
Starting Point
Contemporary, Boston
Although this home already had a deck in place, the look and required maintenance of the structure spurred our clients to make a change. The severely compromised structure was carefully separated from the foundation, demolished, and recycled off site. With a fresh blank slate excavation work could begin for the wall and patio areas.

