    No, needs to be fixed to correct spacing BEFORE grouting - from the little we can see. But this may not be the guy you want completing the job anyway, he's not a tile guy.

  • 6 years ago

    You should have a discussion with the tile pro tomorrow and ask them how they did the waterproofing and what products they used. I'm sorry this is happening to you. A horrid tile job was the first clue I had that things were wrong, and it turned out they didn't even build or waterproof the shower correctly. I was ignorant about waterproofing. The ugly tile installation was the red flag that made me pay attention. Turns out there were deeper problems. I wrote out my story to help others. Hopefully there's something in this story that helps you:

    https://www.gardenweb.com/discussions/5725013/what-to-do-when-a-project-goes-completely-south#n=66

  • 6 years ago

    "Does this look right."

    No.

  • 6 years ago
    last modified: 6 years ago

    That's hilarious! He's got spacers in the joints that don't even touch the tiles! Does he think spacers are for decoration (because they certainly aren't of any use here)?

    This is garbage. Tear it out. Well, make him tear it out; then hire someone else..

  • 6 years ago

    I'm speechless. That's pretty bad!

  • 6 years ago
    last modified: 6 years ago

    More work. Should they be even grout line with the border tile



  • 6 years ago

    Never seen anything this bad !

  • 6 years ago
    last modified: 6 years ago

    Without even looking at the tile the substrate was not properly prepared or waterproofed. Cement board not taped, Redguard only on the seams, what from here appear to be drywall screws. He had no business starting the tile work. Complete fail. So in reality he left before he started, he just did not inform you.



  • 6 years ago

    Absolute tear out dreck.

  • 6 years ago

    It wasn’t waterproofed correctly and if you continue you will wind up with water leaks and mold. It’s a complete do over

  • 6 years ago

    Read the "Goes South" post and use some of the advice in there to talk to your contractor. Have another person with you, use email for all communication and to confirm any verbal communication to create a paper trail. Give them 1 chance to fix (if your states construction laws require), request a refund when you fire them, and hire a new tile professional who is qualified. You can use these sites to find a qualified pro in your area:

    https://www.ceramictilefoundation.org/

    https://www.tile-assn.com

  • 6 years ago

    @Maureen Barnes, halt work now. Red guard on the seams only is a huge red flag, which is real water damage waiting to happen, the other tile work is just horrible esthetically, etc. But the lack of proper prep and waterproofing can create huge issues for you down the road. Stop the work. Speak with him about tearing out what he's done, on his dime and hire a proper tile person. If this is a reputable GC they will do that. Did you have a contract?

  • PRO
    6 years ago

    Stop all work NOW. Red Flag Count;

    1- The cement board needs to have the seams taped and floated (a certain way)

    2- The red guard needs to be applied to the entire tiled area at least 6 feet above the floor

    3- The red guard needs to be applied to the required thickness

    4- The cement board needs to have the approved fasteners (Drywall screws are not approved)

    5- The pipe and valve penetrations in the walls need to be sealed


    And that's what I can see in the background of the one picture. Got any more 'during' pictures? Pictures of the tools and materials before they were installed?