shower floor, it probably means there is lack of waterproofing.

  • 8 years ago

  • 8 years ago

    That's the only before picture I have where you can kinda see the concrete that he put down, I'm assuming this is not level and the beginning of the disaster... how would I know if this is waterproof?

  • 8 years ago

    Well, I can assure you that THAT is not waterproof!!! Wow. I would look in the Bathroom Forum on this website for threads that include the words "disaster" and/or "waterproof?" or kerdi (which is a waterproof system). I would read as many as I could until I gained an understanding. Then when you interview remodeling contractors, ask a lot of questions about their "system" of waterproofing.

    As a homeowner, and not an expert, I have learned that tile and grout are NOT waterproof themselves, for example, and that once the waterproofing is in place, they can't nailed through it...and so much more... And that there are codes and standards, but often not followed, and yours is one example.

    I wouldn't pay that guy for the shower tiling work, since now you have to pay to take out what was done. Is your tiler licensed? It is possible that laws require you to allow the contractor to attempt to re-do.... but, if the person isn't licensed, I wouldn't think that is the case. I can't speak to the other work done.

  • 8 years ago
    last modified: 8 years ago

    I mean, it’s not rocket science.

  • 8 years ago

    He did do what is in the picture, as for the shower walls he put up concrete boards. I would assume those are the waterproof boards mentioned in The diagram.

  • 8 years ago

    Google search and the cement board should have a waterproof membrane put over it, I'm pretty sure he didn't do that.

  • PRO
    8 years ago
    last modified: 8 years ago

    STOP!!!!! The liner you show is supposed to be behind the cement board. This is not a tile setter. 100% Clueless. Hope you have some in progress photo's of the floor. I wouldn't trust that installation one bit. What is under the floor tile? Couldn't even make a L cut at the corner of the vanity. Tub would be installed after the waterproofing and tile. Cement boards are NOT waterproof. This will not end well.

    https://www.ceramictilefoundation.org/homeowners-guide-to-hiring-qualified-tile-installer

  • 8 years ago

    Yes everything you mentioned and then some was pointed out once I brought in someone else. He said it all needs to come up. The tub was already there. Under the shower tile was a cement base. My issue now is firing the current contractor without pay. We will see how that goes.

  • PRO
    8 years ago

    I'm concerned on what is under the other floor tile. Sammy posted the shower detail above. Contractor doesn't have a leg to stand on.

  • 8 years ago

    The main floor? It's concrete boards that are screwed to the plywood. I know this cause one of the tiles was loose and I was able to pluck it right up. I want to try and save some of the floor tiles if you have any tips on getting them up! There is no grout so that helps some.

  • PRO
    8 years ago

    The cement boards are required to be set in mortar and then fastened. " I was able to pluck it right up" That's what I expected. You have a much bigger problem.

  • 8 years ago

    My new contractor said you glue the cement board to the plywood is that the same thing you're talking about?

  • 8 years ago
    last modified: 8 years ago

    You don't "glue" the cement board to the plywood - you spread a layer of thinset, and then "set" the cement board in the thinset, and screw it down. The idea is that the thinset will even out the subfloor - so you don't have gaps between the cement board and the subfloor. This way there are no voids - and the tile is fully supported.

  • 8 years ago

    $1.98 hack.