Bill Holland rescued our home remodel project. We knew we were embarking on a big renovation, but we didn't have a budget to match. We therefore started out by choosing a very affordable architect, figuring we'd control costs from the get-go. Big mistake.
After multiple go-rounds with our first team, we felt uninspired, uninterested, and unprepared to get our project off the ground. Add to that our concerns surrounding dealing with the City Planning office and we felt like we were marching inexorably toward a cliche home remodel disaster story.
Enter Bill. From the outset, his experience and know-how were palpable. He listened very patiently and carefully to all our objectives for the project, never pointed a finger at our previous team, and then disappeared with a promise to come back with some synthesis of what we'd described to him.
How impressed we were! His initial vision was clear, incorporated what we'd hoped to see, and achievable within the constraints of budget and the City rules. He thought through every aspect of the project, from the location of the stairs to the flow of the rooms to the design of our ceiling. Most importantly, his plans were infused with his own knowledge and experience, they didn't just consist of our own ideas bounced back to us.
We ended up choosing from the various potential layouts that he offered in a modular fashion, putting together a synthesized whole that we really love. And this is where the practical aspect of his experience became evident: he got us through design review and building permitting in under 6 weeks, and without any significant concerns/revisions from the City (a monumental achievement in Piedmont).
To offer a balanced review, I feel compelled to also include a drawback. Bill does his drawings in Photoshop, not in Autocad. This did present a bit of a problem when interfacing with the structural engineer, although I don't fault Bill for sticking to his chosen medium. Also, Bill isn't cheap...but then, as we learned, with him you get what you pay for! Plus, the amount of time and money saved by putting together a good design from the beginning (avoiding multiple City reviews, construction snafus, and revision once building has started) MORE than made up for his fee. One example: the staircase, as drawn by our initial architects, wouldn't actually have fit in the location that they specified. It was off by a few inches, but Bill picked this up, and saved us goodness-knows how much in redesign/rebuild costs. Bill always met the deadlines that he specified, was easily reachable by phone when necessary, and displayed quite a bit of patience in talking a couple of newbies through a huge project.
Our project is now complete, and we are living in the beautiful space that Bill designed. He will always be welcome in our home and we appreciate him every time we walk in the front door (ie every day).
13 Comments