Help navigating issue with past contractor

5 years ago

I'm hoping for some guidance from all of you with wayyy more experience with home renovations than me. My husband and I did a complete kitchen renovation in 2019. We used a general contractor who connected us to his preferred architect, but no designer. Toward the end of the project, we decided to take advantage of the fact that all the walls in the kitchen were open to rough in plumbing for a bathroom addition on the second floor that we planned to do down the road. The GC managed that work, though it was not captured in a change order or in the original contract. I'm not sure if the GC got a permit for this new plumbing work. He did get permits for the kitchen work. We just circled back around to the bathroom addition and brought in a new GC to take a look. He found that the rough-ed in plumbing was not to code (1/2" lines instead of 3/4"). Replacing the lines may very well require tearing up the ceiling of the kitchen and uninstalling a lot of expensive cabinetry, from what I understand. In addition to the expense, I'm afraid that this isn't possible without substantial risk of damage to the cabinets. This is what we were trying to avoid when we had the plumbing roughed in to begin with.


What I'm trying to get my head around is 1) what questions should I be getting answers to and 2) what recourse, if anything, do I have with the original GC? Basically, what would you do? Thank you in advance for any thoughts. I've used this forum to avoid learning lessons the hard way like this, but apparently I have much left to learn. I've cross-listed this in the Kitchen forum, too, since it lives at an intersection of sorts.

Comments (5)