New build, leveling out sunken ground

8 years ago

We've a long sunken ditch in our front yard where the sewer line runs out from the house. Everyone in our neighbor hood has it to some extent. Ours is in the middle of our front yard, very visible. The builders one-time file did not address the larger area, they just put some dirt up by the foundation. The sunken portion is about 24' X 8-10' with the lowest part about 6" under grade.


The current plan is to have top soil delivered and level it as best we can. My main concern is getting this fill compacted. What's the best way for homeowners to do this? Is there something we can rent for this purpose? Once we've got the area leveled should we seed or sod? I want to start on this project now so we can get the grass down this fall, September, when the weather cools. We are in zone 6, Missouri. How do we know what kind of grass was used for the lawn and, any advice on what type to use seed or sod. We may try and over-seed the entire front lawn this fall.


I'm a gardener but I've never had an interest in the lawn. I'm always trying to remove grass not grow it so, any advice is helpful.

Comments (12)

  • 8 years ago

    The mistake they made was that they leveled the ground after putting in the pipes. Then the ground settled to a lower level than it started. They should have left a crown on top and not leveled it. In other words, all the soil that come out of the ditch HAS to go back even if it mounds up on top. Then when it settles (over the next 3 years) it will settle down to the same level it was. We had our incoming water pipes and sewer pipes replaced by the same company. The incoming water plumber knew to mound up the soil, but the sewer plumber did not. We ended up with a modest ditch where the old sewer was but the incoming was fine.

    I would use new topsoil or sand to mound up over top of the depression you have. It may not need much mounding. Then seed (in the fall) or sod (any time) to cover it. It will settle the same either way. And it does take years to fully settle. So leveling is not quite the right term in this case. If you filled and scraped it level, then in 3 years you would have the ditch back to a lesser extent than now.

  • 8 years ago

    Any suggestions on compacting the top soil? I figure we should add an inch, compact, repeat to get the best fill. Yes, I figure we need to "overfill" at least a few inches.

  • 8 years ago

    I wonder if you can take up the sod, add soil, and put the sod back?

  • 8 years ago

    I've done that before but, besides the large area, the unevenness of it makes that a difficult proposition. Or, at least a very slow one. I found a tamper we can rent from HD. I'll more forward with a topsoil delivery. From my calculations we need 5 cubic yards.

  • 8 years ago

    Too bad. A sod cutter does a great job.

  • 8 years ago
    There are lawn rollers you fill with water. There is also the option of a real "steam" roller (ride on), but that might rut the lawn, depending on how wet the lawn is. It is going to take a crap load of time to hand tamp 3 yards of loam.
  • 8 years ago
    oops, 5 yds.
  • 8 years ago

    I would not compact it. Let Nature do it.

    Since you're going to do it anyway, simply walk on it. Your weight is perfect for compressing dry soil. It doesn't take that long to walk on small areas. We are doing that for some paving stones in the yard.

  • 8 years ago

    When I was a kid, my father used to make us march around in tiny little overlapping footsteps on new lawn areas. We used to try to get the neighborhood kids to help us, ala Tom Sawyer. Didn’t usually work.

  • 8 years ago

    We found a hand tamper at HD. I think we'll fashion something of the like from plywood to move a bit faster than a foot step at a time.

  • 8 years ago

    Followup: It took 5 cubic yards of topsoil but we go the job done. We used two 2x10 nailed together to check level as we went. I used a splash block and my feet to compact the soil but some light rain helped as well. The hardest part was getting the ground level to work with the drain extension we took out to a pop-up. Next step is selecting a grass seed mix. We plan to re-seed this area and over-seed the rest of the front yard within September.

  • 8 years ago

    So you leveled it instead of mounding up along the trench? Do I understand that right?