I think this is my first post here but over past 2 yrs have gathered much useful info from this site. We are in the process of building a home with a contractor on a cost-plus contract.
We've run into a bit of a snag and I need some straight-talk advice from people who have "been there". Our builder has passed off a few previously installed items (like french doors from a previous project) on us. When I mentioned it he said he gave us a discount. Not worth getting upset over, I figured.
This last one is beyond reasonable practice, for my taste anyway. He has had an 'open-box' but new tub from a previous project in our garage for a few months. He planned to use it in one of our bathrooms. When it came time to install it, he realized it was a left instead of right hand drain. It was useless to us. Piecing things together after the fact on my own, it seems with final rough inspection pending, he needed a tub pronto. Lead time for the tub was about 4 wks. So he obtainded and installed a similar but smaller tub with a 6 inch long tear in the the crease where the flange meets the tub. I brought this defect to his attention. He said it could be patched. I said I don't want a patched tub in my new home, thank you. I expect a new tub since thats what I paid for. He said the installer would blame the supplier and vice versa. I said not my problem - and that I'll ask them about it. So he fessed up saying that he was just trying to save me money ($120). I said you needed a tub quick (he's getting behind), so you took what was available and tried to pass it off on us. How could I call into question his integrity blah blah blah. Should I accept this damaged tub? I'm not sure it can be patched without the risk of future leak. At this point, I've accused them of trying to install a damaged product, not telling me about it, and charging me full price. I wasn't told about the small discount until after I had caught the damage. The builder and supplier both say it can be patched good as new. They had no plans to have that done until I brought up the fact that it was damaged (with tile installed and silicone bead at the crease you might not see the tear). Am I the one being unreasonable? To summarize, I was deceived, then lied to, then lied to about being lied to. We're only half-way done with this project and I need them to be working in my interest. Any suggestions on making this right? It's not the $550 tub that has me so upset.
sniffdog
charliedawg
Related Professionals
California Architects & Building Designers · Elizabeth City Architects & Building Designers · Kearney Architects & Building Designers · Montgomery Design-Build Firms · Zanesville Design-Build Firms · Burlington Design-Build Firms · Brooklyn Design-Build Firms · Murrieta Design-Build Firms · Lubbock Design-Build Firms · Cape Girardeau Home Builders · San Marcos Home Builders · Martinsburg Home Builders · Enfield Home Builders · Orange County Home Builders · Cody Home Buildersbdpeck-charlotte
blindstar
sierraeast
amyks
mightyanvil
solie
meldy_nva
jicfellowsOriginal Author
stinkytiger
lazypup
kdnyc
eventhecatisaboy
kren_pa