Software
Houzz Logo Print
brian_flotterud

Gable trim meets Valley

7 years ago
last modified: 7 years ago

Hello,

I am preparing to put a metal roof on my Cabin. I am in the planning stage and have an issue that I cannot mentally visualize how I will handle.

I have an section of roof where a valley intersects with a gable on one side and a drip edge on the other. Clearly I will put the drip edge down first and the valley on top of it, but what do I do on the gable side? See attached photo, red arrow points to trouble spot.


Comments (8)

  • PRO
    7 years ago

    It's not clear from your image what the problem is. Looks more like a carpentry issue than a roof problem.

  • 7 years ago
    last modified: 7 years ago

    It looks to me like the fascia board needs to be replaced and extended to meet the other Coming down from the gable to look like the below picture.



  • 7 years ago

    Not sure I understand your problem but here is how ours was done but not with a metal roof. The spot where your arrow is pointing we have a small section of gutter that meets the other gutter at a right angle.

  • 7 years ago

    The challenge is not the boards. I will address the rot before doing the roof. The challenge is that on the right side of the valley, to properly flash the area, I will put down drip edge, the drip edge will go under the metal sheeting. However, with a metal roof, on gables you put the gable trim over the roofing material to create your water tight connection at the edge of the roof. When this meets the valley it will cause two issues. 1st issue, no flashing under the left side of the valley. 2nd issue, water running down the valley will splash into the back of the gable trim. Final concern, how will it look aesthetically when done correctly?

  • PRO
    7 years ago

    Now I understand. If it were my house, I'd extend the gable out a few inches so it could be flashed like a standard corner.

  • 7 years ago

    That would introduce an whole new level of challenges. First I would have to redesign that entire gable, which I do not plan to do anything with besides address the rotted area. Secondly I would need the power company to come and relocate my service, as my service is tethered to the gable currently.

  • 7 years ago
    last modified: 7 years ago

    Please describe the metal roofing system in detail.

    The gable element is a "rake" and the other element is an "eave".

    Both should have a drip edge of some kind.

    The details will depend on the metal roofing system you have selected.

  • PRO
    7 years ago

    Find a pro.


    Those aren't always done cleanly and correctly, so unless you have a pro, remember to work from the bottom upward, layering so water drops down to another layer. If you cannot find a detail for this, I'd do edge metal first, felt over, valley over, roofing over, then another edge piece on the gable (aka barge aka rake) end.


    Find a wood or comp roof to examine details. All the same except the edge metal confuses things. You just don't want that edge metal to direct water back in at the valley.