Software
Houzz Logo Print
luvkaya1189

Correct order of projects

3 years ago
last modified: 3 years ago

Hello!

I could really use your expertise on how to proceed with different projects I would like to tackle. Unfortunately, I cannot do them all at the same time but having trouble committing on what to do first:

-Install recessed lighting

-Remove popcorn ceiling

-Remove carpet and install hardwoods and radiant heat

-Install moulding and chair rails

-Paint entire home

-Replace dishwasher

-Replace washer and dryer and install butcher block over them

Comments (14)

  • 3 years ago

    What is the time frame you are looking at to do all of these? Is this DIY or are you hiring out? Paint entire home, interior or exterior? Do your current dishwasher, washer and dryer all work sufficiently?

    luvkaya1189 thanked millworkman
  • 3 years ago

    @millworkman None of these are DIY. My timeframe is unlimited because i am in no rush, lol. I will be hiring out for all these projects at different times. These are all interior only projects. After these are done, I will move to the outside.

    The appliances I want to replace, the dishwasher is leaking and the dryer takes forever.

  • 3 years ago

    Remove popcorn after testing to make sure there’s no lead. Remove old flooring. Unless you’re a licensed electrician, have recessed lighting installed by a professional. Start there.

  • PRO
    3 years ago

    My advice is to remove the popcorn ceiling before installing recessed lighting.

  • 3 years ago

    I wouldn’t want to risk damaging the new floors with leaks so before I did anything with the floors I would get in a new DW and make sure it worked properly


    i would remove the popcorn ceiling before my floors went in if I could arrange it bc it makes a mess, but it’s not a huge deal


    For me the flooring would overall be the biggest priority and could have lots of details/additional costs like new new baseboards, etc so I would tackle that next - you prob will need to be gone for part of it so make sure that could work for you


    here’s the order for how I would tackle the rest

    add ceiling lighting

    add trim, chair rail etc -

    paint ceiling and remainder of house

    washer/dryer - lots of horror stories about new WD‘s not being set up correctly and ruining floors so make sure to be there during the first load or two to protect your lovely new floors :)



  • 3 years ago


    " Remove popcorn ceiling "


    Removing the entire ceiling or having the popcorn scraped/removed off of the ceiling?


    How long after the ceiling do you anticipate removing the carpet? I would not want to remove popcorn over with carpeting even with drop clothes.

  • PRO
    3 years ago

    I think I need more info as to time line. The carpet to me comes out before the popcorn andof course the testing for asbestos first.. Are you planning on living in the space while all this work is done ? Are you plannong a kitchen redo? IMO you need an Interior designer and a good contractor before planning anything.

  • 3 years ago

    @millworkman I am going to hire someone to scrape/remove the popcorn celing and repair what is left.

  • 3 years ago
    last modified: 3 years ago

    @patricia colwell consulting there is no time line. Time is not a factor. I am not doing a kitchen redo. The new hardwoods will go in the kitchen. I am only replacing mentioned appliances and adding a butcher block over the washer and dryer. Yes, I will be living here with each project.

  • 3 years ago

    Have the dryer exhaust duct inspected and cleaned immediately. If it takes forever to dry, the duct is probably blocked and could be a fire hazard.


    Then replace the broken dishwasher.


    Then get the popcorn ceiling tested for asbestos. The test runs about $50 in my area. If there's asbestos, the mess associated with removing it will affect carpeting, paint, and making holes in the ceiling for pot lights.

  • 3 years ago
    last modified: 3 years ago

    Budget will most likely drive your decisions. Get quotes so you know what is possible and when. Prioritize based on your immediate needs, ie: dishwasher is leaking.

    Combine projects and tackle in a logical order:

    - carpet and popcorn removal/ceiling repair and recessed lighting

    - decision on location for radiant heating and installing new flooring

    - painting an entire home (assume interior?) will be a huge investment. Consider painting the most important rooms first.

    - I’d hold off on moldings/chair rails as you may not want or decide on a different application. Save your money and put into laundry needs.

  • 3 years ago

    @apple_pie_order no asbestos. That was already verified.

  • 3 years ago

    Thank you to everyone that responded. This has been helpful to move forward.