Software
Houzz Logo Print
chevalrose

Above-ground pool cleanup

12 years ago

We moved into a new home that previously had an above ground pool. We'd like to build raised beds in this area now. It's currently crushed stone mixed with sand about 12" thick. Is this okay to have under a 16" raised bed? I was thinking it might be better to dig down another 8" and fill it with loam, but I'd also like to be as frugal as possible. Would it even be okay to try to rototill the sand/stone mixture and put the raised bed on that rather than dig and fill with loam?

Thanks

Comments (2)