Rion Cold Weather Assembly

17 years ago

OK.......I can't it anymore. My base in finished and I want to start the assembly of the greenhouse. There are a few day in the forecast that are going to be sunny and 40 degrees. So I am thinking of starting the process.

My question is has anyone assembled thier rion greenhouse when the weather has been cold? I will have some warm soapy water on hand just so everything slides together smoothly without any damage.

Am I nuts?

Comments (5)

  • 17 years ago

    No, you aren't nuts, just impatient. Calculate the time it will take to assemble and seal it before you start, then double it.

    Then wait for weather that will give you the time to assemble the parts, erect the GH and not be forced to quit in the middle of running silicone sealant, because of a sudden cold snap.

    Or: Lay in a large enough tarp to cover the entire GH, so if you are forced to stop for weather, you can protect the unsealed parts from the minute airbore debris that can get blown into the tiniest seam and prevent sealant from completely filling it.

  • 17 years ago

    I assembled my HFGH 10x12 last winter and it was below freezing the entire time. It was worth freezing my buns off! ;-)

  • 17 years ago

    I suspect installing all that weather stripping around the wall panels will give you the most grief in cold weather. I suspect the next most difficult task will be getting those #%¢@* so-called glazing elements installed on the roof. Both are a pain when the weather is nice. If you have a garage or den with an 8 ft. wide door opening, you could assemble the top inside, then carry it out and install it on the wall assembly. If you have a way to haul it home, I think it would be worth it to assemble the roof in a neighbor's garage, a corner of a warehouse, or whatever you can get so as to have a warm place to do it. If you canÂt do any of that, you could at least assemble the roof pediments and doors inside your house. ItÂs a fairly clean job.

  • 17 years ago

    I could assemble the roof at work and and haul it home in my dump truck. That a good idea. The glazing is what I was worried about the most.

    Well I have a bunch of vacation time so if I see a weeks worth of good weather I think I will go for it.

    Thanks all

  • 17 years ago

    Well...mission accomplished. The greenhouse is finished and all was done with weather below 40 degrees. The roof elements was the most challenging. A heat gun was need to make things just pliable enough. The weather stripping around the walls went very easy. The door seals also went well.

    I used some expanding foam insulation for all those air gaps. It worked perfect. The doors need just a bit of TLC. As others have said the doors are a weak link. I have the new style brackets and the biggest problem is the bottom edges. The weather stripping needs some coaxing to make a good seal. I will add a dead bolt on the out side to give more strength to the other door.

    The remaining projects are floor, electricity, and heat.