lilliejl

Feedback needed

8 years ago
Our contractor says we are too picky. Problems have been occurring but not toward the end he's said things are good enough for him. Feedback please.
Cabinet over toilet has exposed screws
& two shades of white paint because the box of the cabinet was painted less times than the cabinet fronts. The trim on another wall cabinet was cut short so he filled it in with silicone. The drawer & door fronts aren't square to each other (not evenly spaced). My husband wanted an access panel but the guy has it opening directly to 2x4's he installed, not over or under the boards. There's other things like this going on through the project. They gouged the newly painted walls in several places when installing cabinets on two walls. They went through my bedroom wall even, although they do fix the drywall afterwards. The cabinet details are my biggest complaint because I think this kind of craftsmanship is under-average for a custom job that is $8,000 for labor.

Comments (7)

  • 8 years ago

    You have a right to be mad. The unevenness of the cabinets bugs me, and the paint/lack of paint work is just sloppy. I would just tell them "make this look finished".

  • 8 years ago

    1. Perfectly fine. Just needs a screw head cover. Structural things are never invisible.

    2. Totally unacceptable. Someone didn’t measure twice and cut once. In fact, someone probably doesn’t know jack anoutbinstalling molding. Needs s new piece of crown ordered and someone with a clue cutting and installing. But only after they attempt to clean off the goo. Because if they can’t get it off, they owe you a new cabinet too.

    3. Not a big deal. Doors and drawers are adjustable, and that’s the last thing done on any job, after everything else is completed. He should show you how to do that, as you may need to seasonally adjust them yourself.

    4.?? Have him cut a new access panel and repair the drywall. Not a big deal either.


  • 8 years ago
    This was the thing that really set me off yesterday. The contractor found the cabinet base had a drawer that ran into the floor air vent. He pulled it away from the wall further and installed a wider trim piece to cover the gap. Ok, well when the granite countertop was installed, it was too short for the now longer cabinet. So he pulled the countertop away from the wall and filled the gap with grout & laid subway tile on top. The exposed corner of the cabinet didn't come up flush with the countertop, plus had no over hang whatsoever. I asked him to cut a new side panel that was taller, to meet the under-edge of the counter so nothing will catch on the wood edge and so the bottom edge is lined up with the cabinets. He said ok. He and his helper worked & left a few hours later. He hadn't cut a new panel but instead planed off the wood so now it isnt even vertically, raised it up & filled the space by the floor with silicone. The lower edge of the toe box is now higher than the edge next to it.

    First photo is how it was when he was "done" putting the granite on. Second is the fix I asked him not to do: raise up the panel so the bottom edge is not in line with the bottom drawer. Maybe that is "picky", but because he made the base cabinet longer than he should have, he created the problem with the cabinet corner not being covered by the granite.
    Here's trim & crown molding they did in the other cabinet. It'll be filled in with lots of shiny silicone I'm sure. Every single thing in this bathroom has a bead of silicone on it. Some of the silicone was not in a bead but smeared over the top of the baseboard molding and has yellowy dust perma stuck in it. Tiling is a single line of subway tile for a backsplash and grout is uneven & had cracked because it was too thin in one place, and dips in another place. They ran our ceiling vent during construction so it's full of demolition dust. The bathroom screen is filthy. The tub faucet drips heavily at night & the diverter doesn't completely shut off the shower head so you get a shower anytime you turn on the tub faucet. They pieced together one section of baseboard molding on the outside edge of a ~5" wall. So many things are being done shoddily and we have to ask to get them fixed, so we are told we are picky.
  • 8 years ago

    What does your contract say about severing the relationship? This guy is a clueless hack, and that needs a complete do over.

  • 8 years ago

    Stop work now. Do not let him touch another thing. Get another contractor (one with good references), in there, to look things over, and get a price to correct the unacceptable mess you have. The contractor you have now, hasnt a clue.

  • 8 years ago
    Thanks for the feedback. He emailed with with his adjusted Progress Invoice.
    He agreed to let us not pay for the messed up unmatching cabinet above the toilet. Yay. (no enthusiasm in that cheer). I added up the finished work that doesn't have problems or might have to be torn out or damaged if someone else has to finish this job. At this point HE owes US $1,000.
    I want to say that taking pictures & videos is really perfect for documenting the problems. I took pictures through the process to show my husband so he could "be there" during the day.
    Tonight I checked the seal on the sink. Light from my phone flashlight shows clear a few inches horizontally through the back "seal" of the sink. The stone company attached the sink to the granite.
    I AM SO MAD.
    This could become a book. I swear I'm going to turn this into a book or screen play. I think the female character will like Patricia Heaton's character on Everybody Loves Raymond. The never-ending bathroom remodel.