Software
Houzz Logo Print
joanie_appelbaum

Wood floor issue

6 years ago
last modified: 6 years ago

Is this cupping? We had new flooring installed and it appears to be cupping. What can we do? The floor was installed in August after laying inside our home in a large pile for a couple weeks. Could it acclimate being in a large pile?

Comments (40)

  • 6 years ago
    last modified: 6 years ago





    Is this normal? If not, what do we do about it?

  • PRO
    6 years ago
    last modified: 6 years ago

    Yes, it's cupping. The humidity level in your home is out of range (30-50% normal living condition ). Correct the humidity and the floor will return to it's original state. It will take a few to several months since the floor boards are sealed.

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    This is only occurring in areas where we have new hardwood. The existing hardwood is fine. Still you think the humidity level in our home? Thank you G & S!

  • PRO
    6 years ago

    is this over crawl space or finished space? Anything else change as part of the renovation?

    J. Appelbaum thanked HALLETT & Co.
  • 6 years ago
    last modified: 6 years ago

    The new wood was stacked pretty high as part of acclimation. Does that affect the new boards adjustment to our home? In the living room the install is over an unfinished part of the basement. In the upstairs bedroom, part of the install is over the garage which has a finished ceiling, but isn't temperature controlled. Our existing wood floors are not cupped.


  • 6 years ago

    Existing wood = acclimated in place x years. They SHOULD look flat. The new stuff really needed to be stacked and racked PROPERLY during acclimation. It can sit indoors for years....but a few weeks before installation they needed to be PROPERLY arranged. Did you see that happen?


    And the other clue: "In the living room the install is over an unfinished part of the basement. In the upstairs bedroom, part of the install is over the garage which has a finished ceiling, but isn't temperature controlled."


    So...control the areas UNDERNEATH the floors (basement and garage) and you will control the cupping of the floors. The planks are like arrows. The centre of the plank will point in the direction of the EXTRA moisture. If the centre of the plank is HIGHER than the edges (called crowning) then the moisture is higher ABOVE the plank (ie. the air) then below the plank (the centre is pointing up)


    If the edges of the planks are HIGHER than the centre (called cupping) then the moisture is higher BELOW the plank (the centre is pointing 'down').


    What were the moisture readings of the wood on the DAY it was installed (10% random choice planks would have been tested and recorded)? What was the subfloor reading? The atmospheric conditions? Humidity IN the house?


    Do you have whole home humidity control?

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago
    last modified: 6 years ago

    Excellent information! There was no rearranging of the wood in the house or checking of moisture in the wood prior to installation. The way you describe where the problem is, tells me it's underneath. In our master closet that's also over the garage, we had insulation blown in under the floor because that room is always cold. I don't notice cupping there. Maybe we need to consider insulating below the bedroom that is also over the garage, even though the room is comfortable? I don't think we have whole home humidity control. We definitely have it in the basement. I'll ask my husband :)


  • 6 years ago

    It is rare to have 'whole home' humidity control JUST in a basement. It sounds like there is a portable dehumidifier in the basement (very common). That is not whole home because it isn't attached to the heating/cooling ducts.

    Adding the insulation below the bedroom is the right thing to do. The foam insulation can be used as a vapour barrier = stops the moist air in the garage from entering the house through the bedroom floor.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    It's actually attached to the system in the basement. We have 2 complete systems. The unit in the basement handles the first floor too. The upstairs unit handles the master bedroom. For the living room issue on the main floor, the unfinished area below it does not have a finished ceiling. Would we just put insulation and leave it exposed?

  • 6 years ago

    We have some cupping in the closet upstairs where there was insulation blown underneath the subfloor.


  • PRO
    6 years ago

    If, it is not a humidity issue. It can be a cleaning issue, with too much water being used. Another possibility is a leak. Look for a nearby water source. Condensation from a HVAC system can cause moisture issues if, it is not wrapped.

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    What is the indoor RH (Relative Humidity) in each of the areas of concern and BELOW? What is the temperature in the home?


    Start with the basics = data. If you have to, you can purchase hygrometers are Home Depot (or online) for about $30 each. If you buy a couple of them you can place them in different areas of the house and take data from there.


    I would look at early morning (just before the heating turns on to start the day), middle of the day and in the evening just before bed (just after the heating is reduced to go to bed).


    Keep a data sheet beside the hygrometers so that you can jot down what you see and continue with your day. Do this for a few weeks.


    In theory, the heating season (winter) is the DRYING season. Which means the humidity in the home SHOULD drop...quickly. Once the humidity drops, the floors *should start to flatten out. If they DON'T (hopefully they flatten by April) then you have other issues to attend to.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago
    last modified: 6 years ago

    This is so very helpful! I'm going to look into purchasing a hygrometer or two. My contractor is coming over today to take a look at our issues. If the floors don't flatten by April and we have to resand, etc., is that expected to be our cost? I just don't know proper expectation for this. Thank you!

  • 6 years ago

    The concept is: Household conditions, such as heating, cooling and humidity control is up the the owner to "provide" the proper levels for the product the homeowner has chosen. In other words, the house stuff is all yours.


    The lack of proper installation of hardwoods is carried by the flooring PROFESSIONAL (did you use a flooring professional or did your contractor use "Joe the guy with the hammer" to install the floors). Whomsoever HIRED "Joe" the not-so-pro is financially responsible for any of Joe's oopsas. The GC finds the subs which means the GC is on the hook for anything his subs mess up. The only time this is NOT the case is when the homeowner specifies a particular sub to be used or 'opts out' of the contract for that particular job (ie. the flooring job).


    The act of installation STARTS with RECEIVING the wood. Yes we have to go WAAAAAY back to the dude(tte) who stood in the driveway and signed the delivery slip for the wood floors. The person responsible for FINDING a storage space is also part of this cohort. In a perfect world the flooring PROFESSIONAL would have been on hand to check the wood (cull what needed to be culled) and to test the Moisture Content (MC) of the wood when it arrived (same day). The home's living conditions would have been documented as well as the weather outside at time of delivery. The document would be kept with the flooring professional which s/he would access anytime they walked onto the job site.


    The LOCATION of storage (do NOT call it acclimation....wood sitting in a pile for MONTHS = storage, not acclimation) is on SOMEONE. Find out who that was (probably the GC or one of his/her subs).


    Now the ACCLIMATION is the BIG thing - after the storage. Acclimation is when the wood planks are MOVED to the room/level where they are to be installed. This is the BEGINNING of acclimation (it makes NO DIFFERENCE if storage is in a warehouse or your house).


    Ideally the wood planks would have had 10% of randomly chosen planks MC tested....just like on the first day they arrived when they were MOVED to the rooms they were to be installed in. Or at the very least the same LEVEL of the install. Again the flooring professional would have done the MC testing for the subfloor at that time as well as the home's living conditions (temp, humidity, etc) as well as the weather outside (just like the data taken at time of delivery).


    These numbers will be the SECOND set of documents a flooring professional would have taken. The THIRD set of data would be gather on the day of installation. Each room would be documented separately, wood MC and subfloor MC taken as well as indoor living conditions and weather outside.


    This would happen each day floors were installed (assuming it took more than one day to install all the new wood). The wood floor acclimation documents belong to the HOMEOWNER. It is part and parcel of what they paid for. The flooring pro will keep a copy for their own records...just in case something like this (cupping) happens inside the labour warranty time frame. It saves their butt.


    Whew! Lots of work for the wood flooring professional. Now you know why a flooring pro gets paid MORE than "Joe" the hammer toting guy. The flooring pro has HUGE responsibilities for his/her work and the materials provided to him/her to complete the job.


    With all of this in your mind (print it off or whatever) go ahead and ask the GC all the HARD questions. My first question would be, "May I have our copy of the wood flooring acclimation data please?" If your GC looks at you like you have two heads, you can assume s/he has: A. NEVER heard of such a thing (sigh....it happens more than you think) and B. does not use a flooring pro...Joe the hammer guy is the GC's go to guy for flooring installs.


    The improper installation (lack of proper acclimation/documentation) is PART of the issue here. For that part, the GC is on the hook.


    The other PART of the issue is "indoor living conditions". That part is on the homeowner. You are unsure as to what level your humidity controls are looking at...which means you will NOT have any data SINCE the floor was installed. And that's what saves YOUR butt.


    My guess: both of you will be responsible for costs of a redo. I would think 50:50 would be an appropriate split.


    Personally, I like 'money back' from a job. The GC would probably be interested to talk about a discount instead of a full sand/refinish. It is faster and easier to write a check then it is to organize a REAL flooring pro (Joe's out) and to have the job done properly.


    Take the money and bank it: leave it to gain interest just in case you need work done on the floor in the future.


    Besides, sanding down newly installed wood floors that are cupping is not a good idea. The sanding will carve off the RAISED part of the floor (the edges) making the planks thinner on the edges and thicker in the middle. This is not something you want.


    One of the best solutions is 'time'. Simply wait it out like they did in the old days. Give it 10 years. If it hasn't settled down by then you take the money you put away (the partial refund) for this and use it to correct the issue.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    The flooring guy has offered to sand and refinish all the areas in question. What is interesting, is that the sitting area floor in the master bedroom seems to be fine and without issue, whereas the rest of the master including the closet is having a problem. The sitting area is over the laundry room and kitchen, where the other wood is over the garage. Thinking the garage might be the issue doesn't explain why some boards in the hallway are cupped too. Ughhhhh.... SJ McCarthy, you have been very helpful!!

  • 6 years ago

    You're welcome. I'm glad my few minutes a day helps you in the years to come. My advice will always be as honest as I can get (without being snotty...I can get there but it takes a LOT of 'stupid' for me to rant).


    I always advice the cheapest thing possible (if it is advisable) = wait. Wood floors in a renovation without some of the basics (like acclimation or home humidity control) can do wonky things for many years.


    What you are 'after' is to save the LONGEVITY of the floors. That means to stay away (if possible) to anything that will shave off years or cycles of use. A solid wood flooring cycle is 20-30 years and then it is refinished. Solid hardwood should offer 80 years of service. Any time you shave off more than is good for the floor (like sanding down raised edges with cupping) you shave off years of service.


    That's why I would be willing to give up on 'perfection' and accept the money instead. If put away in an investment, it will have gained enough interest to deal with the floor at a later date.


    The other thing: let's IMAGINE you go ahead with all three recommendations (whole home humidity control...and deal with the garage PROPERLY) and you have the floors sanded and refinished next April.


    Your 'climate control' efforts will cause the moisture in the planks to dry out...thereby SHRINKING the planks back down to normal size. But OH! WAIT! OH NO! The edges of the planks are now LOWER than the centres (because you shaved off the puffy edges). Oh no. Now it looks like it is crowning (but it isn't...it is just the thicker centre sitting HIGHER than the shaved edges). Oh no. What have we done?


    Right. Stop the madness. Wait it out. Ask for a refund/rebate on the floors and leave them be. Get the garage dealt with (obviously the moisture is coming through the garage and the poor VAPOUR BARRIER in the garage ceiling is ALLOWING moisture to push through to the wood floor above). And then let everything settle for another 8 months or so. And during that time you go ahead and have all the humidity levels in the home (or at least where the hardwoods are) dealt with as well. Now you let it settle down for another 8-12 months.


    See where this is going? Don't change the wood until you CHANGE the environment first.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    Thank you , SJ McCarthy! I do see where you are going. Is there a point where the wood will not go back to being flat?

  • 6 years ago

    It takes a VERY short amount of time to PUFF but it takes 2-3 times the amount of time to 'flatten'. If it took 4months to puff, then I would expect it to reduce in size after 12 months. Of course this 12 months must include INDOOR CLIMATE CONTROL (see above) which it sounds like you do NOT have (or do not have PIN POINT accurate control for all areas).


    Once too much time has passed and the floor has NOT settle down, it may never settle. That's why G & S states an inspector suggest waiting 12months.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    The issue was visible about 2 weeks from completion.

  • PRO
    6 years ago

    You will need to inspect the surrounding areas for any possible active leak. once you have ruled that out. You can focus on the humidity. If, the cause is due to humidity, ask for a extended warranty, 2 years perhaps. That will allow you to get the floors repaired or redone if, the floor does not flatten out Within a year.

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    What day was 'installation day' for the wood floors and what day was "completion"?


    What was the weather like around about the time of the cupping? What was DIFFERENT in the house around about the time the floors began to cup? Was the HVAC on? Was the Air conditioning off? What were the settings leading up to the cupping (around the house)?

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    Here's the long version of our process: Generally, this project dragged on for far too long! On June 25, I was told that hardwood needed to be delivered 7 days in advance for proper acclimation, anywhere in the house under AC. They delivered Friday, June 26 and stacked the wood in the middle of our carpeted living room. We ended up delaying the start by deciding to redo our staircase. We weren't thinking about doing that, but our flooring guy made suggestions and we decided to pursue that. The floor job started July 27 after we made our decision on the staircase and based on that vendor's timing. Furniture was moved and carpet was removed in the upstairs Master BR and sitting area, plus the upstairs hallway and stairs. On Tuesday, installation had started in the sitting area working toward the bedroom area where the joist changed direction. We had conversation about that and decided to glue in addition due to the joist direction change in that area. Installation did not happen in one day. It seemed like a few days. We were looking at stain colors by the weekend. Sanding went on a long time. Stain didn't start till the end of the next week around August 7 or 8. On the 8th, they turned the AC off temporarily for the first coat of poly. The stair guys were supposed to come Monday, August 10, so the last coat of Bona Traffic HD was put on Sunday night. The stair balusters/railings were installed Tuesday with a return trip on Wednesday, I think, so the floor guys didn't come back till the end of the week. Our furniture was in the garage covered in plastic. The weather was very hot and humid. On occasion, we got rain. We moved to our basement to live during this work. We were there about 3 weeks! I noticed the cupping the first week of September when the closet door was open and light was shining perpendicular to the direction of the boards in the bedroom area. Although we have differences in what's under the areas where the new wood is, we see cupping in the living room, the upstairs hallway, master closet and bedroom. Not sure about the sitting area in the master.

  • 6 years ago



    Here's the flooring as it sat in our living room to "acclimate".

  • PRO
    6 years ago

    Which region are you located in?

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    We're in Georgia, north of Atlanta.


  • 6 years ago

    Ask for the MC document. That's where you start. You will need to have a hygrometer in the garage during your data collection right now.


    Do you have photos of the garage and ceiling? How about the unfinished areas in the basement?


    G & S suggests the safest way to go with this: ask for an extended warranty from the flooring installers AND get them to do some MC recordings right now....to begin the problem solving that will go on for the next 12 months (which is going to be your Covid-project).


    J. Appelbaum thanked SJ McCarthy
  • 6 years ago
    last modified: 6 years ago

    Garage


    Door to unfinished room in basement


    Unfinished room under the living room.


    Also, the room under the kitchen was not finished for a number of years. We never had an issue there.

  • 6 years ago

    SJ McCarthy, Do I need hygrometers for both areas, or can I take one from one area to the next to get readings? Thank you!

  • 6 years ago

    It's your call but to be 'scientific' about it, you would have one for each room. They will all be 'calibrated' in the same room x 3 days (just to prove they all get the same reading). They will then be placed in each space and left for 1-2 days before you begin taking readings.


    You then take readings at the same time each day. You will also keep track of the outdoor humidity (weather report will do well enough) and you will also take readings from your home humidity unit.


    Do this for 1-2 weeks (the longer the better) and figure out the average. That's the beginning.

    The next set of data will come from the wood and the subfloor themselves. Which is where having the ORIGINAL MC documents in your possession. It these do not exist, you must create them. Which means a well calibrated wood moisture metre needs to be deployed.

    J. Appelbaum thanked SJ McCarthy
  • PRO
    6 years ago

    I suspect based on the timeline of the project July 27 - August 9, outdoor humidity is at peak (70-75%). It doesn't take long for indoor humidity to spike after turning off the A/C for 48 hours. The hot humid air stays trapped in the house for a period of time 70-100 hours before it is removed by the a/c, long enough to cause damage. Plus, we need to account for windows and doors that may have been left open during the installation and move-in period. Which causes a short term increase in RH.


    The best thing to do is to get the extended warranty and wait it out for changes. If, there is no leak and the RH is corrected and controlled. It will return to its original state. If not, but the condition is stable, a resanding will correct the problem. If, it gets worst, you have a active leak. The flooring needs to be removed and replaced.


    If, it is cold enough in your area, turn on the heat. If not, take advantage of cold weather fronts. It brings low humidity, so swapping the indoor air out will help if, the outdoor RH is lower than indoor's.


    The other possible causes if, there are no leaks. The installer installed over a wet subfloor or wet work was done over the floors.

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    What is that machine sitting on the floor in the first photo? A dehumidifier?

    J. Appelbaum thanked ci_lantro
  • 6 years ago
    last modified: 6 years ago

    This all makes so much sense and is so helpful with this very stressful situation. The machine in the bedroom is an air purifier. Thank you!!!!

  • 6 years ago
    last modified: 6 years ago

    Because the cupping is so spread out, I don't think the issue is a leak. I do think windows open and AC off at times could have contributed to what we have now. One of the workers stepped his foot through the garage ceiling in the bedroom where they were shaving the joist under the subfloor. That was fixed in the end, allowing the humidity to enter under the floor in that location throughout the job. That doesn't explain for the cupping issue elsewhere though.

  • PRO
    6 years ago

    Hot air rises.

    J. Appelbaum thanked G & S Floor Service
  • 6 years ago

    Wait! Whaaaat? "One of the workers stepped his foot through the garage ceiling in the bedroom where they were shaving the joist under the subfloor."


    Shaving the joists???? Why???


    Put a foot through the garage ceiling???


    Vapour barriers MUST be installed between outdoor and indoor living spaces. Do you have photos of the damage they made in the garage? Do you have photos of the 'in progress' work to put the ceiling back to code?

  • 6 years ago

    The Master bedroom extends the width of our house. There is an area where the joists switch direction between the sitting area and the bed area. That area has been an issue since the beginning where one side is higher than the other. You could see a lump in the carpet. We discussed options to correct that issue prior to laying the hardwood. They pulled the plywood subfloor and made some adjustments to balance the 2 areas. When the plywood was up one of the workers stepped through the ceiling of the garage. The damage fix was about 2' by about 18". They finished the plywood nail down in the room, but didn't correct the garage damage until the end of the job. I'm not sure what photos I have, but I think I could see the edges of the fix even now that they painted our entire garage ceiling. My guess is that they stuffed what was hanging out back in and finished the drywall. I saw insulation hanging down.

  • 6 years ago

    The plastic that *should have been in the ceiling of the garage (often just above the drywall of the ceiling) had to be patched as well. If there was NO plastic to begin with...then I guess we have our answer = no vapour barrier. *if that is the case (I am only guessing...someone will have to look in the garage ceiling to find out) then the garage ceiling has to come down, the vapour barrier applied (and sealed properly with tape...not just overlapping) and the ceiling rehung.


    This will be an 'add on' cost to you. The only reason the company had anything to do with the garage ceiling (I'm assuming here) is because of their inadvertent damage when a foot went through the ceiling. They were obligated to bring the ceiling/garage area back to 'original' condition. They were not obliged (assuming the garage ceiling was NOT part of your renovation) to do anything more than a patch/repair.

    J. Appelbaum thanked SJ McCarthy
  • 6 years ago

    Thinking about my "cupping" issue. The wood that was brought into my home in August when we had high humidity was stacked in a very large pile. If it was swollen and not acclimated, is it possible that the hight centers were sanded off leaving me with the now higher edges since the wood has acclimated?

  • 6 years ago

    No because wood just laying in bundles would not cup as it is free to move in any direction as there is nothing holding it in essentially one place.