Hi all!

Would love to hear your comments on the quality of the tile work in this newly built shower (used to be a bathtub).

Thank you in advance!

Comments (16)

  • 8 years ago
    Additional pictures...
  • 8 years ago

    Looks a bit sloppy, have seen much better and much worse. What are your concerns? What is underneath the tile in the way of substrate and waterproofing? Who did the tile work and was he being paid for wall prep in the way of being certian it was plumb and level?

    Leon M thanked millworkman
  • PRO
    8 years ago

    Should be caulk, not grout, in the corners.

    Leon M thanked Joseph Corlett, LLC
  • PRO
    8 years ago

    Take a few of the left over tile and check to see if it is bowed. Grout a bit sloppy and ditto with Joseph.

    Leon M thanked Filipe Custom Woodwork
  • PRO
    8 years ago
    last modified: 8 years ago

    The walls are obviously out of square. And they did a pretty good job of disguising that as best as they could without rebuilding it all. Minimal lippage. The grout isn’t over washed. A couple of spots it may be under washed, and a bit sloppy, but that’s a much easier tweak. The penny round work is good. No telegraphing of sheet join lines, and the grout is neither high nor low. Yes, corners need to be caulked.

    If the waterproofing underneath is done correctly, this is a passing grade. No, it isn’t top top million dollar level work. That could only be expected by reframing the walls completely, and other more expensive choices that are not part of an economy job.

  • 8 years ago

    Thank you all for the comments.

    millworkman: to answer your question, my concern is that the shower does not look good in terms of the quality of work. Tiles look too crooked, uneven bowed. Tile cuts look uneven, and the grout and spacing look off. This is contractor's third attempt at it after two complete tear downs.

    I'm trying to get a third party opinion on this. Maybe my expectations are just out of line.

    This used to be a bathtub that was gutted down to the studs and sub-floor. Contractor used some type of concrete mix to pour the pan and attached cement boards to the studs. I have a general contractor who is remodeling this bathroom as part of a much larger project (complete renovation of the entire house). So the GC is being paid for constructing a brand new shower.

    Thanks!

  • 8 years ago
    One more picture of the penny round cuts.
  • 8 years ago

    Sloppy. And the grouting is horrendous. If this is easily a passing grade, tile setters are setting a very low standard for themselves.

  • 8 years ago
    last modified: 8 years ago

    Is this a 5K shower renovation job or a 15K shower renovation job? Because the standards will be different.

  • 8 years ago
    Sophie: thank you for the feedback. It’s a $5k job. Can you educate me on the different standards and how to determine what standard is being discussed? I thought that if I’m getting a quote for a shower, the price fluctuation is due to materials and not the quality of labor. Thank you in advance!
  • PRO
    8 years ago

    This is an unacceptable installation. Can not comment on the very important aspect of the build since we can't see it (the proper pan and waterproofing method), but with the tile installation this poor I would be concerned about the underlayment. Did they do a flood test? Here's what we can see:

    Bullnose should be on the face of the niche (you should not be looking at the joint).

    Grout joints are too large and inconsistent (remember this is further exasperated by the unfortunate choice of dark grout).

    As mentioned above, caulk is required at change of plane, not grout.

    If walls are not flat and plumb before you lay anything on those walls, you shim the walls accordingly. If this was down to the studs there is no excuse for the walls to be uneven and for the proper prep work to be done to achieve a professional installation. That being said, this particular tile should not have been set on a brick joint (50% offset). This furthers the problem with lippage.

    The small cuts in corner do not meet industry standards for lay out.

    Have a qualified tile contractor provide an assessment on-site. Sorry you had this experience. There are MANY qualified dedicated tile contractors. You don't have one (especially if this is "round three"). Best of luck.

  • 8 years ago
    last modified: 8 years ago

    The 15K job will take much longer to do, with more attention to detail, and they would have squared up the walls by rebuilding them before they ever started. They would also likely use one of the foam board waterproofing systems, and you’re lucky if you got plastic behind Sheetrock and a vinyl pan liner. Their setting materials would be 10x as much, and be much more user friendly to doing a premium job. Same with the grout choices. Instead of the $10 stuff, it’d be the $70 stuff that will never need sealing. Niches would be customized to the size of the tile layout so there would be no slivers, instead of using something prefab.

    You’d get multiple shower outlets, like a rain head and a handheld, with PEX rather than a single one with PVC. You’d get tile to the ceiling, and the ceiling tiled. You’d get a trench drain and a low threshold curb instead of a bowl shower with a taller curb. You’d get frameless glass, and not a $100 framed box store special.

    Lots and lots of differences. And it’s all in the details. It’s obvious that that is a C grade shower. If it is waterproofed correctly, it will do the job. And there are no Giant Glaring Issues. Just a lack of attention to fine details that you would expect at that level.

    It’s the difference in you washing and vacuuming your car and having a $230 detailer do it. He’d q-tip the vents and treat the weatherstripping.

    Time is money. You only paid for a C level. That’s what you got. You cannot expect Premium gas for the price of Regular. And yes, we have seen much, much, worse.

    Post the in progress pictures. Because the waterproofing that we can’t see is more important than the little bit of grout needing attention that we can see.

  • 8 years ago

    You say cment board on the walls, what type of waterproofing was used as cement board is not waterproof? How did he waterproof the pan as conrete mix is not waterproof?

  • 8 years ago
    I don’t know about the waterproofing but will ask.
  • 8 years ago
    Sophie- thank you very much for your feedback. It’s extremely helpful.