Software
Houzz Logo Print
kathy547

bathroom repair/remodel help

8 years ago
last modified: 8 years ago

This part of house is older & was on butane until a leak was discovered in the gas line. The hot water heater was 40+ years old so it wasn't worth it to get everything updated & fixed at the time. Stopped using the bathroom at all until we could get the money to either repair the gas line or install an electric water heater. Which never came. We didn't know we should have drained the tank & a few years ago we had a leak. It made a mess in the 1970's shag carpet but I was happy to pull it up out of the hallway & living room. It also loosened the tiles in the bathroom. I want to fix this bathroom but I have never done any kind of repair or remodel. I have no idea where to start. My husband is on oxygen so what I can't do myself we will need to find someone to do it for us. Problem is, we've had a hard time finding people to come out & give estimates. Which we need to have an idea of what we need for a loan.

Comments (16)

  • 8 years ago
    You need to be more clear here. The history of the damage is irrelevant. Is this a down to the studs remodel? Flooring only? Are you hiring the work? Full bath or half bath?
  • 8 years ago


    This shows the bathroom when you are standing at the doorway from the hallway. The closet with the hot water heater is to your left. We think it was added after the hot water heater was put in. I would like to get rid of it & start over.

  • 8 years ago

    Sorry, for some reason my photos are not loading here. Maybe because I'm trying from a phone?

  • 8 years ago


    Because of all the damage to the wood, I think we probably want to gut it & start fresh. The closet to the left I think I want to remove.

  • 8 years ago


    I like this separate shower & tub. If enough room, reverse it to keep the tub in the same spot that it currently is & put the shower where the closet is. But.....will still need to put the hot water heater somewhere.

  • 8 years ago


    Since my husband gets out of breath easily, I really like this shower with the built in seat.

  • 8 years ago


    This looks most like what the bathroom looks like with where everything is. I know from reading up that moving the toilet, tub, etc. will shoot expenses up so I'm trying to keep everything in the same spot. My husband does not like the way the tub looks. I would rather have a wall/door than a curtain.


    The bathroom is 137 inches long & 82 inches wide.

  • 8 years ago

    kathy547 what is your anticipated budget overall?

    I know you probably don't have a really clear plan at this point - but what is your ballpark budget for this job?

  • 8 years ago

    Haven't set a budget. Thinking to get an estimate on what we want & then tweaking as much as possible.

  • 8 years ago

    10k, 20k, 30k? You must have some thoughts?

  • 8 years ago
    last modified: 8 years ago

    I agree with millworkman, you have to have some idea what you want to spend - what is too much, etc. That is the first step.

    If you are considering a loan, then you need to have an idea of how much you can afford to pay back every month. Also, you need to know how much a bank would loan you given your income, your commitments and the value of your home.

    Estimates take a contractor's time and money - if you haven't done some basic work first and established a realistic ballpark budget then they aren't going to talk to you.

    Here's a very general idea in the midwest - some will quibble with these ballpark numbers, but they give a general idea:

    A basic bathroom (not like the ones in the photos) but decent will cost no less than $8-12k. At the low end of that you will have vinyl floors, fiberglass shower/tub surround, painted walls, basic fixtures.

    In the $12-15K you will get nicer fixtures and some tile (possibly the floor also).

    Around $15-20k you will get tile on the bath walls and floor and some higher end fixtures at the high end of this.

    $20-30k you are going to have a very nice bathroom (probably couldn't spend that amount on a room your size)

    What I suspect is that when that room is gutted there will be structural / plumbing / electrical issues beyond what one normally expects -- putting you in the higher end of these ballpark estimates.

    If I were you I'd be looking at "Can I afford / will the bank loan me / $8-12K". If the answer is yes, then I would go the next step and say "what can I get for that?

    The monthly payments for a $12,000 loan would be about $181 a month for 7 years at 7%.

  • 8 years ago

    We just had our bathroom redone. Went from tub to walk in. Reused the toilet. New counter, sink, cabinet and flooring (vinyl wood looking floor). We had white tile 3/4 of the way up the walls, all the way around. that all had to be taken down and new walls put in. We bought the medicine cabinet and towel bars, etc. Cost us $9,000. I am very happy. Did not get glass doors, preferred shower curtain.

  • 8 years ago

    kathyg_in_mi was that a gut down to the studs and joists?

    This is going to be a complete gut - and then I betting some additional issues (the water heater, for example).

  • 8 years ago

    Question: Is this your only bathroom or do you have another bathroom you can use?

    Here's why I ask: Contractors HATE guessing at the scope of work. If the room was demolished to the studs they can provide a cleaner bid without guessing about structural issues (rotten wood) or plumbing / mechanical issues.

    When you have secured your money, you may want to hire someone just to clear it out first - then get good bids.


    Kathy Johnson thanked Jake The Wonderdog
  • 8 years ago

    Not sure why my comments aren't loading for me so sorry if I'm replying multiple times.


    We do have a second bathroom so work will not have to be rushed. I think we will budget $12,000 & do any tweaking as necessary.

Sponsored
Haus Studio
Average rating: 4.8 out of 5 stars28 Reviews
Franklin County's Preferred Custom Cabinetry & Design Studio