Renovation Final Walkthrough Timing?

4 years ago

Greetings,

We are currently undergoing a kitchen and bathroom renovation. While the both jobs are almost complete there are still a number of outstanding items on our punch list

- shower encloser needs to be hung (encloser won't be ready for a month or so)

- towel racks and toilet paper holders need to be installed

- cabinets in both rooms need to be adjusted

- missing one countertop that needs to be installed

- repair work on ceilings from support braces that were placed during renovation

- cabinet molding still needs to be completed in kitchen (only half that cabinets have top molding)

- two cabinet doors still need to be installed

- there is a gap between the oven and the wall that we would like closed

- missing hardwear on another cabinet door

- paint touchups in both rooms


Our GC wants to schedule a final walkthrough prior to this work being complete since he maintains that all this can be completed in a day. Is it standard practice to do the walk through this early? Should we be expected to provide final payment before these things are taken care of? Our GC wants to schedule the walkthrough for this week even though the work won't be complete for at least another month.

Comments (5)

  • PRO
    4 years ago

    Most contracts use the term "substantial completion" for the final progress payment, less a minor amount as a holdback. If all of the materials are on hand to do all of that, that would qualify as being "substantially" complete. If you are waiting on materials, that's a big unknown in this day and age! However, "1 day" is being optimistic for all of that to be complete. Different trades are not going to walk all over each other like it's a This Old House filming deadline. You've got a week's worth of work there.


    If there is a "holdback" amount, aside from the last payment, that's fine. If that minor holdback is not mentioned, offer the payment for when 90% of the list is done. If it only takes a day, as he is saying, he will be in good shape. If it takes 2 weeks, then, it takes 2 weeks.

    S Starkey thanked User
  • PRO
    4 years ago

    "Should we be expected to provide final payment before these things are taken care of?"


    He can expect anything he pleases, but that stuff will virtually never get completed unless you're sitting on his money. How much is it going to cost you to get all this done if he never returns? That's how much you sit on.


    If your remodel was $100,000.00 and you sit on $5,000.00, that's 5% retainage which is completey reasonable for a final final.

    S Starkey thanked Joseph Corlett, LLC
  • 4 years ago

    It sounds to me like you can’t use your shower (missing enclosure) and can’t use all of kitchen (missing countertop). i am no expert but sounds premature for final walkthrough. if he can do all of the other things in a day i would happily do it after that day…

    S Starkey thanked lharpie
  • PRO
    4 years ago

    My girlfriend hired one of my best friends to provide and install two Eurowall windows and a door. The 50K + job went fairly smoothly, however, my friend's secretary dropped the ball on the permit. My friend was forced to choose between installing without a permit or leaving temporary walls up while one of the worst hurricanes in Florida history was on its way. He decided to take his chances with inspection; a wise move.


    He wanted a progress payment after the windows and doors went in per the contract, however, I advised my girlfriend to not make the payment, contract be damned, until the permit was issued and approved. The permit was issued and approved, and the payment was made.


    The final payment is due, however, the screw hole covers for the doors haven't been installed. Again, I advised my girlfriend to not make the final payment until they are. She's sitting on over 10% of the job over a hundred dollars worth of material and ten minutes of labor.


    This is the advice I'm giving to my girlfriend about a guy with a stellar reputation and whom I've been friends with for over 50 years. I'm closer to him than my own brother, but business is business.


    He's lucky; he'll get all his money. I had a sink replacement customer that took three attempts to get her job done; some my fault, some not. She arbitrarily took $500.00 off her bill. I'll smile, cash her check, and thank her for her patience. Business is business.

    S Starkey thanked Joseph Corlett, LLC
  • 4 years ago

    Your list looks like it will involve a few different trades. I would definitely withhold the final bit until it's totally done. Our punch list completion is going on four months because our design/build firm is having trouble scheduling the trades to pop by for these small items. We did a walk-through right after we moved back in, and then made a detailed punch list. It seems a bit early in your project for a final walk-through, but I've only done one major remodel so that's all I can go off of. Good luck! Persevere! :)

    S Starkey thanked stiley