In the final stetches of a remodel that started with a burst pipe in our Los angeles townhouse. We moved out for two weeks for floors to be replaced with white oak engineered wide plank that is taller than our prevoous floor and also has self leveler applied where there was previously none. Turns out some of the new stair treads dont clear the existing railing- something we didn’t realize in time to troubleshoot.

I was in consistent contact with the flooring contractor and the installer about all kinds of details and seeing photos of progression. However the installer didnt bring this issue to my attention and installed the solid stair treads with a notch to fit around the existing railings which did not clear the height of the new flooring.

We have already received agreement from our GC and the flooring sub that this is not acceptable work (everything else looks great throughoutit) and needs to be fixed, and that will happen next week. How to fix it is the question. Would obviously prefer a simple fix which does not involve tearing the whole living room’s new flooring and asjusting the height of the railings. Our GC has come up with the idea of redoing the bottom two stairs and finessing them to make each one a 1/4 inch shorter to clear the railing, so that a full tread can be installed. He thinks will not be noticable to the eye, or feel off while one is using the stairs. i also wonder about removing the bottom rail on both sides but that probably would look strage and may not be to code.

I would be so grateful if any pros have opinions on this situation or better ideas for a fix. Thank you!!!!






Comments (12)

  • 5 years ago

    Omg that is awful. sorry that happened to you

  • 5 years ago

    Is it possible to remove the bottom rail, instead, and (obviously) replace the notched stair treads? Not sure if a metalworker could do that and make it look good...

  • 5 years ago

    Emily, i was just adding that idea to my original post as I’m wondering the same! our GC has amazing subs so we could definitely get someone with quality work. Thank you!

  • PRO
    5 years ago

    I don't like your GC's idea. Stairs that aren't very consistent ruin your gait. Interrupted gait is dangerous. With his plan you're not going to have code-required tread nosing.


    The person specifying the "white oak engineered wide plank that is taller than our prevoous floor and also has self leveler applied where there was previously none" is on the hook here. You can't just raise the floor and not the railings.

  • 5 years ago

    Thanks, @Joseph Corlett, LLC Thank you for the reaponse (and the validation). i dont disagree with you but do you think it is if it’s possible to fix it without tearing up the floor — the railings are bolted to the subfloor.

  • PRO
    5 years ago

    My first question would be- is the rise and run currently consistent? Meaning if you measure from the floor to the first step and then step to step up the whole stair to the top is the height consistent all the way?

    Jenn Powers thanked HALLETT & Co.
  • 5 years ago

    I second Emily R's suggestion, just remove the bottom rail and install new treads. NEVER "finesse" the rise and run of stairs - that's a fall waiting to happen.

    Jenn Powers thanked chiflipper
  • 5 years ago

    @HALLETT & Co. We get home tomorrow and that’s first thing on my list Thank you!

  • PRO
    5 years ago

    Jenn:


    From a cost/benefit aspect, I'm inclined to agree with Emily.

    Jenn Powers thanked Joseph Corlett, LLC
  • 5 years ago

    UPDATE: our GC and floor sub both took total ownership for this mistake in the stair install and had the crew come out and totally rebuild the stairs so they now clear the railing. it looks much better. Thanks all for your input. i think this is definitely a confirmation on why it is essential to work with contractors who come with personal recommendations from people you trust.

    The unfortunate part is that the lack of attention to detail the install crew showed with the stairs has led us to find a ton of other issues with the detail and finish work throughout. pics attached of the other fun surprises we’ve found.






    Our sub has been having them make things right and they have so far fixed about 5 problem areas (including a landing that they initially ran in the wrong direction). However, the quality of the detail and finish work continues to be subpar so are now insisting on a different prrson so do the rest of the finish work, which our GC is again supportive of. someday, we will be done with this!

  • PRO
    5 years ago

    Thanks for updating, glad it’s being addressed.