Search results for "Bündig" in Home Design Ideas

Photos by Jill Hughes
Three different renovations/remodels for the same client. All three showcased in one album.
Example of a mid-sized minimalist master black tile and ceramic tile ceramic tile tub/shower combo design in Baltimore with recessed-panel cabinets, medium tone wood cabinets, a one-piece toilet, blue walls, an undermount sink and granite countertops
Example of a mid-sized minimalist master black tile and ceramic tile ceramic tile tub/shower combo design in Baltimore with recessed-panel cabinets, medium tone wood cabinets, a one-piece toilet, blue walls, an undermount sink and granite countertops
Find the right local pro for your project

Photographer - Ryan Southen
Example of a minimalist straight metal railing staircase design
Example of a minimalist straight metal railing staircase design

Design ideas for a contemporary drought-tolerant and full sun backyard stone landscaping in Melbourne for fall.

Master Bath Shower Fixture
Small elegant master white tile and ceramic tile ceramic tile and white floor alcove shower photo with white walls
Small elegant master white tile and ceramic tile ceramic tile and white floor alcove shower photo with white walls

Over 700 Echeveria and Sempervium were arranged to echo the fountain design. A soft color palate created a calming environment.
Design ideas for a mid-sized craftsman drought-tolerant and full sun backyard landscaping in San Diego.
Design ideas for a mid-sized craftsman drought-tolerant and full sun backyard landscaping in San Diego.

Jerome DeMarco ART.chitecture
Inspiration for a mid-sized contemporary home design remodel in Portland
Inspiration for a mid-sized contemporary home design remodel in Portland

In this project we added 600 sqft addition to the house that include dining room, master bedroom with full bathroom and closet, laundry room and kitchen pantry. We also installed a new central air conditioning throughout the house and we also did the architectural/engineering process along with plans and permit process. from the demolition to the end of the project, it took us 4 months to completion.
72












