Jan in Wisconsin's problem with the ugly/misplaced receptacle brought up a question for me. Does your builder always have you sign an electrical plan? Is it a full-scale drawing of your house plan with the electricals drawn in on it? Does the electrician draw it during or after the walk-through with the owners?

I'm clueless. And thinking we ought to take an extra copy of our plan and draw our own electrical plan while we have time to think about it. (We haven't even applied for a building permit yet, so now would be a good time.)

Comments (18)

  • 19 years ago
    last modified: 11 years ago

    Dh has built numerous houses and none had an electrical plan per se. We didn't have one either. I wanted to see the space before deciding what would go where. If I were to do it again I would make one myself.

  • 19 years ago
    last modified: 11 years ago

    You should have an electrical plan made up. I made a draft and then we had our lighting supplier designer review them. It took several iterations to get it right.
    I would recommend having a lighting designer help you with the plan.

    Keep in mind that even with a detailed plan - which the electricans appreciated having, minor mods will be required during the install - mostly locations of switches due to framing in the way.

    You need to be careful when you are developing your plan because every extra switch, outlet, or light fixture you add - above what is in the contract - will cost you. And those up charges can really add up quickly.

  • 19 years ago
    last modified: 11 years ago

    We had an electrical plan come with our plans that the architect drew up. We have a few changes but the main design was with the plans.

  • 19 years ago
    last modified: 11 years ago

    I had an electrical plan too. The electrician had a floorplan on the house that showed every circuit, outlet, jbox, switch, etc. Presumably that was what his bid was based on. Then we went through the plan and I did my changes which we signed off on. It made it really easy to see if errors were made when the house was done - and there were several errors, some involving a decent amount of work to fix. It's hard to argue with a detailed drawing - I would think it would protect both the buyer and the GC/contractor.

  • 19 years ago
    last modified: 11 years ago

    I drew my own electrical layout but I have the advantage of some electrical design and installation experience. You should have a design for each of your major construction areas -- framing, HVAC, plumbing, etc. -- as a start point. As chiefneil says, approved designs protect all parties. The question of who draws up the design depends on how you are designing the house. An architect or design-build company should provide this service. You could use a lighting designer but they are not usually concerned about receptacles used for non-lighting purposes.

  • 19 years ago
    last modified: 11 years ago

    Our electrical plan was done by our architect. However, we got to put everything where we wanted them, ie. light switches, light fixtures, garage openers. He basically gave us the plan and we marked it up. He may have tweeked a thing or two or suggested certain placements. But then our changes were put into his autocad system.

    Once we actually got to the electrical stage of our build, we met with the electrician several times and made some more changes.

    Luckily we are the GC so we have no change orders to pay and everyone we have worked with has been pretty accomodating.

  • 19 years ago
    last modified: 11 years ago

    Thanks, ALL. I'm getting it. DH and I have some definite ideas about the electricals so I think once we get our floorplan drafted we'll get a copy and mark it up with lights, receptacles, Internet, TV, Telco. Then give that to the draftsman to input and produce the Electrical Plan from.

    Here's an even (maybe) dumber question: When you meet with the electrician, with the Electrical plan in hand, and mark up changes, how do you get a copy of that marked up plan? I'm a fanatic for records and don't want something I've signed disappearing into someone else's hands for awhile without me having a copy. Do we just drive over to Kinko's right then with the electrician and use their oversized printer or what?

  • 19 years ago
    last modified: 11 years ago

    Bump.

    Anybody know how I get that copy of the marked-up plan from the electrical walk-through?

  • 19 years ago
    last modified: 11 years ago

    Once again, do not depend on every receptacle, switch, and light being placed to the inch as specified on the plans. First, some construction details, especially framing, may require moving things a bit. Secondly, if the one who drew those plans is not REALLY conversant with the NEC, the electrician might need to modify the plans to comply with the code. And consider the situation where a homeowner is insistent on being consulted about every minute deviation from the plans. That really bogs down the job and causes tremendous cost increases for the electricians. Perhaps work will actually stop repeatedly while waiting for the homeowner approval. I have had that happen AND THEN the homeowner raised hell because the job was going so slowly- their construction loan was running out. But I see both sides of the situation. As a consumer, I want to control the outcome of jobs done for me.

  • 19 years ago
    last modified: 11 years ago

    busdriver: I want to avoid slowdowns, too. That's why I think when we do the walk-thru with the electrician, plan in hand, we mark all the changes right then and there. Is he going to later find a lot of obstacles to making those changes?

  • 19 years ago
    last modified: 11 years ago

    There will inevitably be some later changes necessary.

  • 19 years ago
    last modified: 11 years ago

    pinktoes

    The bus driver is correct - and you will have to work with your eletcrician on the placement of the items you want. I can't tell you how many studs were in the wrong place or blocked what would have been an otherwise perfect spot for a switch. I started to think the framers added studs just to make it hard to run the wires.

    I would get 2 copies of the plan - one for you and one for the electrician. When he makes a chnage - you make one on your copy. My plans were the size of blueprints - and kinkos can make those. The other thing I did (again - put this in the over the top category) was used highlight markers with different colors to identify recessed lights of different sizes, low voltage lights, floods , decorative fixtures , etc. Each light fixture and recessed also had a number - and that number was used to refer items when we were ordering our light fixtures. This system helped find things quickly on the plan and make sure we ordered lights, hosuings, trims abd bulbs (don't forget the bulbs!) for every item on the plan.

    I allowed the electrican to put outlets close to where I wanted them in most cases - except for a few specific places where they had to be exact (for outlets inside cabinets - the outlets have to be on the wall so when they put the cabinet in, the outlet isn't blocked by the cabinet framing).

    For switches, I allowed the electricians to place nearby what I had in the plans. But if they wanted to move to a different wall - they asked me first.

    The centering of lights was my biggest area of concern. If you want a light centered dead on in a room or on a wall - mark that on the plan. On almost every wall where it mattered - we had to add framing members in to make sure the box was centered. Smae thing for ceiling lights. If you don't specify this - they will place the boxes to the closest framing member and you may not like where the lights wind up.

    The plan will provide a visual picture of all lights, swtiches, and outlets which is easier for many (maybe not not all) to work off and review than a list items with text instructions. The placement of items should be specified if there are special requirements. Also - if you have heavy chandeliers or lights - you need to specify the weight to be supported. In some cases - special boxes may be need to hold the weight of the light or ceiling fan.

    The other thing you will want to do is get copies of the installation instructions for all of your appliances and make sure the electrician has those. We found several issues where the electrican had assumed a typical install for a microwave and refrigerator - and that was going to be an issue for the appliances we selected. If they have the install instructions - it will state the amperage required and the placement of the outlets for these units.

    One last thing - if you have exterior lights that are large - make sure you tell the elctrician the size of the light back plate so that they can install a siding block with the correct size face plate to mount to. I did not do this and have had to make custom face plates for all of my exterior lights. They installed siding blocks that were too small and I did not realize it unitl after the siding and stone was on!

    The plan will help you do an inventory check after the dywall is done. I am still finding boxes that were covered over by the drywallers. Take lot's of pictures after the electrical is in and before drywall so that you can find this stuff later.

    By far - the electrical was the hardest thing in our project to manage. We have a lot of lights and spaghetti factory full of wires. Even with the plan - we still had issues, but they were minor and workable. I cannot imagine trying to keep track of an electrical installation without a detailed plan. This is not something you want to wing.

    Hope that helps.

  • 19 years ago
    last modified: 11 years ago

    I don't have a plan, but since I am also the builder, I can make it up as I go. LOL! I am spraying a dot of paint on the studs where I want an outlet and where I want switches so I don't forget to put them in.

  • 19 years ago
    last modified: 11 years ago

    sniffdog: Thanks once again. You are now ready to become a licensed electrician--no??

    An architect worked with us to develop the design; a draftsman will prepare the building drawings. Our architect did not prepare any of the actual construction drawings. I just want to carefully plan and monitor the electrical install especially. As well as the framing.

    We have a G.C., so shouldn't he be the one giving his electrical sub all those details about fixture weights, etc.? He'll be buying all that.

  • 19 years ago
    last modified: 11 years ago

    Sometimes for the above-counter kitchen receptacles, a specific height is desired so that tiles in the backsplash are in a certain relationship to the receptacle. I do understand that. How often has the tile setter specified a height, but not noted whether the height he lists is the bottom, top, or center of the receptacle! And is the receptacle to be vertical or horizontal? And the boxes are installed when only the subfloor is in place. Calculations from the subfloor are his responsibility. So if another trade wants to specify locations, fine. But they must be VERY specific. I use adjustable (for thickness) boxes in such situations.

  • 19 years ago
    last modified: 11 years ago

    I don't know about being an electrician - but I learned enough to ask the right questions and in some cases lend a hand to keep costs down.

    The GC might provide that detail - mine did not. I would imagine that varies from builder to builder. I do know that if you don't write down what you want - the chances of getting it are low.

    Ask your architect if he knows lighting design. If he does - then he could make up a plan. Again this varies - our architect is not a lighting specialist. However - the plans we bought on line that our architect used as a starting point did have an electrical plan - and we used that as a starting point and added on to that.

    I would also ask your builder if his lighting supplier offers design services. If they do - and you can find someone is really knows lighting design - that might be another route. This is what we did - and we are very happy with the result.

    Good luck with the planning.

  • 19 years ago
    last modified: 11 years ago

    We did a walk thru with the electrician and he showed us the standard places for the outlets, cable lines, phone lines and lighting. Then we showed him where we wanted all of our customized things.

    I never actually saw an official electrical plan.