My builder uses Houzz Pro to plan the timeline and give detailed estimates and daily updates with photos of progress, and provide invoices at pre-agreed key points in the build. This made the whole experience much more efficient and stress-free.
The shower controls are mounted on the opposite wall from the shower head. “So you don’t have to get wet when you turn the shower on
Q
Photo
A tiled-in linear drain was a necessary detail because of the way the floor joists run. “But it also makes the shower floor feel continuous, not broken up by a round or square drain,” Myers says.
Cheaper, but nice, way to add our bathroom to LL. Shower stall with mosaic tile floor. Simple, unfinished ceiling painted white.
Q