We are getting our bathroom redone, and this is what the tile looks like after the contractors spent many hours on it. Crooked lines, edges are messy, some tiles are crooked and just messy overall. Should we have the contractor keep trying to get it right or should we start over with an actual tile installer?





Comments (25)

  • 7 years ago

    I'd give that a Hard No.

    I can see the edges of the sheets of tile, the grout lines of tiles are wavy, etc., (can't tell how the slope is).

    But--if you decide that you can live with it, pick a grout that is as close to the color of the edge of the tiles as possible. That will minimize the flaws. You don't want to highlight the bad lines with light grout.

    naturallykarin thanked tatts
  • 7 years ago
    last modified: 7 years ago

    sheesh,,,,what does he plan on doing around the drain? these small mosaic sheets are a little tricky to install. first rule is "go easy w/the thinset or else it will ooze up and obliterate your grout joints". Second rule is, 'you must stagger these sheets to avoid any grid lines'. It would appear your tiler has never heard of these rules.

    I can tell you right now, grout will not hide any of these flaws. If you had white pennies and the exact same color white grout, maybe you could get by, but i'd still notice it.

    So, what to do? If you want it to look like this, (and these are examples of beautiful installs w/penny rounds), rip it out and hire someone who knows how to lay these.

    look at the corners. almost perfect the way the pieces were cut and how they line up w/one another.









    Otherwise you're going to end up with a shower floor that looks like this:


    this is why you should stagger the sheets or else you'll end up w/obvious grid lines.

    Who is your tile guy? how did you choose him? what is his cost compared to other estimates you got?

    naturallykarin thanked Beth H. :
  • 7 years ago

    This is our contractor who was hired to do our entire remodel. We thought that we were getting an actual tile professional for the shower, but the contractor said that he is going to do it, and now this.

  • 7 years ago
    last modified: 7 years ago

    We thought that we were getting an actual tile professional for the shower, but the contractor said that he is going to do it..

    No. He's the contractor. the contractor is supposed to hire an actual tile professional, unless you agree to substandard work.(which you've seen. If you relent and go forward w/this guy, don't complain when your shower looks like crap) Obviously he doesn't lay tile everyday and doesn't know how to do the trickier types of tile. I've seen enough, have you?

    It's your money. You decide where it goes. If this was my shower, I'd spend money on an actual tile professional. At this point, I wouldn't let him pick them either. Sounds like he wants the money for himself so hiring a really good tile setter is going to cost him (and you)

  • PRO
    7 years ago
    last modified: 7 years ago

    He is far beyond his pay grade and skill grade. Rip it out. Get a tile pro. You get the pro. Don't ask him..............: ( He isn't a judge of tile skill.

    I'd also reconsider TWO niches. I can only imagine what those would have looked like......and I would get rid of one now. Maybe both.

    What are all your other selections in the space?

    naturallykarin thanked JAN MOYER
  • PRO
    7 years ago

    Get an actual tile setter and redo that floor and as for niches forget them they always are yucky and there are many nice over the the wall holders for shampoo and soap. I too would like to see your other choices. Honestly my 16yr old grandosn did a better tile job on a table for his Mom.

    naturallykarin thanked Patricia Colwell Consulting
  • PRO
    7 years ago

    Make the contractor pay to get replacement tile, and bring in a real tile setter. This is just bad. Penny rounds should not be that difficult to install, if you know what you're doing.

    naturallykarin thanked Sabrina Alfin Interiors
  • 7 years ago

    BTW (sorry to pour salt on the wound) the cement board was installed wrong. You can tell it was put up vertically instead of horizontally as is required when using RedGard.

    naturallykarin thanked chiflipper
  • 7 years ago

    Wow. Just....wow. This is a "STOP! DON'T TOUCH ANOTHER THING!" type of install. I'm so sorry this has happened. You have two options:

    1. Force the GC (I always question a GC who THINKS s/he can do the most difficult/expensive stuff themselves) into finding a tiling professional and getting this done PROPERLY; or

    2. Forcing the GC to give BACK the bathroom/tile money and YOU go out and find your own tile contractor to get the job done properly.


    #1 is more appealing because it will be the most cost effective (for you) but it puts the choice of professional into the hands of the GC (we've already seen some questionable decision making in this area...I wouldn't trust the GC to pick an EXPENSIVE professional).


    I prefer option #2...but it will be MUCH MORE expensive for you. The GC has tried to save/make as much money as possible by sourcing him/herself out as the tile installer. The money you would get back will not be enough to pay for the bathroom redo. You will be out more money...but you will have the satisfaction of knowing you have chosen the highest level professional in your area.


    In building law (this is a general rule and should be investigated in your state/province), the professional must be given ONE attempt at fixing the problem. Once the FIRST (and only) attempt has failed, you are welcome to go out and find another professional to do the work at the contractor's expense. Yep. At the contractor's expense. Sounds great doesn't it?


    Small problem...it is near impossible to get this to happen because it is very difficult to get contractors to pay for things once the job is done. It often requires a trip to small claims court....


    Sigh...Stop the work in the bathroom. Sit down with the GC and discuss what needs to happen. Before you do this, you will need to be relatively well versed in tile setting and water proofing. If the chiflipper is correct, then the whole shower has to be redone...and the GC will NOT want to do any of that. And I mean REALLY will not want to do any of those things.


    I'm going to guess that the GC is 'making his/her money' on this bathroom. The bathroom is his 'big pay day' because s/he believed the money saved on labour goes directly into his/her pocket. Anything that needs to be redone comes DIRECTLY out of his/her PROFITS.


    I'm so sorry this has happened. Please take a few days to do some research on Best Practices for water proofing and tile setting. This will give you a sense of 'power' when sitting down the the GC to discuss the matter.


    Good luck and keep us in the loop. More photos of your bathroom would also be appreciated...we might see some other things that need to be discussed with the GC.

    naturallykarin thanked SJ McCarthy
  • 7 years ago


    Same thing happened to us. My floor tile and marble (upper) border around the niche is uneven. We decided to go ahead and keep it.

  • 7 years ago


    Another pic of uneven marble border around (upper) niche.

    naturallykarin thanked whitney415
  • PRO
    7 years ago

    So sorry you are going through this... I noticed something else in your pictures...

    I am thinking that shouldn't look like that.

    Dig in - be polite and educated in proper shower waterproofing and tile installations ( there are many references posted by the tile pros ) and have a frank discussion about what your expectations are and hopefully it will all work out.

    BTW I love the tile - looks like a penny but its square!



  • 7 years ago

    No, not acceptable and like so many others have said, how will the walls look...the drain be addressed, etc.

    I had a similar problem with a shower floor and flat marble 'pebble' tiles. They had to rip it out, not once but twice. The first time was the slope on the poured pan was off. And the second time was the same issue you show, plus terrible work on the walls of the shower. Stop work immediately and take a step back and decide what you'd like to have happen. What SJ has said above is typically true (and I hope you had a contract) that a GC is given the right to cure the problem. My GC paid not once but twice for the tile for the shower floor, and replaced the wall tile once as well to make it right.

    I stopped construction, which I put in my contract I had a right to do if work was not acceptable to me.

    Luckily my GC worked hard to make it right, but he did have to find new tilers and I was extremely happy about that after seeing their first attempt.

    Best of luck, hope your GC makes this right for you!


    naturallykarin thanked Dawn Martinez
  • PRO
    7 years ago
    last modified: 7 years ago

    Chiflipper is correct for the most part. CBU horizontal installation is according to ansi not Redgaurd. Redgaurd is stating that their product is to be used over properly installed CBU's Cement board is to be installed horizontally with staggered joints if the wall width exceeds board length. This eliminates a joint from floor to ceiling which would create a weak point. aka hinge joint.

    The patterned squares Debbie Washburn pointed out are simply the embossed grid on Hardi board.

    naturallykarin thanked Creative Tile Eastern CT
  • PRO
    7 years ago

    Thanks Creative - I wasn't sure - on my screen it looked weird!

  • 7 years ago

    Ummm, what else did you notice in my shower pic?

  • 7 years ago

    Thank you all so much for all of your help! My husband confronted our GC this morning, and he has agreed to rip it out and start over with an actual tile guy. GC says that he will pay for the new tile. I am hoping that a tile guy with experience will take a look and do it right, including the messy walls. Thank you for the quick and helpful replies!

  • 7 years ago

    GOOD news! I'm happy for you!

    naturallykarin thanked whitney415
  • 7 years ago

    Just be prepared to pay for expertise. It does not exist on a budget. You’ve already seen what a budget contractor does. https://www.ceramictilefoundation.org/homeowners-guide-to-hiring-qualified-tile-installer

  • 7 years ago

    Our contractor did bring in a tile guy. He says that the guy is 'old school' and that he is going to 'float it', and that the edge of the shower walls will stick out about 3/4 inch.


    We are thinking that the GC told the guy to do it how it will benefit the GC. We don't want it to stick out. How in the world will 1/4 inch thick tiles, and bullnose be OK if it sticks out by 3/4 inch?


    We have another time guy coming over for an estimate and opinion tomorrow, but we are worried about the contract with the GC. Ugh.

  • 7 years ago

    OK...some basics need to be covered. A 'tile setter' is there to set tiles. S/he will work with the surface that the GC gives them. If the WALLS are not firred out (made square and plumb) by the GC (you need someone who specializes in framing to do this...not just some guy with a hammer) then the tile setter has to do STUFF to get things to sit nicely...like FLOAT a tile install.


    A WELL prepared surface (which does NOT seem to be included in your shower) does not NEED to have all that extra material to set the tiles. But it DOES require the GC to spend a bit more money on the LABOUR (ahem...the framer) to get this surface READY for the tile setter.


    Again, this comes back to the GC. It is up to the GC to get things lined up (ie. 'ready') for his/her subs. If the subs are given POOR substrates to work with, then they have to go 'old school' and float a SHEEP load of material to get tiles to sit nice and happy.


    If the GC gets things as 'perfect' as possible, the tile setter has nothing to do but throw up the tiles. Can you see where I'm going with this? Yep. It is up to the GC to get the walls ready. If you do NOT want 3/4" of floated material, then you best explain that, in writing, to the GC.


    A point of interest: a laid tile (of any sort) often has a total thickness of 3/4"...it is what it is.

  • 7 years ago

    following

  • 7 years ago
    last modified: 7 years ago

    karin, if you're having an old school tile guy come in to float the walls, great! This way he can get your walls nice and plumb/flat.

    I had my shower mudded. it doesn't stick out that far that a regular bullnose tile or edging piece won't work.

    here was mine after he started laying tile.

    you can see the side here next to the drywall. I used a chair rail molding piece as my border (on the left side) since I needed something to match the basalt. On the right side and on top rows of the white tile, I used bull nose pieces.

    As you can see, it doesn't stick out so much that it's a problem getting tile to cover it.


  • 7 years ago

    Looks nice!