timing of projects

3 months ago

I have a number of projects but I’m not sure what needs to be done first. Old carpeting must be replaced with LVT in two bedrooms and hallway. Both bedrooms need bathroom remodel with tile floors in those areas. A door needs to be added to separate the bathroom area from the main bedroom. Currently there is no door separating vanity area from bedroom and there is carpet in the vanity area. Toilet and shower are separate from vanity area by a door that needs to be removed

Comments (4)

  • 3 months ago

    Google AI overview A residential remodeling timeline generally spans anywhere from 4 weeks for a single-room update to over 12 months for a major addition or full gut. It strictly divides into 3 core phases: Planning & Design (2–4 months), Permitting & Procurement (1–3 months), and Active Construction (varies). [1, 2, 3, 4, 5]A typical residential build proceeds in the following sequential order:1. Planning & Pre-Construction

    • Scope & Design: Homeowners collaborate with architects or design-build firms to establish the vision and draw floor plans. Takes 1 to 4 months.
    • Bidding & Contractor Selection: Vetting builders and finalizing the budget takes 2 to 6 weeks. [1, 2, 3, 4, 5]

    2. Permitting & Ordering Materials

    • Permits: Plans are submitted to the local building department. In areas with strict regulations, this process can take anywhere from a few weeks to several months.
    • Procurement: Long-lead items, such as custom cabinetry or specialty fixtures, are ordered. [1, 2, 3, 4, 5]

    3. Active Construction

    • Demolition & Site Prep: Clearing the designated space of existing structures and protecting untouched areas.
    • Structural Work & Framing: Altering load-bearing walls, pouring concrete (if an addition), or modifying roof lines.
    • Rough-ins: Installation of concealed systems—plumbing, electrical, and HVAC.
    • Insulation & Drywall: Hanging sheetrock, taping, mudding, and sanding.
    • Interior Finishes: Painting, installing trim and doors, and laying down flooring.
    • Fixtures & Final Touches: Setting plumbing fixtures, lighting, cabinet hardware, and appliance installation. [1, 2, 3, 4]

    4. Closeout & Handover

    • Punch List: The contractor and homeowner walk the site to identify minor imperfections or incomplete tasks that require fixing.
    • Final Inspections: Final sign-offs from local municipal code inspectors ensure the work meets all building codes.
  • 3 months ago

    Have you asked your contractor? Or are you doing projects one at a time on your own?

  • PRO
    3 months ago

    Are you doing two baths or three?

    What is your budget? When you say "remodel" how extensive?

    Will plumbing move, or will all remain in place, and you will do a cosmetic improvement

    Your post reads as though you have an eighties home, with a primary suite and two other baths.

    You do baths FIRST, as that will be the messiest of all. LVP to replace carpet, is not a huge mess, but would follow baths.

    Budget often drives how much you do and the timing. Why don't you add pictures to your post.......and an idea of what you want in the baths with inspo pics

    We'll assume you are not diy ?

  • PRO
    3 months ago

    Mystery meat without a to scale floor plan showing all windows, doorways where those lead. Every measurement clearly marked posted here in a comment in jpeg format As for what coes first #1 a good plan before anything else. At the same we need info about your family, some clue as to budget too. Remodel can mean many things . Are these the only areas you need to remodel???