
Cemet Tile Install
Transitional Kitchen, Austin
This condo had a pre-selected finish schedule which was a little too masculine for our female client.
We first removed the two small cabinets on either side of the range top. We also changed the black granite to white quartz stone.
The cement tile from POPHAM Design was hand painted and shipped from Italy.
Our client is very pleased! As are we!
FYI: No 2 sides of the tile were the same. So it took a few minutes to figure out how to lay it. Once that was sorted, it was just putting it in place so that it fits on the wall.

Other Photos in Cemet Tile Install
