Excellent quality work by D. Wade Construction and subcontractor David Harvey (owner of Red Rock Flooring). Doug Wade oversaw the entire remodeling of a home that was in good structural shape but very dated in décor, replacing the wall to wall carpeting with engineered hardwood, putting in a completely new kitchen including all new appliances and replacing tile with granite throughout, converting a workshop into an art studio, replacing the old central air (and ductwork) with a quiet and efficient system, completely remodeling three bathrooms, re-painting and installing new carpet in 3 bedrooms, upgrading the fireplace and adjoining walls with stacked stone and travertine, and improving lighting including installing five ceiling fans and bringing numerous electrical features up to modern code. He also did some work on the exterior, repairing wood rot and repainting the extensive deck. The cost was higher than expected and there were some over-runs, some of which was due to my decision to expand scope of work after the project started, but some of which was due to overly optimistic estimates by Doug and a few surprises that were encountered once work commenced. There were some problems with the quality of the work by the painting subcontractor selected by Doug, so he had to have that work re-done.
One unique requirement of the project was that we had Doug paint and re-purpose the old kitchen cabinetry for use elsewhere in the home, such as the laundry room, garage, and studio. The work took longer than anticipated but the final result was outstanding and exceeded expectations.