Software
Houzz Logo Print
alexey_socha

Choosing between two open floor plans

5 years ago
last modified: 5 years ago

Which of these two floors do you prefer and why? Thank you

We would like to keep the square footage under 1750. We have decided against the oven so the nook will be removed from the first plan. The mudroom should be accessible from both the garage and the foyer as we live in a walkable area and will be using front door as often as the garage entrance. The elevator is just a placeholder and will be used as a closet for now.

P.S. We do not need neither a wood burning oven nor a wine room


Comments (56)

  • 5 years ago

    Just because the OP said offered us vs free for us doesn’t mean a thing.

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago
    last modified: 5 years ago

    I think the first one is better for a few reasons. The pantry uses interior space instead of exterior walls where windows can go. The kitchen will directly receive light from the two windows. The mudroom entrance is a bit closer to the front door. You don't have to walk through the foyer to get to it. The library/guest room is more private without the foyer entrance.

    If you have the option to make the garage wider, do so. The thing I don't like about either plan is that you need to travel through the entire house to take groceries into the kitchen.

    Alexey Socha thanked rrah
  • 5 years ago

    What I like about the first plan:

    1. The privacy for the guest room/study

    2. The location of the pantry

    3. Windows in the kitchen

    4. Nice foyer with the place for a console table

    What I do not like about the first plan

    1.The size of the pantry-too big

    2. The elevator is inside the living space

    3. Wasted space behind the foyer/next to the elevator

    4. The dining room is on the pathway to the kitchen.

    5. The dining room seems small and not cozy

    6. The nook behind the kitchen for the oven –we decided against the indoors oven

    6. The second floor was bad, here is the picture


  • 5 years ago

    An architect doesn't "offer" a plan. A good architect works with you to design a plan that meets YOUR needs. That may mean sitting down and doing preliminary sketches with you using paper and pencil before they even think about working in CAD design.

    Did you see any rough pencil sketches first or has everything been CAD?

    Alexey Socha thanked cpartist
  • 5 years ago

    We have not worked with an architect. before. the first meeting she listened what we want- not a big list - we have decided to be open minded to allow for the best design so the value does not suffer(in case we want to sell it- not that we intend to -but ...the life can be unpredictable ) she came up with the first plan. We gave her some feedback - she came up with the second. When we saw the second try- we panicked. In case you are wondering we paid 18K . If we were to go with an inhouse architect we would pay 0, Now we have to pay by hour and it is not clear whether we will ever get something sensible

  • 5 years ago

    Have you considered asking for a meeting with the architect to express how frustrated you are with where you are in the process and how Unheard you feel, how concerned you are that she will not get it by the next plan etc?

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago

    we have expressed our frustration to our manager in the hopes he will deliver her the message in the best possible way. also we are trying our best to improve our communication - now our list is getting very detailed and we will include many points made by posters here.

  • 5 years ago

    The plan has improved.


    I don't understand why you aren't speaking directly with the architect.


    My DH and I built a new home in a northern suburb of Chicago several years ago. Have you thought about speaking with the building department/community development/whatever-it's-called -- where you're building? They're generally glad to answer questions. They should know everything about your builder. Did you have an attorney approve whatever contract you signed with this builder/developer? I ask because you don't seem to be clear on the process here.

    Alexey Socha thanked chisue
  • 5 years ago

    We went through a process of carefully selecting the builder. We asked for references, looked at various projects, had a few meetings, etc. We do not have an attorney as we felt at this stage we don't need one. We had no reasons to panic until now as we thought the process is straightforward. It is our understanding that the relationship with the builder involves a fair share of trust. We will speak with the architect however we want to be as constructive as possible and that requires a fair share of learning about the floor plans and houses. We have full time jobs and a little kid -yes, we started the whole process somewhat unprepared

  • PRO
    5 years ago

    Was a "wood burning oven" or "wine room" in your list of needs you gave to the 'architect'? If you did not, she is wasting your time.

    Alexey Socha thanked Mark Bischak, Architect
  • 5 years ago

    Alexey don’t worry most people do! It’s all still salvageable. What is your contract with the architect like? What about the builder? You should be able to talk directly to the team anytime you want, within reason, to get on same page. Not a middle manager but the people who are actually doing the work!

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago
    last modified: 5 years ago

    We do not have an attorney as we felt at this stage we don't need one.

    That was your first falacy because a good lawyer would have pointed out any future problems. I STRONGLY suggest you get yourself a lawyer NOW so you can have him/her vet your contract and let you know your options now and going forward.

    I'm sorry I'm being so strong about this. My DH was a lawyer (retired general counsel for a Fortune 500 company). He would never have allowed us to build our house without us vetting our contracts with a lawyer who specialized in construction. Even with us doing so, we discovered our builder was not who we thought he was and we were glad we had retained a lawyer. And yes, we had vetted our builder from one end to the other.

    We had no reasons to panic until now as we thought the process is straightforward.

    You are plopping down 6 figures for one of the largest purchases in your life, so no, it's not straightforward.

    It is our understanding that the relationship with the builder involves a fair share of trust.

    Of course it does but it doesn't mean you get taken to the cleaners even before you have a finished plan. Do you know what happens if you start building and decide you don't like something and need to change it? That is why you have a construction lawyer look over your contract.

    And you're forgetting one important fact. The builder, no matter how good, is building a house to make a profit. He/she will do what works best for him.

    And again, we trusted our builder. You can read my 3 year saga by looking up Cpartist's Saga.

    We will speak with the architect however we want to be as constructive as possible and that requires a fair share of learning about the floor plans and houses. We have full time jobs and a little kid -yes, we started the whole process somewhat unprepared

    Honesty a quality architect would walk you through the process and help you along the way. As much as you need to trust the builder, you also need to really have trust in your architect.

    And as WestCoast just said, you shouldn't need to go through a middleman to talk to your architect!

    Alexey Socha thanked cpartist
  • 5 years ago
    last modified: 5 years ago

    We have not worked with an architect. before. the first meeting she listened what we want- not a big list - we have decided to be open minded to allow for the best design so the value does not suffer(in case we want to sell it- not that we intend to -but ...the life can be unpredictable ) she came up with the first plan. We gave her some feedback - she came up with the second.

    Sounds like the process is you all have a meeting... she comes back with a design....you all have a meeting.....she comes back with a design....you all have a meeting....etc.

    Have you tried having a three or four hour face to face design meeting where there's a highly interactive back and forth discussion over tracing paper involving overlay upon overlay? I do these all the time and they're very successful because everyone can float ideas and test them right there in real time.

    Talk to her about doing a session like that. If there's resistance, that would be a cause for concern for me. I've always thought that the best designers are not only fast on their feet, they don't always have to "go back to the shop" to do their designing.

    Alexey Socha thanked Architectrunnerguy
  • 5 years ago

    Well he just had a meeting with the architect. It was like 90 minutes and we did not get a chance to talk about all points as she brushed us off saying that she has a different meeting to go to. Basically she said she will think about all the points we mentioned and she will come back to us with a new plan.

  • 5 years ago

    That is unacceptable. It’s time to be crystal clear you are not happy, you have not been able to voice your concerns, you cannot let her make another plan yet if she doesn’t even know the issues. Document them all in an email and attach the plan to it clearly marking the issues. Demand another in person meeting and get this sorted out.

    You have not clarified what the contracts look like. What are the options for walking away? What have you paid so far?

  • PRO
    5 years ago
    last modified: 5 years ago

    I am with ARG on this one. Tell your designer the next meeting will be the second half of the third meeting (without additional cost) and she should block out at least four hours, or as much time as she feels necessary beyond that, to come up with a complete house design that meets all your needs and fits your site to your satisfaction. Do not end the meeting until the design is acceptable.

  • 5 years ago

    Well he just had a meeting with the architect. It was like 90 minutes and we did not get a chance to talk about all points as she brushed us off saying that she has a different meeting to go to. Basically she said she will think about all the points we mentioned and she will come back to us with a new plan.

    Again, you now absolutely need to meet with a construction lawyer and find out what your options are.

    Your architect (if she really is one. Have you checked her license with your state? Every architect MUST be licensed by their state.) What she is doing is not how a talented architect works. The whole reason you hire an architect is because your skills lie elsewhere. However from what I've seen so far is her skills must lie elsewhere too.

  • 5 years ago

    Honestly, I feel bad for you. You went into this trusting your builder and your architect and it seems they're not giving you their best or even their second best. I wonder if they figured "first time homebuilders!"

    Alexey Socha thanked cpartist
  • 5 years ago

    We’ve worked with two architects and are just now getting bids on our dream/“last” home. It was hugely frustrating, largely because they were not good listeners. My brother is working with an architect on a remodel and is having similar issues. I’ve literally drawn rooms on graph paper-including elevations-and tweaked more than I ever dreamed possible. One thing that was really helpful was assembling ideas in the idea book section of Houzz. It helped us figure out what we really wanted. Another was to get the architect to use BIMX software to “walk us through” the house design in 3D. Things look very different when you scale up the floor plan and see the walls, windows, etc.

    Alexey Socha thanked KDH Associates
  • 5 years ago

    @kholland63, we were trying to be flexible with what we want but now thanks to this discussion we have a list of what we do not want

  • 5 years ago

    @cpartist, we we are not first time home buyers, but we are first time homebuilders...how many people are building several houses for themselves anyways? and yes we are very dissapointed but it seems the architect will meet with us again without counting it as a try - fingers crossed.

  • 5 years ago

    Basically she said she will think about all the points we mentioned and she will come back to us with a new plan.


    You didn't respond here to the design session idea but did you at least float the idea of my suggestion of a creative design session to her.....not one where she brings in a completed design for your perusal??? I've suggested that before to folks here and one forumite wrote about it here We fit an architect into our budget and it was SO worth it! (gardenweb.com) There's an embedded link in there also outlining how they (or at least the way I do them) work.




    Alexey Socha thanked Architectrunnerguy
  • PRO
    5 years ago

    In my experience, the house designs that go through several reiterations turn out the best. Hopefully that doesn't say I don't listen, but conveys the need to work out the wrinkles in a design to get it to the point it needs to be. Hopefully any design presented to a client has nothing more than wrinkles. It helps A LOT to to work out the design with client and architect sitting at a table with pencil and paper and scale and cookies as ARG describes.

    Alexey Socha thanked Mark Bischak, Architect
  • 5 years ago

    In your other thread, you stated "the design is the second try and we only have three tries according to our agreement with the builder." Yet that you have paid her for her work, but "if we were to go with an inhouse architect we would pay 0."

    So this is not a traditional Owner-Architect-Contractor relationship, which is one where you contract separately with each, and the architect represents your interests. In your situation, the architect (apparently a different one that the builder usually uses) appears to be in a contract with the builder, and is limited by that in the services she provides. It does not seem you will get the back-n-forth with the architect. This explains the 3 tries, the blowing off of you, the 90 minute meeting between Contractor and Architect.

    I suspect that the modern design you want required this particular Contractor to use a different architect, and the designs she creates must be approved by the Contractor first, where he has a lot of input to fit your budget. So if you want to arrive at a house design you desire, it will require a discussion with the Contractor, which will of course implicitly involve money, and come to an understanding of how you can tweak this O-A-C relationship so you can participate in the Schematic Design phase.

    Alexey Socha thanked 3onthetree
  • PRO
    5 years ago
    last modified: 5 years ago

    Do not think of it as a forth try, think of it as part three of the first try. The forth try will never occur.

    Alexey Socha thanked Mark Bischak, Architect
  • 5 years ago
    last modified: 5 years ago

    It's not too late to consult an attorney to look at your contract and explain your rights -- and options. I'd also make an appointment to speak to people in the building department of the municipality where you want to build. They are familiar with projects and know local builders and architects. They will also be reviewing your plans and inspecting work as it's completed. (Please tell me you are not building where there are no rules and regs, in some unincorporated area where 'anything goes'.)


    Go to Illinois.gov and look for Professional Licence Lookup to check on this architect. Anyone with a degree in architecture can call herself an architect. Licensure is another whole step higher. For example, a municipal building department will not issue a building permit for plans that are not approved and stamped by a licensed architect. (Sometimes a licensed architect will have an arrangement to approve plans drawn by another person.)

    Alexey Socha thanked chisue
  • PRO
    5 years ago

    i like the layout of the second plan better. i like the set up of the kitchen and dining room and the living room on the other side as opposed to walking from the kitchen through the dining to the living room. just seems like a much smarter set up.

    Alexey Socha thanked Focal Point Hardware
  • 5 years ago

    @Focal Point Hardware, that what I asked for when I saw the first attempt. However the architect moved the pantry and added a wine room and made the kitchen less functional - :(


  • 5 years ago

    @Mark Bischak, Architect yes we made a list of things we do not like in this plan and in general and will not move to the next try until all the points will be addressed. I believe we got somewhat empowered by the whole discussion here

  • 5 years ago

    @3onthetree thank you for your comments, we now understand better the arrangement we have with the builder, yes you are right we did not want a version of a farmhouse the builder offers with inhouse architect and the builder brought in an outside architect. The concept design phase is limited to three designs which will be tweaked at the schematic phase. The builder company is represented by a manager who is present in all communications. Unfortunately he always says how awesome the proposed plans are and what a great job the architect does - so we feel like very difficult customers who are just wasting everyone's time:( In any case we were granted another round, in 2 weeks, the hope is we will get something good

  • 5 years ago

    @Architectrunnerguy yes, thank you, we suggested a session, and have it scheduled in 2 weeks. however we are afraid just like the previous times we will be rushed through and brushed off :(

  • 5 years ago

    @kholland63. I think our problems is -the architect does not communicated pros and cons of each change in the plan in response to our constraints and how she addresses them - so we can choose- we are flexible- but we are not experts and cannot think though everything ...these is no perfect plan but we can compromise. However what the architect and the manager (the representative of the builder ) do - they keep telling us how awesome these plans are so we feel apologetic by asking to change things and if we do not like the results of the changes- they keep telling us- but you asked for it ;( For example I asked to move the dining room behind the kitchen for a better flow...which resulted in an awkward kitchen and pantry placement, but apparently it is our fault as we "asked for it". It is kinda sad because instead of inspired and motivated -I feel embarrassed and frustrated.

  • 5 years ago

    From someone who is obsessive about floor plans: they are inserting pics of furnishings (I think someone called them cookies) to help you see how things will be laid out. Unless you are buying all new furniture, you may find it helpful to measure what you have and get them to size the cookies accordingly. Then measure things like space between those objects and walls, doorways, etc. to be sure you have the room you need for your favorite things and the way you want to live. Incidentally, Houzz has some great guides for things like kitchen layouts-how much space you need for your dishwasher when the door is open; etc. Keep coming back to the forums-I have gotten so much help here-especially honest critiques!

    Alexey Socha thanked KDH Associates
  • 5 years ago

    Replying to your comment to me: I totally get the pressure thing, but it’s your house and a huge investment! To get what I wanted, I had to get out graph paper, cut out my rooms and put them together like a puzzle. Not everyone will want to do that, and there are tons of popular floor plans that you can look at for free simply by looking over the websites of big builders in your area-every part of the country has them-and they have floor plans that will likely give you some great ideas. It’s hard to work from the perspective of knowing what you don’t like-your architect needs to know what you want, and getting that info from one’s head into theirs is a huge challenge.

  • 5 years ago

    I hope that the "manager" you refer to is an employee of the builder. If it is a sales associate, you will have difficulty having any concerns, whether it be during the design phase, construction, or closeout, brought to the attention of the builder. If it is a 3rd party brought in to manage client relations, like a Construction Manager stepping in on the front end of design to bring in Value Engineering, then you will probably continue to experience this pushback during design.

    Prior to your next meeting, I would suggest that you request, rather demand, that elevations, sections (at least a typical wall section), and some basic cladding materials be included. You can't get a sense of the whole design without them, and I would imagine you will have some critique of the elevations. It would be a shame to have to go through this same process to make changes to the elevations. Review your contract to determine when your other input is "scheduled," like during Design Development to review lighting, or whether you only see the final Construction Documents. This "schedule" may need tweaking, and with this builder there may be a cost associated with it.

    Your expectations during the next meeting, and it should be stated for them to hear, is that the builder is allowed to make money, but the architect's unfettered input is more valuable than trying to appease the builder first. That you are adamant about certain design attributes that affect how you will live in the house, but you are flexible and realistic enough to understand that the solution will have some compromise to it. So discussions involving changes to design should have as much input from the contractor's perspective to understand what limits they are placing (and can that "manager" represent that perspective).

    Look at the bright side, so many people have blinders on when using an architect to design to their heart's content, only to find out afterward it can't be built and is way above their budget. You are probably locked in this contractual arrangement, so try to navigate it to arrive at the best possible house for your situation.

    Alexey Socha thanked 3onthetree
  • 5 years ago

    I like the first plan better. Perhaps instead of that wood burning stove opt for one of those indoor/outdoor doublesided fireplaces for your patio?

    Alexey Socha thanked cobalty2004
  • 5 years ago

    You need to meet with the builder and the architect not a manager. Our builder had an assistant who helped with lots once we got rolling but not big things like major house design and budget. You absolutely need to speak to your team not through someone else.

    You’ve been asked several times and not replied in regards to what the contract states?

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago

    @WestCoast Hopeful, our contract says we paid for two revisions of the proposed plan at CAD stage and two revisions at the schematics stage. If we need more revisions we have to pay by hour..We are not refusing to pay but we have already paid for 90 hours and ended up with what I am showing

  • 5 years ago

    @cobalty2004, why do you like the first one better? we have decided against the wood burning oven inside the house, we will put one outside

  • 5 years ago

    I meant what does your contract say in general with the architect about communication, ending the arrangement etc. how much have you paid so far? I assume you have a contract with builder separate from architect

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago

    @WestCoast Hopeful here is, verbatim from the contract with the builder (we do not have a contract with the architect ) SERVICES. The Services shall consist of designing and drafting schematic drawings (the “Plans”) for a

    single-family residence with a custom modern elevation based on the Project Outline below. The Owner acknowledges that they will be provided two (2) design consultations with the Contractor (including the first consultation held prior to entering into this Agreement) and two (2) revisions to the Plans.

  • 5 years ago

    Oh wow that’s not great to be honest. Custom modern elevation reads as unique outside to me but likely a canned floor plan. Hence the push back you may be getting

    Alexey Socha thanked WestCoast Hopeful
  • 5 years ago

    @WestCoast Hopeful, our contract says we paid for two revisions of the proposed plan at CAD stage and two revisions at the schematics stage. If we need more revisions we have to pay by hour..We are not refusing to pay but we have already paid for 90 hours and ended up with what I am showing

    Before you saw CAD versions did you see hand drawn possibilities? CAD is step 5, not step 1 in creating a house design.

    We are not refusing to pay but we have already paid for 90 hours and ended up with what I am showing

    90 hours? Ask them to document how they came to 90 hours of design.

    @WestCoast Hopeful here is, verbatim from the contract with the builder (we do not have a contract with the architect ) SERVICES. The Services shall consist of designing and drafting schematic drawings (the “Plans”) for a

    single-family residence with a custom modern elevation based on the Project Outline below. The Owner acknowledges that they will be provided two (2) design consultations with the Contractor (including the first consultation held prior to entering into this Agreement) and two (2) revisions to the Plans.

    You NEED A CONSTRUCTION LAWYER YESTERDAY!

    And where does it say your architect is an architect? Do you have a link to her website? Does it literally say she's an architect?

    Alexey Socha thanked cpartist
  • PRO
    5 years ago

    If you don't need the wine room, so take that out and make the kitchen more functional. no?>

    Alexey Socha thanked Focal Point Hardware
  • 5 years ago

    A design consultant could be anyone. However, that's what you've signed up for, so I hope you can become more insistent. YOU have paid for plans YOU approve. You are not being at all unreasonable. (I'd be taking notes of your meetings with these people to illustrate where your concerns are being disregarded.)


    How long has it been since you signed this contact? Are other homes under construction? Have you spoken with other people building here, or who have used this builder in other locations? Is this a national concern or a local builder? Where are their projects located in the Chicago area?

    Alexey Socha thanked chisue
  • 5 years ago

    @Architectrunnerguy, thank you, I got it now. We have requested the working session - now that we know how it is supposed to be we feel more confident to demand better services.

  • 4 years ago

    @Architectrunnerguy, thank you, I got it now. We have requested the working session - now that we know how it is supposed to be we feel more confident to demand better services.


    That's great! And let us know how it goes!

  • 4 years ago

    Please let us know how it goes for you. Best of luck

  • 4 years ago

    @cpartist we have decided to do more research by touring more houses and reading over christmas holidays