remodel- how long did it take?

18 years ago

I 've been following a lot of progress here, and it started me thinking.

how long did your bath remodel take? we are planning at some point to remodel our masterbath. It's a good size room, roughtly 12 by 15 I would guess. It's got a jacuzzi, separate shower, 2 vanities and sinks with that "dressing table" bridge in teh middle. We would like to update it nicely (pretty much everything, but not really changing much in terms of footprints). I know this would vary considerably, but assuming we are not looking to do the be all and end all bathroom statement, what is a good realistic time frame to expect? would 2 weeks be possible or really pushing it? (and we are not capable of diy so it would mean having a gc )

Comments (17)

  • 18 years ago

    My bathroom was only 5X9 or so...it was completely gutted and every new added. We also had a GC. It was 5-6 weeks from start to finish. I don't think 2 weeks would be possible. Actually we figured out the man hours on ours and it was 200 man hours. Sometimes more than one man at a time was working, so that would cut down on the total days and weeks, but there is really alot of work to be done in a bathroom and some things need time to dry, etc that holds up the schedule.
    I will be interested to see what others say. We have another bathroom to be remodeled this fall.

  • 18 years ago

    Our master bathroom sounds very similar to what you've described and our recent remodel using a GC took two months (although the last couple of weeks we were simply waiting on the frameless glass shower door). We did gut the room and replace everything, but the layout was kept the same. I think two weeks sounds a bit optimistic.

  • 18 years ago

    My bathroom is an L shape 10 x 20 on the long sides. We swapped the shower and tub around. Everything was already gutted to the concrete block walls when the contractor started. It has been since May 1st, so 2 months and a week so far. The tile is halfway and we are still waiting to do the contertop, sinks, faucets, toilet, and shower glass. The doors are a work in progress. (our contractor found the world's ugliest door and installed it last week).
    I expect at least 3 more weeks before it is turned over to us, so that will make 3 months. Our contractor says one more week, but I have learned to multiply his estimates by a factor of 3 or 4.

  • 18 years ago

    6X9 bathroom, gutted to the studs, except for sheetrock left on 2 of the walls. Old house, 200 years old, so the floor had to be leveled (1 1/2 " difference from one side of the room to the other) New tub, toilet, vanity, granite, fixtures, new porcelain tile with radiant heat, new vent/heat in the ceiling, tile in shower surround (tub) etc. Carpenter and 2 helpers, took 2 1/2 days, plumber and electrian working at the same time intermittently.
    Tile people will take 4 days. Carpenter back one more. We are going to paint it.
    2 weeks tops all together. 3 to 4 months seems outrageous. Heck, 1 month seems outrageous, unless they only come a couple of days a week.

  • 18 years ago

    A couple of days a week? On average, the guys are here 2 to 3 days a week no more than 6 hours a day. I would be happy to get 20 hours of work a week. Two trades working at the same time would be amazing.
    But this is Florida and it is beach weather.
    If there was a chance of these guys freezing to death because they had no money, they might work harder.

  • 18 years ago

    We gutted our bathroom the monday after thanksgiving and it's still not done. Part of that is due to trouble with the trades. Our first plumber disappeared for 6 weeks and when he finally came back he did things sloppy and not to code so we had to find a new plumber to come in and rip out some of the old plumber's rough and redo it. Then the whole tile guy saga which I won't go into but needless to say it took more than 3 months to get the tile done. Ugh.

    We're still not done but now I'm the holdup - we have a new baby (our first) and I haven't gotten the template to the soapstone people. Once that is done we can pretty much get the rest of the bathroom done.

    It was a complete gut in a 120 year old house and it's a huge bathroom (to me for our modest 1900 sf house - about 10x11) and we had serious out of level and plumb issues as well, as well as moving the shower, tub, adding a second sink. The toilet stayed the same as did one of the sinks. We ran a completely new line up for the radiator while we were doing a boiler upgrade and zoning our house too. Overall I'd say it's been a fairly complicated remodel but not "longer than it takes to make a human being" complicated :-p.

  • 18 years ago

    What you have to figure into the equation as well, is the decision-making and shopping. If you have EVERYTHING designed ahead of time, purchased and waiting in your garage for the workers, you could get it done in a few weeks. Lord willing and the creek don't rise. If you are choosing tile, fixtures, paint, etc. as the work is being done, it could take longer. Things are backordered, broken in transit...whatever.

    Then there are the unexpected things...our exhaust fan was stolen off the delivery truck, and the shipping company "forgot" to notify us or the shipper. Another one was shipped immediately when we discovered this, but meanwhile, an inspection had to be canceled and rescheduled, and we lost a week. That was minor, but those things happen. Our GC had a family emergency and had to leave town -- another week lost, but he's a good guy and we were okay with waiting.

    Right now our master bath is on hold because our granite fabricator is backed up a couple of weeks. Tile guy can't finish until the granite shelves are here...etc.

  • 18 years ago

    I was asking because I have heard all sorts of time spans and was curious to know what others have endured. My hope would be to have pretty much everything ordered/selected (maybe even onsite if possible) to curtail those headaches.
    So I guess 2 weeks would be possible but not very probable at all.(realistically speaking. oh well.)

  • 18 years ago

    I guess you don't want to hear my answer lol

    18 months and counting...

  • 18 years ago

    Wow, I guess I lucked out! Of course, the tile people haven't come yet, but they promise 4 days....fingers crossed.
    If you count in the research and decision days, add a year to my 2 weeks.
    I don't decide stuff like this quickly, but while I'm doing the research and deciding, our old bathroom is intact.
    Maybe cause this is our only bathroom...they are being efficient.
    Good thing we have 9 acres, plenty of 'bathroom' places when the toilet is out.
    AND it's summer in the Northeast!
    We take showers outside....We have really long hoses to reach our garden and when the hoses lay out in the sun, the water gets real hot. We have a 'wand' (whatever it's called) on the end of the hose with a shower head that is variable. The turn-on knob is near the hose connection. I tied the wand to a 2x4 on the wood shed behind the garage and the shower head is above my head and we shower there!! (I use my bathsuit, DH au naturale) (No other houses around) It's actually pretty good, should use it all summer. Save lots of fuel!!
    BUT, it has to be during the day. DH found out that the hose doesn't hold the heat if you shower in the evening. lol
    But, it's only been a week so far. SHOULD have shower back by next Friday or Sat. I HOPE.
    Good luck to everyone!

  • 18 years ago

    We started ours on Mother's Day weekend and we are still not done. We had an issue with the bullnose tile, which was supposed to be in stock but ended up taking another couple weeks. Then we had a problem with the Danze Roman Tub Faucet. When the plumber tried installing it, he broke the hose in the personal shower component. Danze technical support promised to ship out the part immediately, and we are still waiting. I've spoken to them several times and they don't tell the truth. So that's another delay. Then we are also waiting for the glass shower enclosure, promised last week but not in yet. So, if you're lucky, it seems like a remodel can take place in a month. But it seems like unforseen things happen and it could take much longer.

  • 18 years ago

    Mine took 10 weeks, with an original contracted-for end date of 4 weeks. Admittedly, most of the added time was me making the GC do it right the 3rd time!! LOL!! I laugh now because I hired this GC solely because (a) we had worked together before and he knew I was a perfectionist and (b) I knew he would make it right no matter what with very little ego-block. But, the old saying of it costing twice as much and taking three times as long as planned proved largely true.

  • 18 years ago

    Any more feedback?
    This has really made me rethink this. I guess its a good dose of reality but months on end is making me reconsider. What I did with my kitchen -- it is taking long, but I have been doing everything in stages so it has been totally usable the entire time- I guess I really have no choice with the bathroom if I want to replace the tile though do I ? disappointing.

  • 18 years ago

    Hi Sheila - well, as I mentioned yesterday, all of the contractors I spoke to seemed to think my bathroom would take 2-3 weeks. I have a small 5'3" x 8'3" bathroom with single sink, toilet, and shower over tub - not moving anything, and tiling to the ceiling in the shower area, halfway up the other walls, and the entire floor (what there is of it - LOL).

    Can't tell you yet what it actually *took* - just that all the contractors seemed pretty consistent on what it *would* take.

  • 18 years ago

    My DIY took 3 months. This included me working nights and weekends, but also at least 7 days off from work, to get over some "humps". I should have kept track of the actual hours better.
    Casey

  • 18 years ago

    We are still in the process of final contractor selection, but the front runner says they will schedule demo when all materials are in hand. No starting work then waiting for the tile or the vanity or whatever to arrive.

  • 18 years ago

    If you've got everything on hand and you're not changing the footprint, I see no reason why it can't be done in 2 weeks. I had a friend who hired a guy to change out everything in an 8x8 bath and it was done in 2 weeks. The tub/shower surround wasn't tile, but it included vanities, floor, lighting, etc.

    We DIY'ed our 16x20 master bath, while both working full time, completely changing the floor plan, and ripping up the subfloor to do so, and were done in 5 months. I can't imagine why a contractor would take longer, unless he's just not working there very often. We do track our time, and spent about 400 hours between the two of us, not counting the granite vanity top and glass shower doors, which we hired out.