Software
Houzz Logo Print
mlkonopa

Will I get through this?

5 years ago

They hung the upper cabinets too high, which really means they measured two inches too short. The pantry cabinets and the cabinet over the refrigerator were too short. The base cabinet was larger than I asked (I didn’t catch it when I approved the measurements.) I couldn’t remove a soffit which caused a whole slew of other issues: having to find new lights; the over cabinet molding running into window and door trim; having to halt production on my Roman shade and remeasure (delayed until they get molding finished). The company that was making my counter stools burned down. My designer miscounted cabinet pulls, then I switched out a couple long ones for short ones, so 3 times ordering pulls. The box for the sink and faucet were removed from my kitchen, but I have a box still with two bottom grids and two drains that are for a sink that isn’t mine (I should have a single bowl sink.) Now I’m panicking that the counter was cut for the wrong sink. That’s supposed to be installed tomorrow.

I’m supposed to be near the end of this project, but I’m really, really stressed. I’m doing all this while working from gone at a high stress job. And I’m sick to top it all off. Any advice or good thoughts to get me to the end of this project?

Comment (1)