always1stepbehind

Brainstorming for small bathroom redo.

I'm in a condo and we only have 1 bathroom. It's a basic set up as you walk in...counter, toilet, tub. It's probably what most people have as guest bathroom. The tub is a jacuzzi tub which I like but it's old and I'm pretty sure it's been reglazed before..not sure I want to save it or try having it refinished to keep a jacuzzi tub, I'm ok with a new regular tub.


Now my biggest concern/issue is the moisture in this bathroom. Surprisingly it doesn't get moldy but the metal hinges on the medicine cabinet are all rusty and flaking and the metal on the light fixture is also super rusty. The texture on the walls are also crumbling in areas. I know I need to upgrade the exhaust fan for sure. So keeping in mind there is no window for helping with moisture, would I be better off doing a plastic surround that you install with a tub and the rest of the wall areas stay drywall...or would all tile on the wall be better? Tile in shower area above tub and as much wall space as possible.


First pic is looking into bathroom from bedroom. Not pictured, but door into the bathroom from the hallway is to left.


Second pic is tub area. The plastic surround has never fit right where it meets the top of the tub and it's a moldy mess and has damaged the wood frame behind.


I'm thinking all the drywall needs to be torn out and start from scratch, there will be wood repair needed to the framing around the tub for sure from water damage.


So thoughts on the plastic tub surround vs doing all tile?




Comments (13)

  • 6 years ago
    last modified: 6 years ago

    If you do a surround it will have to be a two piece. My DH has put them in for tenants and has not had problems. It is the easiest.

    I would put a new tub, tile and install a nice glass door.

    We did this in our tiny guest bath.

    You can see the reflection of how close the toilet is and the vanity which is directly behind.

    Visually, this opens up the room. I like a nice shower curtain, but in this case it felt claustrophobic.

    I would get a regular tub

    always1stepbehind thanked eld6161
  • 6 years ago
    last modified: 6 years ago

    Eld, so if I did the plastic surround, just leave the rest of the walls painted drywall?

  • 6 years ago

    You will have to make sure they can get it there. We actually have one in a bathroom but it is one piece and was put in after demo. So bathroom was then created around it.

    Most people don’t tile all the walls but we have done it in a few bathrooms.

    It is more expensive.

    always1stepbehind thanked eld6161
  • 6 years ago

    I like tile which continues on the wall behind the toilet and sink. I have done that in various bathrooms as it is easier to clean. As long as your tile price is reasonable, the cost shouldn't be too much extra as the wall tile is easier to install than the tub surround. It will add to the cost so you will have to think about how long you expect to stay and decide whether the upcharge is worth it to you. Unless the tile job is a knockout, tile wainscoting probably doesn't add much resale value.

  • 6 years ago

    The light and fan are currentLy on the same switch. The back wall of the shower area is on a shared wall. someone had mentioned to me moistures sensor bathroom fans...that could be an option. I’m assuming those turn themselves on when needed...?? Thanks Beth, I really like the look of the first bathroom.

  • 6 years ago
    last modified: 6 years ago

    OOPS, correction, light and fan is not combo, I meant the light and fan turn on with the same switch.

  • 6 years ago

    when I finally get this done, it has to be someone that can come in and get it done in a few days...I don’t know how we’re gonna be without a bathroom for days at a time...can’t be drug out...that is a huge concern for me.

  • 6 years ago

    Always, when a home has only one bathroom they make sure you have use if the toilet until the very last minute. You will have to shower elsewhere.

  • 6 years ago

    I can deal with that. LOL

  • 6 years ago

    While I certainly have heard of quick remodels on one bathroom homes, most remodels I've heard of have taken longer than expected, even when done by a professional. I would recommend contingency plans - staying at a hotel or relative's house or having a port-a-potty put in your yard.


    In my opinion, tile all the way to the ceiling with proper waterproofing behind is a higher end look. I also like the durability of tile (when properly installed). However, I imagine solid surface systems are probably faster to install. Get some quotes and timelines and make sure you check references. Decide what's most important to you: the quick install or the end result.

  • 6 years ago

    We also need to keep in mind budget.

  • 6 years ago

    I agree that most remodels take longer than estimated. In the bathroom this morning I was realize just how small my bathroom is and even with the toilet and vanity out, a one piece might not even fit trying to get it in from the hallway. Things to consider right!! But I can tell you...anything will be better than what I have now.